Attachment B Technical Specifications.doc

DOC document 1 MB Posted

Attached to
ITB 12192 Road Improvements at Saddle Mountain State Natural Area
Solicitation number
S-63400-00013766
Issued by
Clatsop County, Oregon

About this file

This document is a Technical Specifications file for road improvements at Saddle Mountain State Natural Area, prepared by the Oregon Parks and Recreation Department (OPRD) for a public infrastructure project. The project involves comprehensive road rehabilitation, including mobilization, erosion control, traffic management, asphalt milling, base grading, aggregate placement, hot mix asphalt concrete installation, and culvert marker placement. The work is located within the Saddle Mountain State Natural Area and will involve road surface reconstruction, with specific requirements for a 16-foot wide roadway, including a 2-inch base and 1.5-inch overlay of hot mix asphalt concrete. The project is identified by Project Number 37498 and Contract Number 12192, with technical specifications dated January 2025.

The contract includes detailed measurement and payment provisions, with compensation based on unit prices for specific work items such as mobilization, erosion control, traffic control, and various road construction activities. Payment will be calculated using weight tickets for aggregate and asphalt materials, with measurements made to the nearest 0.01 ton. The contractor is responsible for all labor, equipment, materials, and incidentals required to complete the work, with specific requirements for traffic control, safety measures, and coordination with park management. The project emphasizes maintaining park access, emergency vehicle routes, and minimal public disruption during construction, with strict guidelines for work hours, notifications, and site management.

View the file

Other files

File Type Posted
BID TABULATION~5.docx DOCX document
Attachment A-2 Pricing Form~1.xlsx XLSX spreadsheet
ITB 12192 Saddle Mountain Road Improvements.docx DOCX document
A-2 Pricing Form Rev Addenda 2.xlsx XLSX spreadsheet
Addendum 1 to ITB 12192 Road Improvements at Saddle Mtn SNA~2.docx DOCX document
Addendum 2 to ITB 12192 Road Improvements at Saddle Mtn SNA~1.docx DOCX document
Attachment C Plans Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Parks and

Recreation

Department

TECHNICAL SPECIFICATIONS

For

Road Improvements At Saddle Mountain State Natural Area Project Number: 37498 Contract Number: 12192 Date: January 2025 Prepared by: John Seevers Oregon Parks and Recreation Department

Technical Services Division

725 Summer Street NE, Suite C

Salem, Oregon 97301

THIS PAGE INTENTIONALLY LEFT BLANK

TABLE OF CONTENTS

PAGE

1SECTION 01010 – SUMMARY OF WORK

3SECTION 01019 – CONTRACT CONSIDERATIONS

5SECTION 01025 – MEASUREMENT AND PAYMENT

9SECTION 01028 – MODIFICATION PROCEDURES

11SECTION 01090 – REFERENCE STANDARDS

13SECTION 01300 – PROJECT MANAGEMENT & COORDINATION

17SECTION 01570 – TRAFFIC CONTROL

23SECTION 02200 – EARTHWORK

29SECTION 02220 – Cold Plane Pavement Milling

31SECTION 02700 – ASPHALTIC CONCRETE PAVING AND RESURFACING

35SECTION 02765 – pavement MARKINGS

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01010 – SUMMARY OF WORK

PART 1 – GENERAL

1.01

DESCRIPTION OF WORK

A.

Requirements of the “State of Oregon General Conditions for Public Improvement Contracts” January 1, 2012 edition, REVISED 11/13/2024 apply to the Technical Specifications and Plans for this Project.

B.

Contractor shall furnish all permits, labor, equipment, tools, supervision, materials and incidentals required to complete the Work in accordance with the Plans, Specifications and terms of the Contract. Also refer to the Invitation to Bid (“ITB”) and the Contract for additional requirements and information. Work includes, but is not limited to, the following:

1. Mobilization

2. Erosion Control

3. Traffic control

4. Temporary Portable Bridge

5. Asphalt milling and removal

6. Base grading, shaping and compaction

7. Base Aggregate

8. Hot Mix Asphalt Concrete 2" Base

9. Hot Mix Asphalt Concrete 1-1/2" Overlay

10. Aggregate Shoulder

11. Installing culvert markers (OFCI) C.

Project is for the Oregon Parks and Recreation Department, herein referred to as Owner.

D.

The Owner’s Authorized Representative, herein referred to as Project Manager is:

John Seevers Oregon Parks & Recreation Department

725 Summer St NE, Ste. C

Salem, OR 97301

(503)-298-1868 1.02

CONSTRUCTION STAKEOUT AND LAYOUT

A.

The Plans show approximate locations and dimensions of existing utilities and facilities adjacent to and in the proposed Work, as shown on the Plans, for the Contractor’s information. Final stakeout of the construction Work shall be provided by Contractor and approved by Project Manager. The Contractor will be solely responsible for locating all existing utilities within the Project sites. No additional stakeout will be provided by the Owner.

B.

Contractor is responsible for properly laying out the Work and verifying lines and measurements of the Work. Contractor to verify the figures shown on the Plans before any construction takes place or products are ordered. Report errors or inaccuracies to the Project Manager for resolution before commencing Work.

1.03

OWNER OCCUPANCY

A.

The Owner will not close any areas of the Saddle Mountain State Natural Area (the “Park”) except the area under construction and temporary closures as approved in advance by the Park Manager for approved limited durations.

1.04

CONTRACTOR USE OF SITE AND PREMISES

A.

Construction Operations: Limited to construction areas around the project sites.

B.

Contractor shall at all times conduct their operations to ensure the greatest public safety and least inconvenience to the public and adjacent land owners.

C.

Contractor shall receive approval from the Project Manager as to the staging and stockpiling of the equipment and materials used on the Project.

D.

Storage of material onsite is at Contractor’s own risk.

E.

Hauling Restrictions: Comply with all legal load restrictions in the hauling of material. Load restrictions shall meet state load restrictions.

F.

Parking: Contractor and Subcontractors shall park at approved locations, and as directed by the Project Manager.

G.

Rest rooms: Contractor shall provide temporary rest room facilities for its workers and Subcontractors as required.

1.05

CONSTRUCTION SCHEDULE

A.

Refer to the Contract for construction schedule, Substantial and Final Completion dates.

B.

Contractor shall not begin any on-site Work of this Project before required permits have been obtained, a proposed construction schedule is submitted, along with required submittals in accordance with Section 01300, and the Project Manager has given written approval of the submittals and construction schedule provided by the Contractor.

1.06

SPECIFICATION LANGUAGE

A. Portions of the Specifications are written in imperative and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” shall be included by inference where a colon (:) is used within sentences or phrases. Example: Aggregate: ASTM C33.

END OF SECTION

SECTION 01019 – CONTRACT CONSIDERATIONS

PART 1 – GENERAL

1.01

SPECIAL PROJECT REQUIREMENTS

A. The Park will be closed for construction, areas surrounding the construction site and driveways, parking lots and walkways in the area shall be posted Park and Road Closed until the Substantial Completion date. If required safety devices are to be installed for the few residences that are located at the at the lower portion of the roadway, Work shall not commence until such devices are installed. The Contract Time will not be extended based on working Days lost due to the non-compliance of safety devices.

B.

Construction operations shall be restricted to normal daily operating hours and the normal Open/Close schedule of the Park but not outside the hours of 6AM – 6PM, Monday – Fridays unless otherwise arranged and approved in writing by the Project Manager and Park Manager.

C.

No Work shall be performed on any legal holiday or weekends without prior written approval from the Park Manager.

D.

Smoking is not allowed at the project site, except at locations approved by the Park Manager and Project Manager.

E.

Contractor shall notify the Project Manager in advance when Contractor, Subcontractor or any employees of either such shall be on Park property.

F.

Contractor shall comply fully with manufacturer’s instructions and recommendations. Should manufacturer’s instructions conflict with Contract Documents, Contractor shall request clarification from Project Manager before proceeding.

G.

Contractor shall furnish all planning, investigation, material, equipment, labor and permits to complete the Work in accordance with the Plans, Specifications and terms of this Contract, except as specified otherwise herein.

H.

All changes to normal traffic patterns must be clearly explained in the Traffic Control Plan and approved by the Project Manager. Road Closed Signage shall be placed at the lower roadway section prior to the Grindy Bridge location and one other location where a logging road intercepts the subject roadway.

I.

For paving projects, Contractor shall stay on roadway surfaces at all times, unless approved by the Project Manager. No staging of equipment or storage of materials shall be allowed off the existing roadway surface without the Project Manager approval.

1.02

EXISTING UTILITIES

A.

In general, no existing utilities were found within the area of work, however Contractor shall take due precaution when excavating to be mindful of the potential that a utility may exist and was not identified on the plan or in the specifications.

B. Utilities damaged by Contractor’s activities shall be reestablished, to the satisfaction of the Park Manager and/or Project Manager. If the Contractor fails to repair the damaged utility, costs for repairing the utility shall be deducted from final payment.

C.

Contractor shall comply with Oregon Administrative Rules Division 952, Relating to Abandoned Underground Facilities. An “Abandoned Facility” means an underground facility that is no longer in service and is physically disconnected from the operating facility that is in service. In addition to notification requirements of this rule, Contractor shall notify Project Manager of any Abandoned Underground Facilities which are discovered during the course of the Project.

1.03

PROGRESS CLEANING

A.

Contractor shall maintain areas free of waste materials, debris, and rubbish at all times. Contractor shall maintain site in a clean and orderly condition. Contractor shall provide legal debris disposal (or recycle waste materials if feasible) off-site for all debris generated while working on this Project.

B.

Contractor shall remove debris and rubbish from pipe chases and other closed or remote spaces on a daily basis.

C.

Contractor shall remove waste materials, debris and rubbish from the site immediately upon such materials becoming unfit for use in the Work. In the event this material is not removed, Project Manager will give one notification in writing as to the removal of such waste materials, debris and rubbish. If the Contractor does not clean up the waste materials, debris and rubbish within 24 hours as directed by the Project Manager, the Project Manager reserves the right, but does not have the duty, to have the material removed and the expense shall be deducted from payment to the Contractor. This debris shall be removed at the end of each workday.

D.

Contractor shall provide legal debris disposal off-site for all debris generated while working on this Project.

PART 2 – MATERIALS (Not Applicable)

PART 3 – EXECUTION (Not Applicable)

END OF SECTION

SECTION 01025 – MEASUREMENT AND PAYMENT

PART 1 – GENERAL

1.01

DESCRIPTION

A.

All Payments shall be as provided in the State of Oregon General Conditions for Public Improvement Contracts. References to other documents in the Plans and in the Specifications, such as ODOT and ODOT/APWA are not intended to include references to measurement and payment that may exist in those other documents. Specific Measurements for Work Items are detailed in this Specification Section 01025.

B.

If no Item exists for a portion of the Work, include the costs in a related Item.

C.

No separate payment will be made for any item that is not specifically set forth in the Solicitation, and all costs therefore shall be included in the prices named in the Solicitation for the various appurtenant items of Work.

D.

Quantities listed in the Contract Document do not govern final payment. Payments to the Contractor will be made only for actual quantities of Contract items performed in accordance with terms of the Contract and for items of Work actually performed under Change Orders.

E.

Indirect costs, such as supervision and overhead, profit, and the General Conditions specified in the Contract, all shall be allocated to each item as applicable for Work defined in the item. No separate payment will be made to the Contractor for these items.

F.

Payments shall include full compensation for all labor, equipment, and materials necessary to perform the specified Work.

G.

Partial payments to be made under the Contract shall be based on the percent of Work complete as approved by the Project Manager according to the State of Oregon General Conditions for Public Improvement Contracts.

H.

Material requiring weighing to be weighed by scale. Allowable scales with Project Manager approval are commercial vehicle weigh scales, plant automatic weight batching and mixing control printer system, or plant weight hopper printer system.

Pay Items to be measured by weight shall include all Contractor costs for furnishing appropriate weight tickets and transporting materials to the scales or to check weighing.

The scales shall conform to ORS 618, and NIST Handbook 44, and shall be:

• Licensed by the Oregon Department of Agriculture;

• Technically suitable for weighing the materials;

• Properly installed and maintained; and

• Accurate to the required tolerances.

The Owner may periodically have a representative at the scales to observe the weighing procedures.

1.02

ITEM MEASUREMENT AND PAYMENT

NOTE: See Pricing Form. Payment shall include full compensation for all labor, equipment, materials and incidentals needed to accomplish the Work as shown and described in the Contract Documents.

A.

ITEMS - SITE RELATED:

1.0 Mobilization:

a.

Measurement and payment for this bid item shall be made on a lump sum basis. The amount to be allowed for Mobilization in the partial payment to be made under the Contract will be as follows:

b.

When 5% of the total original Contract amount is earned from other items, 50% of the amount bid for Mobilization, or 2.5% of the original Contract amount, whichever is the least, less normal retainage, will be paid.

c.

When 10% of the total original Contract amount is earned from other items, 100% of the amount bid for Mobilization, or 5% of the original Contract amount, whichever is the least, , will be paid.

d.

Upon completion of all Work on the Project, payment of any amount bid for Mobilization in excess of 5% of the total original Contract amount will be paid.

e.

The above schedule of progress payments for Mobilization shall not limit or preclude progress payments otherwise provided by the Contract.

2.0 Erosion Control:

a. Measurement and payment for erosion control Items shall be made on a lump sum basis.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

3.0 Traffic Control:

a. Measurement and payment for traffic control Items shall be made on a lump sum basis.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

c. See Section 01570 for project specific details and requirements.

4.0 Asphalt Milling and Removal:

a. Measurement and payment for asphalt milling and removal shall be made on a per linear foot of roadway basis. The road width used for determining the milled area shall be 16’. Roadway sections less than or greater than this width shall be considered incidental.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

c. Saw cutting shall be incidental to this work.

d. Removing and hauling milling spoils off the project shall be incidental to this pay item.

5.0 Base Grading, Shaping and Compaction:

a. Measurement and payment for base grading, shaping and compaction shall be made on a per linear foot of roadway basis. The road width used for determining the milled area shall be 16’. Roadway sections less than or greater than this width shall be considered incidental.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents 6.0

Base Aggregate:

a. Measurement and payment for base aggregate shall be made on a ton in place basis measured to the nearest 0.01 tons. The quantities for payment shall be calculated from weight tickets collected at the job site.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

7.0

Hot Mix Asphalt Concrete 2” Base:

a. Measurement and payment for HMAC installed as the 2 base shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

b. The Work includes providing the labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

8.0

Hot Mix Asphalt Concrete 1 ½” Overlay:

a. Measurement and payment for HMAC installed as the 1 ½” overlay shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

b. The Work includes providing the labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

9.0 Aggregate shoulder:

a. Measurement and payment for aggregate shoulder shall be made on a ton in place basis measured to the nearest 0.01 ton. The quantities for payment shall be calculated from weight tickets collected at the job site.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

10.0 Install Culvert Markers:

a. Measurement and payment for installing culvert markers shall be based on a Lump Sum Basis.

b. The Work includes providing all labor, equipment, materials and incidentals needed to complete the Work in conformance with the Contract Documents.

c. Owner shall furnish the Carsonite posts and stickers as detailed in the Contract Documents.

PART 2 – MATERIALS (not applicable)

PART 3 – EXECUTION (not applicable)

END OF SECTION

SECTION 01028 – MODIFICATION PROCEDURES

PART 1 – GENERAL

1.01

SUMMARY

A.

This Section includes the administrative requirements for Requests for Information (“RFI”) and Proposal Requests (“PR”).

B.

Prior to execution of a Change Order (“CO”), the following documents shall be submitted as indicated.

1.02

REQUEST FOR INFORMATION

A.

General:

1.

RFI are requests for information originated, prepared and submitted by the Contractor to the Project Manager only when the Contractor is unable to determine from the Contract Documents, the material, process, system or Work to be installed. Endeavor to keep the number of RFI to a minimum. For critical or emergency items, contact Project Manager at once.

2.

If Project Manager clarification results in additional cost or time, do not proceed with the Work indicated by the RFI until the Project Manager provides an approved copy of the RFI or until a PR is fully-executed. A CO will be processed to include this type of change.

3.

Submit RFI on form provided by Project Manager.

4.

Number RFI sequentially; include date submitted.

5.

Identify Project, pertinent Plan sheet, detail number, and Specification Section.

6.

Specifically identify time response information as required to avoid impact on construction schedule or cost. Project Manager will endeavor to respond to proper RFI within 7-Days, if possible.

B.

RFI shall include written and graphic solutions proposed by Contractor. Project Manager will determine if Contractor’s proposal is in accordance with Contract Documents and design intent of Project.

1.

Contractor's failure to make a reasonable effort to propose realistic solution may result in RFI's being returned with no action.

2.

RFI that request information that is clearly shown in the Contract Documents will be considered frivolous/improper and will be returned with no action.

C.

Maintain current and accurate RFI Log.

1.03

PROPOSAL REQUEST

A.

General:

1.

Provide quotations for extra Work or changes in Work when requested by the Project Manager, on a PR form to be provided by the Project Manager.

2.

Provide a detailed itemization of the costs to the degree necessary for evaluation by the Project Manager. Indicate if a change to the Contract Time is warranted.

B.

Maintain current and accurate PR log.

C.

Issuance of a PR is not an authorization to proceed with extra or changed Work until fully executed by Owner and Contractor. Do not proceed with the Work indicated in the PR until the Project Manager provides a fully-executed copy. A CO will be processed to include approved PR.

PART 2 – MATERIALS (not applicable)

PART 3 – EXECUTION (not applicable)

END OF SECTION

SECTION 01090 – REFERENCE STANDARDS

PART 1 – GENERAL

1.01

REFERENCED STANDARDS:

All Work shall conform to the issue of following referenced standards which is current at date of Contract. Whenever the following abbreviations are used in these Contract Documents, they are to be construed the same as follows:

AA

Aluminum Association

AASHTO

American Association of State Highway and Transportation Officials

ACI

American Concrete Institute

ACM

American Construction Manual

AISC

American Institute of Steel Construction

ANSI

American National Standards Institute

APA

American Plywood Association

APWA

American Public Works Association

ASHRAE

American Society of Heating, Refrigerating and Air-Conditioning Engineers

ASTM

American Society for Testing and Materials

AWPA

American Wood Preservers' Association

AWS

American Welding Society

AWWA

American Water Works Association

CRSI

Concrete Reinforcing Steel Institute

FM

Factory Mutual

FS

Federal Specifications (“FS”)

ICEA

Insulated Cable Engineers Association

IEEE

Institute of Electrical and Electronic Engineers

JIC

Joint Industrial Council

MIL

Military Standards

NEC

National Electric Code (Oregon Amended)

NECA

National Electrical Contractors Association

NEMA

National Electrical Manufacturers Association

NESC

National Electrical Safety Code

NFPA

National Fire Protection Association

ODOT

Oregon Standard Specifications for Highway Construction by the Oregon Department of Transportation

ODOT/APWA

Oregon Standard Specifications for Construction by the Oregon Department of Transportation and Oregon Chapter of APWA

OSSC

Oregon Structural Specialty Code

OSHA

Occupational Safety and Health Administration

QPL

Qualified Products Listing by the Oregon Department of Transportation, Materials and Research Section

PCI MNL

Pre-stressed Concrete Institute

SAMA

Scientific Apparatus Manufactures Association

SMACNA

Sheet Metal and Air Conditioning Contractors' National Association

UBC

Uniform Building Code State of Oregon, Structural Specialty Code Amended

UFC

Uniform Fire Code with State and Local Amendments

UL

Underwriters Laboratories

UPC

Uniform Plumbing Code State of Oregon, Plumbing Specialty Code

WCLIB

West Coast Lumber Inspection Bureau

END OF SECTION

SECTION 01300 – PROJECT MANAGEMENT & COORDINATION

1.01

SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on the Project.

1.02

PROJECT COORDINATION

B. Coordinate with the Project Manager to locate area for mobilization, field offices and sheds, vehicle access, traffic, and parking facilities.

C. Coordinate construction operations included in Contract Documents to avoid conflicts and assure efficient and orderly installation of each part of the Work.

1. Schedule construction operations in sequence required to obtain best results where installation of one part of Work depends on installation of other components.

2. Coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair.

3. Coordinate storage or staging areas for all trades.

4. Locate and verify all utility service connection points. Coordinate actual location and depth of all utilities with utility connections. Modify designed location of points of connection to accommodate actual site locations.

5. Coordinate space requirements and installation of irrigation and/or electrical work depicted diagrammatically on Drawings. Follow routing shown for pipes and conduit as closely as practicable. Utilize spaces as efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

D. Coordinate testing and inspections by building officials and Owner’s testing and inspection services.

E. During construction, coordinate use of site and facilities through the Project Manager.

F. Comply with Project Manager procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.

G. Coordinate with Project Manager for use of temporary utilities.

H. The Contractor shall maintain Daily Reports documenting which subcontractors are on site, jobsite activities, materials deliveries, high/low temperatures and general weather conditions, meetings and significant decisions, visitors, accidents and unusual events, and other significant items. These Daily Reports shall be made available to the Project Manager upon request.

1.2 CONTRACTOR’S CONSTRUCTION SCHEDULE

A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal, Gantt-chart type, Contractor’s construction schedule within (14) days of date of Notice to Proceed and prior to commencing work. Base schedule on the construction schedule in the Contract and additional information received since the start of the project.

B. The proposed construction schedule shall be in a critical path method format and shall be updated throughout the duration of the Project to reflect the progress of the Work.

1. Revise the schedule at monthly intervals to reflect actual construction progress and activities. Issue revised schedule with progress payment requests.

2. Revise the schedule immediately after each progress meeting or other activity where revisions have been recognized or discussed. Issue the revised schedule with the associated meeting notes.

3. Revise and reissue schedule immediately if individual task schedules change more than 5 days.

a. Schedule changes for tasks requiring archaeology monitoring must be approved by Project Manager in order to assure monitor is available for revised dates.

C. Contractor shall prepare a three week look ahead schedule of upcoming work for review at progress meetings.

1. Revise the three week look ahead schedule weekly to reflect planned work.

1.3 PROJECT MEETINGS

A. General: Contractor is responsible for conducting meetings unless otherwise noted. Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Project Manager of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Contractor shall record significant discussions and agreements achieved. Distribute the meeting minutes to attendees and concerned parties, including Project Manager, within three (3) days of the meeting.

B. Preconstruction Conference: Owner Project Manager will coordinate with Contractor to schedule and conduct a preconstruction conference before starting construction, at a time convenient to both parties, but no later than fifteen (15) days after Notice to Proceed.

1. Attendees: Authorized representatives of Owner, Project Manager, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Designation of key personnel, their responsibilities and duties.

b. Lines of communication.

c. Procedures for processing Submittals, RFIs, Proposal Requests and Change Orders.

d. Review required project start up submittals.

1) Initial construction schedule.

2) Certified Erosion and Sediment Control Inspector qualifications.

3) Erosion and Sediment Control Plan, if developed by Contractor.

4) Work Plan.

5) Traffic control plan and public safety.

6) Submittal list.

7) Others as required by Contract Documents.

e. Schedule and format for Progress Meetings.

f. Critical work phasing, sequencing, and long-lead items.

g. Procedures for testing and inspecting.

h. Working hours.

i. Parking availability, construction access and delivery routes.

j. Security.

k. Permits and regulations of authorities having jurisdiction.

l. Procedures for processing Applications for Payment.

m. Owner's occupancy requirements.

n. Preparation of record documents.

C. Preinstallation Conferences: Contractor shall conduct a preinstallation conference for each construction activity that requires coordination between construction disciplines, and as specified in Contract Documents.

1. Attendees: Installer and representatives of subcontractors, manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting.

2. Schedule preinstallation conference a minimum of one week prior to commencing related work. Advise Project Manager of scheduled meeting dates.

3. Review conditions of installation, preparation, and installation procedures, coordination with related work, and protection of adjacent work.

4. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Contractor shall conduct progress meetings weekly or as discussed at preconstruction meeting.

1. Attendees: Project Manager and Contractor Superintendent, with representative subcontractors, suppliers, and other entities concerned with current progress or involved in planning, coordination, or performance of future activities. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda:

a. Review minutes of previous progress meeting.

b. Review field observations, problems, decisions, and corrective actions.

c. Review Contractor's Construction Schedule:

1) Review work progress since last meeting and planned progress during succeeding work period.

2) Review three week look ahead. Discuss testing, inspection, and/or monitoring need for proposed work.

3) Review fabrication and delivery schedules.

4) Discuss whether schedule revisions are required to ensure that the Work will be completed within the Contract Time.

d. Review present and future needs of each entity present, including the following:

1) Sequence of operations.

2) Status of correction of deficient items.

3) Status of submittals.

4) Status of RFIs.

5) Status of Proposal Requests and Change Orders.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION

SECTION 01570 – TRAFFIC CONTROL

PART 1 – GENERAL

1.01 Description

A.

This Work consists of furnishing, erecting, and maintaining temporary barricades, signs, and other traffic control devices, and provision of temporary roadways, detours, and other safeguards necessary for orderly flow of traffic during performance of the Work.

B.

The Contractor shall submit a Traffic Control Plan (“TCP”) to the Project Manager which addresses public and emergency access as related to the Project for approval. The Contractor shall update the TCP as required during the progress of the Work.

PART 2 - MATERIALS

2.01

SUBMITTALS

A.

The Contractor shall develop and provide to the Project Manager, at least fourteen (14) Days in advance of the time the traffic control will be required or haul routes employed, a TCP which will, as a minimum:

1.

Conform with the current edition of the Manual on Uniform Traffic Control Devices (“MUTCD”), as published by the U.S. Department of Transportation – Federal Highway Administration; the Oregon Supplements to the MUTCD as published by the State of Oregon Department of Transportation; and as approved by the Project Manager through the TCP.

2.

Annotate proposed location of barricades, lighting, signing, temporary striping and other traffic control devices.

3.

Provide emergency exits from buildings within and immediately adjacent to the construction site.

4.

Maintain emergency access; access to public service buildings shall be provided at all times. If driveway or mail access is to be restricted, notice shall be given to the Project Manager seven (7) Days prior to the date of the restriction.

5.

Provide public service buildings, safe and acceptable driveway access during their operating hours.

6.

Provide Road Closure Plans.

7.

Provide Detour Route Plans for local access.

8.

Channel traffic flow through the work zone per approved TCP.

9.

Ensure the plan addresses all modes of transportation, including vehicles, bicycles, pedestrians, transit, and adjacent property access.

10.

Ensure the plan shows pertinent roadway features that will be obstructed by construction activity, such as fire hydrants.

11.

Provide a TCP for all road closure and detours. Include details of detour traffic control plans for each proposed closure.

12.

Any special traffic control associated with school bus routing must be reviewed and approved by the Project Manager.

2.02

REQUIREMENTS

A.

The TCP must be approved in writing by OPRD before any Work commences.

B.

The Project Manager shall approve all temporary public service building signs. Portable Changeable Message Signs (“PCMS”) are not permitted for public service buildings.

C.

Emergency vehicle, pedestrian and bicycle access shall be maintained at all times.

D.

Vehicular and pedestrian routing on streets where the Work is not being performed shall not be revised without approval of a supplemental TCP by the Project Manager.

E.

Advance Information Signs and Warning Arrow Panels:

1.

Information Signs:

a) Black lettering on orange background.

b) List: (1) Road Closed to Park Traffic, (2) Residential Traffic Only.

c) Post two weeks before beginning the Work on the affected work zone.

2.03

COORDINATION

A.

The Contractor shall coordinate all construction to offer the least possible obstruction and inconvenience to the public. The Contractor shall have under construction no greater length or amount of Work than can be executed properly with due regards to the rights of the public.

B.

The Contractor shall coordinate all revisions to the existing TCP with the Project Manager. Traffic controls are to remain in operation unless determined to be unnecessary and confusing under the approved TCP. As Work progresses, and as conditions permit, relocated or removed traffic and street name signs shall be reset by the Contractor with new signs in their permanent locations. All damaged or lost traffic control devices shall be replaced by the Contractor at the Contractor’s expense.

2.04

NOTIFICATIONS

A.

Written approval of the TCP and/or supplemental TCP shall be obtained from the Project Manager prior to initiating Work.

B.

Written approval shall be obtained from the Project Manager before scheduling closure of any street. The notification shall give the time of commencement and completion of the Work, names of streets to be closed, schedule of operation, routes or detours.

C.

To accommodate emergency vehicle rerouting, notification shall be given to Project Manager in writing, not less than 72 hours prior to construction operations that modify existing traffic flow conditions.

2.05 Special Signs

A.

Signs with special or non-standard messages may be necessary to properly convey information to the motorist or pedestrian. The Contractor shall be responsible for installing and maintaining these signs.

PART 3 - EXECUTION

3.01 Traffic Maintenance

A.

The Contractor shall maintain a normal flow of vehicular and pedestrian traffic to prevent accidents and to protect the Work throughout the construction stages until completion of the Work. The Contractor shall make all necessary arrangements to reroute traffic, provide and maintain barriers, cones, guards, barricades, and construction warning and regulatory signs. The Contractor shall protect other portions of the Work during construction and until completion. This includes providing and maintaining barricade lights, construction signs, guards, temporary crossovers.

B.

Rerouting of traffic by the Contractor shall be limited to the shortest time necessary to provide effective construction operations. Where construction time can be reduced, the Contractor may be allowed to completely close the roadway to through traffic. Required travel lanes shall not be blocked by the Contractor’s activities, including trucks delivering materials, unless pre-approved by the Project Manager. Material deliveries and other related trucking activities shall occur in the Contractor’s protected Work or staging areas. Upon completion of a segment of Work in streets, the Contractor shall restore traffic operations to normal flow as soon as possible.

C.

The Contractor shall provide emergency vehicle access at all times throughout the Project. Temporary steel plates shall be used by the Contractor to accommodate traffic over excavation. The Contractor shall obtain approval from the Project Manager prior to restriction of access in any section of the roadway.

D.

The Contractor shall maintain pedestrian movements through construction areas. Facilities for pedestrians include provisions for the safe movement of mobility and sight-impaired individuals.

E.

The Contractor shall provide flagging if the work zone conditions pose a hazard to the public and/or at the requirement of the Project Manager. No separate item will be paid by the Owner for flagging.

3.02 Access

A.

The Contractor shall maintain limited access to other Park facilities at all times.

B.

If, during some urgent stages of construction, the Project Manager determines that temporary closure of an access to a property is unavoidable, the closure shall be coordinated with the property owners and approved by the Project Manager at least 48 hours in advance of closure. If required, alternative access and mail delivery shall be provided. Property access shall not be closed until the alternative access is available.

3.03 Safety A.

The Contractor shall provide adequate safeguards, safety devices and protective equipment and take all necessary actions to protect life, health and safety of the public and construction crew and to protect property in connection with the performance of Work covered by the Contract.

B.

The Contractor shall provide and erect all necessary standard construction signs, warning signs and detour signs to warn and protect the public at all times from injury or damage as a result of the Contractor’s operations.

C.

The Contractor shall furnish standard signs, as well as other appropriate signs prescribed by the Project Manager as applicable and necessary for the Work. Signs on posts and supports shall be erected and maintained by the Contractor in a neat and presentable condition until they are no longer necessary. When a sign is no longer necessary, the Contractor, upon approval by the Project Manager, shall take down such sign. Signs necessary for nighttime traffic control, or that remain in place during hours of darkness, shall be fully reflectorized.

D.

The Contractor shall safeguard and direct traffic after the existing signs have been removed. Preservation and maintenance of traffic control and street name signs shall be the sole responsibility of the Contractor. The Contractor, at the Contractor’s expense, shall replace signs and other traffic control devices damaged or lost by the Contractor.

E.

Areas under work zone traffic control shall be monitored at least two (2) times daily. Disturbed signs and traffic control devices shall be reset immediately. Non-applicable signs shall be removed or covered.

F.

Upon failure of the Contractor to provide necessary traffic control when ordered to do so by the Project Manager, the Project Manager may, without further notice to the Contractor, provide the necessary traffic control. The cost of the traffic control shall be deducted from any payment due the Contractor.

G.

The Contractor shall provide adequate traffic control for protection of the Work and the public at all times. The Contractor shall be liable for injuries and damages to persons and property suffered by reason of the Contractor’s operations or negligence.

3.04 Construction and Maintenance of Detours

A.

The Contractor shall provide for all on-site and off-site detours required or necessitated by the Work, including side street crossings and temporary bridges over excavation or freshly placed concrete.

B.

Detours shall be constructed and maintained in a safe condition per the approved TCP.

C.

Detours shall be removed by the Contractor when no longer required.

D.

Work zone traffic control shall be checked by the Contractor at least two (2) times per day. The Contractor shall clean, restore or replace traffic control devices that are dirty, damaged or are not functioning per the approved TCP.

E.

The Contractor shall keep all roadways clean to the satisfaction of the Project Manager to assure the safe passage of pedestrians and vehicles through the work site.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 02200 – EARTHWORK

PART 1 – GENERAL

1.01

DESCRIPTION OF WORK

A.

This Section includes the requirements for the excavation, backfill, compaction and grading of the Project site to the lines and grades shown on the Plans and required by the Specifications. Earthwork includes, but is not limited to, the following:

1.

Excavation of all material encountered to the limits shown on the Plans, including excavation and backfill for building foundations and utility trenches.

2.

Hauling and disposal or stockpiling of excess excavated material to sites secured by the Contractor and approved by the Project Manager.

3.

Locating and protecting existing facilities and utilities.

4.

Placement and compaction of fill.

5.

Grading and reshaping of grades.

6.

Furnishing and installing sub-base and base rock, soil and topsoil where shown on the Plans or required by the Specifications.

7.

Compaction of sub-grade, sub-base and base rock, soil and topsoil.

8.

All miscellaneous items of Work required to complete the Earthwork.

1.02

DEFINITIONS

A.

Excavation: Removal of material to establish sub-grade elevations regardless of the type, nature, or condition of the materials encountered. Contractor shall assume full responsibility to estimate the kind and extent of the various materials to be encountered.

B.

Rock excavation: Removal of boulders having a volume of 2 cubic yards or more, solid bedrock and ledge rock that cannot be excavated or removed by dozers with rippers, but require systematic drilling and blasting or the use of pneumatic rock splitters, hammers, and wedges. If material that is classified as rock is mechanically removed with grading equipment, the volume of material removed shall be measured and paid for as common excavation.

C.

Common excavation: Removal of all material not classified as rock excavation.

D.

Over-excavation: Removal of suitable material below the limits designated for excavation.

E.

Site Structures: Footings, foundations, slabs, pavements or other features constructed above or below ground surfaces.

F.

Unauthorized Excavation: Removal of materials beyond indicated sub-grade elevations or dimensions without direction or approval by the Project Manager.

G.

Disposal Material: Excavated material beyond the quantities required for the Project or unusable for the Project. This includes materials that are unsuitable for fill, in excess of fill quantities required, and/or contaminated.

H.

Fill (embankment): Material placed immediately on top of existing ground or excavation.

I.

Sub-grade: Uppermost surface of an excavation or embankment.

J.

Sub-base: Material placed immediately on top of the sub-grade only under the following conditions:

1.

In all areas where unstable sub-grade is present.

2.

In all areas where structural fill has been placed.

3.

In all areas where fill material is required as shown on the Plans.

K.

Base Material: Material placed immediately on top of the sub-grade or sub-base and immediately beneath the finish surface (i.e. pavement, concrete).

L.

Leveling Course: Uppermost surface of the aggregate base, usually 2" thick, used to eliminate irregularities in the contour of the aggregate base surface prior to placing asphaltic concrete.

1.03

QUALITY ASSURANCE

A.

Codes and Standards: Comply with requirements of authorities having jurisdiction.

1.04

NOTIFICATION

Notify Project Manager 48 hours prior to earthwork operations requiring observation or approval.

PART 2 – MATERIALS

2.01

FILL

A.

Soil - Soil shall be free of unsuitable materials or other characteristics detrimental to the construction of firm, dense, and sound embankments.

B.

Structural Fill - Structural fill shall be an angular, hard, durable, free draining material, visibly well graded from coarse to fine with the maximum size of 3 inches.

2.02

SUB-BASE ROCK

A.

Combination of durable sand, gravel and cobbles which contain no particle with a dimension greater than 3 inches, and no unstable material, as approved by the Project Manager.

2.03

AGGRAGATE BASE

A.

Aggregate base shall be crushed rock or as shown on the Plans; reasonably well graded from coarse to fine. Materials shall conform to the requirements of Section 0641 of ODOT/APWA.

PART 3 – EXECUTION

3.01

GENERAL

A.

Dewater as required to perform the Work. Prevent surface, subsurface, or groundwater from entering excavations, ponding on sub-grades or flooding site areas or adjacent properties

B.

Slope ground away from paved areas and building site. Avoid forming pockets that will collect and retain the free flow of surface water. Divert surface water to natural drainage courses.

C.

No excavation shall be left open more than 5 Days unless otherwise approved by the Project Manager.

D.

All excavations left open overnight shall be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation as approved by the Project Manager.

E.

Disposal material is the property of the Contractor and therefore it is the sole responsibility of the Contractor. Disposal material shall be hauled off site and completely removed from the Owner's property. Disposal of contaminated soil shall be in accordance with federal, state, and local laws and regulations.

F.

Contractor shall conduct excavation Work in such a manner as required to protect existing trees and vegetation on site.

G.

Protect structures, utilities, pavements and other facilities from damage caused by settlement, lateral movement, undermining, erosion, and other hazards caused by earthwork operations.

H.

Protect sub-grades against freezing temperatures. Provide insulation to protect as necessary.

I.

Provide measures to prevent erosion or displacement of soils, either by water or air, to adjacent site areas and properties.

3.02

EXCAVATION

Comply with local codes, ordinances and requirements of authorities having jurisdiction, including maintaining stable excavations.

B.

Excavate for pavements, storm management facilities, utilities and site structures to indicated cross sections, elevations, and grades.

C.

Unauthorized excavation to be corrected at Contractor’s expense, including remedial Work directed by the Project Manager.

3.03

SUB-GRADE AND SUB-BASE

A.

Excavation shall be carried to lines and grades shown on the Plans, and as required to accommodate specified fills (embankment), sub-base rock, base rock, paving, and concrete. Any over excavation due to faulty workmanship will be brought to grade by the Contractor at their expense.

B.

Grade Control - Establish and maintain the required lines and grades during construction operations. Check sub-grade for conformity to design grades and sections immediately before placing structural fill, sub-base and base rock.

C.

Sub-grade shall be free of ruts, depressions, and irregularities.

D.

Sub-grade Preparation –Compact excavated sub-grade prior to placing fill, sub-base rock and/or base rock as approved by the Project Manager. Sub-grade shall be thoroughly compacted by a minimum of two passes with a mechanical type compactor to obtain 95% of maximum density to a depth of 1 foot below established sub-grade elevation.

E.

Remove any unsuitable material, found, or as directed by the Project Manager, in the sub-grade and replace with a sub-base material in accordance with Section 2.02 of this Section. This mixed material layer is still classified as sub-grade.

F.

Fill Preparation

1.

Soil - Place soil in nearly horizontal layers not more than 8 inches thick. Compact each layer separately to 95% of maximum density.

2.

Structural Fill - Place structural fill in nearly horizontal layers not more than 15 inches thick in such a manner that, when compacted, it will conform to the grades and sections shown on the Plans. Distribute and manipulate the rock pieces so that voids between larger pieces are filled with smaller pieces forming a dense and compact mass. Each layer of structural fill shall be thoroughly compacted by a minimum of two passes with a mechanical type compactor to obtain a dense mass, free of pumping.

G.

Sub-base Preparation - Place the sub-base rock in nearly horizontal layers not more than 6 inches thick in such a manner that, when compacted, it will conform to the grades and sections shown on the Plans. Each 6 inch layer of sub-base shall be thoroughly compacted by a minimum of two passes with a mechanical type compactor to obtain 95% of maximum density.

3.04

BASE AGGRAGATE

A.

Aggregate base shall be located under all concrete paving, cast-in-place and precast concrete slabs and where shown on Plans.

B.

Excavate all existing materials to depths required for base rock under cast-in-place and precast concrete slabs and footings and where shown on Plans. Dispose of surplus excavated materials off-site in accordance with federal, state and local laws and regulations unless otherwise approved by the Project Manager.

C.

Placement and Compaction - Aggregate base shall be placed in such a manner and to such depth that, when compacted, it will conform to the grades and sections shown on the Plans.

D.

Compaction - Aggregate base shall be compacted to achieve not less than 95% of maximum density. Compact to achieve no visible deflection when proof rolled with a fully loaded haul truck as defined by ODOT testing method TM 158.

E.

Tolerance of aggregate surface: 0.04 foot.

3.05

GRADING

A.

General:

1.

Uniformly grade areas to a smooth surface, free of irregular surface changes; and to lines and elevations indicated.

2.

Provide smooth transitions between proposed and existing adjacent grades or elevations.

3.

Finish grades to indicated elevations within the following tolerances:

a.

Vegetated or unpaved areas: 0.05 feet.

b.

Paving areas: 0.05 feet.

3.06

DISPOSAL OF SURPLUS MATERIAL

A.

Remove all waste material, including soil, stumps, vegetation, trash and debris, and dispose of legally off the Owner’s site.

3.07

QUALITY CONTROL

A.

Protect all newly graded areas from traffic, freezing and erosion.

B.

Repair and re-establish grades to specified tolerances where completed or partially completed surfaces have become eroded, rutted, or settled due to subsequent construction operations or weather conditions.

END OF SECTION

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 02220 – Cold Plane Pavement Milling

PART 1 – GENERAL

1.01

DESCRIPTION OF WORK

A. This item shall include furnishing all materials, labor and equipment…

This is the start of the file's text. The full file is on GovTribe.