Attachment C - Construction and Demolition Sample Report.pdf
PDF 288 KB Posted
- Attached to
- New Fort Bliss Paving IDIQ Contract
- Solicitation number
- W911SG27BA002
About this file
This document is a Performance Work Statement (PWS) and supporting materials for Construction and Demolition (C&D) waste management at Fort Bliss, establishing requirements for diverting construction debris from landfills to recycling and reuse facilities.
The primary requirement mandates that contractors achieve a minimum 60% diversion rate of all C&D materials and debris generated from construction and demolition activities, as specified under Executive Order 13693 and the Planning for Federal Sustainability in the Next Decade initiative. If contractors cannot meet this diversion goal, they must submit written justification to the Environmental Division. Contractors must submit monthly C&D Diversion Reports by the 10th of each month detailing all materials resold, recycled, reused, or landfilled, with copies to the Solid Waste Program Manager (cynthia.m.hernandez38.civ@army.mil) and the Contract Officer Representative. Materials eligible for diversion include salvaged items, scrap metal, masonry products, gravel, asphalt, concrete, and rock, with topsoil specifically excluded. Suitable concrete and asphalt materials may be crushed and recycled or stockpiled at Fort Bliss on a temporary basis, with all recycled materials removed by project completion. Contractors must provide proof of recycling or diversion in monthly waste management reports detailing weights of diverted materials and landfilled debris. The Contract Officer will review the diversion plan in coordination with the Directorate of Public Works-Environmental Division. Attachment A provides detailed C&D Monthly Diversion Report instructions and form templates, while Attachment B lists local El Paso-area C&D recyclers and their material processing capabilities.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
./00 12' 3'+4/**'5 (66$3(2* 0,)56/007 �8'-1*/9' "+5'+ ?0,))/)@ 6(+ A'5'+,0 !12*,/),B/0/*C #'8* �'-,5'> +'D1/+'2 ,00 6'5'+,0 6,-/0/*/'2 5/9'+* 4/)/414 (6
<EF
(6 -()2*+1-*/() ,)5 5'4(0/*/() G���H 4,*'+/,02 ,)5 5'B+/2 6+(4 0,)56/0027 �6 &,2 9,0/5 +',2() 6(+ B'/)@ ,B0' 4''* *&/2 5/9'+2/() @(,0> )''52 3+'2')* +',2()/)@ �?I$ �)9/+()4')*,0 �/9/2/()7
23'-/6/-,*/()2 ./00 /)-015' 21B4/22/()
JK
L
MJNOPLMOJPQR
4()*&0C �/9'+2/() '3(+* (6 ,00 4,*'+/,02 +'2(05> +'-C-0'5> +'12'5> 0,)56/00'5 ./00 B' +'3(+*'5
BC
:E*& (6 4()*&
GS**,-&4')*
SH
�)9/+()4')*,0 �/9/2/()> !(0/5 I,2*' ?+(@+,4 T,),@'+> -C)*&/,747&'+),)5'U;V7-/9W,+4C74/0 -(3C "66/-'+ '3+'2')*,*/9' G�" H7
�*'42 B' 12'5 /)-+',2' 5/9'+2/() +,*'2 /)-015' 2,09,@'5 /*'42 G4,C B' +'12'5 ,2 3,+* (6
BC
(*&'+2H> 2-+,3 4'*,0> 4,2()+C 3+(51-*2> @+,9'0> ,23&,0*> +(-X> *(32(/0 G',+*& 6/00 /2 23'-/6/-,00C '8-015'5H7 ,**,-&'5 0/2* (6 0(-,0 +'-C-0'+2
GS**,-&4')*
YH7
!1/*,B0' 4,*'+/,02 4''* 2*,)5,+52 6(+ +'-C-0'Z+'12' 4,C 5/+'-*0C +'-C-0/)@ 6,-/0/*C7 S00 21/*,B0' -()-+'*'Z,23&,0*/- 4,*'+/,02 4,C B' -+12&'5> +'-C-0'5> 2*(-X3/0'5
5'2/@),*'5
2/*'
A(+*
Y0/22
*'43(+,+C B,2/27 S00 +'-C-0'5Z+'12'5 -()-+'*'Z,23&,0* 4,*'+/,02 412* B' +'4(9'5 6+(4 A(+* Y0/22
BC
')5 (6 3+(['-* 2-&'510'7 \2' (6 4,*'+/,0 3+(-'22'5 6(+ 6/00> -()2*/*1*'5 ,23&,0*/- 3,9'4')* -()2*/*1*'2 +'-C-0/)@7
\3() 5/9'+2/() (6 +'-C-0'5Z+'12'5 4,*'+/,02> 2&,00 21B4/* 3+((6 (6 +'-C-0/)@Z5/9'+2/() 4()*&0C I,2*' T,),@'4')* '3(+*2 5'*,/0/)@ (6 5/9'+*'5 4,*'+/,0 ,)5 .'/@&*2 (6 5'B+/2 0,)56/00'57
./00 +'9/'.
30,) -((+5/),*/() (6 ?1B0/- I(+X2$ �)9/+()4')*,0 �/9/2/()7
This page intentionally left blank.
������������������������������������������ �!"#�$������%�&!'�#"����#��"���$�("�"���" �)��#�������������*��"��+�����*��",������� "#�$�������)���������"�����-����.��$ ��(�*�.�� ("�*�,�+"#"���*���/"��*� �#�*�,�,"$��"�*�"��0�/-��-���"���##��($" ���������"���",����" �)����"�1�$��(0�2���)�345657*��-"��&!� �+"������(��$����86�,"��"��0�9�"�"�(��""���(�"���#��"��)��������("��("�"���" �)��#�,��:"��������������#,$"����0�;0�<-"��&!�#���-$1� �+"�������",��������"=���" ����,�����)��-"�,��:"��*����������������.#����$��"=���"#"��0�<-"��&!�#���-$1� �+"�������",����)��#�����������-"�)�$$�/��(��"=���" ��",�����(�"$"#"���>�?�<-"�@ABCBDEF�GHIAH�IJF�KBLCMEHNBJ�OIHED�/�$$����������� "�"�#����(�/-"���&!�#���-$1� �+"�������",�������"� �"0�?�<-"�KBJHAIPH�QRLSEA�����-"���#."���-���� "���)�"���-"����������+"-��$"���" �)����-"�,��:"��0�?�<-"�@ABTEPH�QRLSEA�� "���)�"���-"�,��:"��0�?�<-"�UBVEAJLEJH�@ABTEPH�WIJIXEA�Y@WZ��",�"�"�����-"�(�+"��#"�������-"� "��(�*���=����������� ��������������,���"��"���� [����-"�KBJHAIPHNJX�\]]NPEA�̂ECAEDEJHIHNVE�YK\̂ Z�����-"�(�+"��#"���"#,$�1""�"#,�/"�" �.1��-"�����������(�_))��"�����#���("��-"�"̀"��������)��-"�,��:"��0�<-"�ab�����_c���"��"=���" ������.#����-"��&!�#���-$1� �+"�������",��������-"�!adef!���$� �/���"�#���("�0�?�<-"�KBJHAIPHBA�����-"�,��#"������������)����-"��&!�,��:"��0�<-"������������)�"$ ��-��$ ��")$"����-"���#"��)��-"���#,��1�"�(�(" �.1��-"�(�+"��#"���%,��#"'������#,$"�"��-"�,��:"����� ��-���/�$$�("�"���"��-"�/���"0�g)�����.e�����������/�$$��$��#��"$1�"̀"���"�("�"��������)��-"�/���"*��-�����)��#�������-��$ ��$���."���.#���" �����-���)�"$ 0�?�<-"�hIDi�\AFEA�����-"�)���e �(�����#."��/-��-�� "���)�"�������j��� "�%�'��(��������(�+"�����������+"-��$"0�b�$��,$"����j��� "�������."�����(�" ������,��:"��0�?�<-"�kIPNMNHl�QILEmGNHE�nBPIHNBJ�)�"$ ����$� "���-"���#"��)��-"�)���$��1*��-"�����(�" �)���$��1���#."���� ��-"����""��� �"��o�<-"���#"��)��-"�)���$��1��-����-"��&!�#��"���$�/��������,���" ���*�� �� ������$� "������������)��"=���" 0���� 50��&!�#���-$1� �+"�������",����#����."���.#���" �����(��-���)��#0�2)�"����#,$"���(��$$��,,$���.$"��",�����(�.$��j�*�"#��$��-"��",��������1��-��0#0-"���� "pqr0��+s��#10#�$0�������� 2����-#"���2��&!�d���"�b���("#"���a$���c"+��" �5r�3".����1�5657�
Reporting Period: through Proposed Start Date:
(mm/dd/yy) (mm/dd/yy)
Proposed Completion Date:
Contract Number:
Delivery Order No:
Contractor: Task Order No:
Commodity Tons Diverted (T) Cost to Divert ($) Tons Landfilled (T) Cost to Landfill ($)
Concrete
Asphalt
Clean Fill
Gravel
Greenery
Scrap Metal
Wood
Cardboard
Drywall
Other:
Other:
Other:
General Debris
TOTALS
Total Diverted: Notes:
Total Landfilled:
*Percent Diverted:
(=Total ton Diverted divided by Total Diverted + Total Landfilled)
*Please note an error message will pop up for the "Percent Diverted" Box until all totals are complete.
Note 1: For an electronic workable copy of this form, please contact the Solid Manager at (915) 568-5677; cynthia.m.hernandez38.civ@army.mil
Note 2: Contractor is to attach weight tickets to this form for review by Solid Waste Manager.
Submitted by Print:
Submitted by Signature: Date:
Location/Site Delivered
Fort Bliss Solid Waste Program
Construction and Demolition (C&D) Monthly Diversion Report
Diverted Landfilled
# of Loads
Government Project Manager/Contract
Officer Representative:
Project No:
1638650904.civ Line
��� � ������������������ ���� ������!"� #$#� ������!"�� $#� %�$��&�'� ������!"� (�')�'�*'�)�!"� �+�)�,�-+�-��� ./��'��$�'�+�0����� $#�$�'�+�0����� *�����0����-� $1�+�'��$�'�+�0����� #0�2!)/-�'��-�%�-���3�!!������!-� ,�&�'-����)� ������!"��/�1�'���4'�/+�..3� ��+�-�������-� ���'��(�'!��� 5�6��0���'���-������-�� ������!"�2!��� ��#))'�--� �7898:�;<==>?@AB�CD��7:E8�F@GHG>I<�JI� ��KL::�M@DN<H� 9:89�OP<A>I@�QD<<=R�S@AH@�T<D<G@R�UM�� 7:77�V@WN>AG�X=PI� � 7YL7�S�C@DD>AZHBA�JI�[X��7:\7\�O=@]<I@��Y97�U�U<P<D@̂�JI� � �8:K�CBIZ<�JB@I�� � � E87�_D<I<D>?NG�JI� � �7:E78�;<DG<̀aBA<�CD� � �7Y897�;<==>?@AB�CD� �7898:�;<==>?@AB�CD�� ��1�!�� b79cL9bc�8Lb:� b79c\\bc�YY8K� b79c\\8c�8\8L� b79c9Y8c�9KEY� b79c\\9c�89EK� b79c878c�K:::� b79cL\8c�bLL:� b79c89Lc�b77K� K7Lcb\bc�K7:\�b79cLL7c�7bb7� b79c88\c�b:Y9� b79cE\Lc�7Lb:� b79cE\bc�LEY\� b79c\8Kc�8\LE� b79c98bc�K78L� b79cL8:c�EY\:�b79c8bLc�bb::�b79cL9bc�8Lb:�� #-+1���� � � � � � � � � � � � � � � � � d� �� ('��e� � � � � � � � � � � � � � � � � � �� 3�!�'���� � � � � � � � � � � � � � � � � d� �.�!)�3���'�!"� ,�6'�-� ��e-� � � � � � � � � � � � � � � � � � �$���� � � � � � � � � � � � � � � � � � �f�"������!g�*��6�'� � � � � � � � � � � � � � � � � � �h�1�'� � � � � � � � � � � � � � � � � � �� 0����� #�/��!/�� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �3�++�'� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �0�i�)�0����� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �$����� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � � �h�1�'�0����-� d� d� d� d� d� d� d� d� d� d� d� d� d� d� � � � �
����0���'����
3����!"�*���� � � � � � � � � � � � � � � � � � �3��+�-����!� ���� � � � � � � � � � � � � � � � � � �,��'-� � � � � � � � � � � � � � � � � � �%�!)�j-� � � � � � � � � � � � � � � � � � �$���'-� � � � � � � � � � � � � � � � � � �3�6�!��-� � � � � � � � � � � � � � � � � � �4��--� � � � � � � � � � � � � � � � � � �4�+-/�g����-��'� ����������k� � � � � � � � � � � � � � � � � d�2!-/�����!�� � � � � � � � � � � � � � � � � ���+�'� d� � � d� � � � � � � � � � � � � � ����-���� d� � � d� � � � � � � � � � � � � � �$�)�!"� � � � � � � � � � � � � � � � � � �� %��)� ��!�-1�)� d� � � � � � � � � � � � d� � d� d� � �$�'/��/'��� d� � � � � � � � � � � � d� � d� d� � �*'����)� � � � � � � � � � � � � d� � d� d� � �h�1�'� � � � � � � � � � � � � d� � d� d� � �� �ll��mn ol�p���������� qr� s�tu�v w x� ��tytz�
This page intentionally left blank.
| Reporting Period: |
| through: |
| Proposed Start Date: |
| Contract Number: |
| Delivery Order No: |
| COR: |
| Contractor: |
| Task Order No: |
| of LoadsConcrete: 1 |
| LocationSite DeliveredConcrete: Clint |
| TonsDivertedTConcrete: 2 |
| CosttoDivertConcrete: 5 |
| TonsLandfilledTConcrete: |
| CosttoLandfillConcrete: |
| of LoadsAsphalt: |
| LocationSite DeliveredAsphalt: |
| TonsDivertedTAsphalt: |
| CosttoDivertAsphalt: |
| TonsLandfilledTAsphalt: |
| CosttoLandfillAsphalt: |
| of LoadsClean Fill: |
| LocationSite DeliveredClean Fill: |
| TonsDivertedTClean Fill: |
| CosttoDivertCleanFill: |
| TonsLandfilledTCleanFill: |
| CosttoLandfillCleanFill: |
| of LoadsGravel: |
| LocationSite DeliveredGravel: |
| TonsDivertedTGravel: |
| CosttoDivertGravel: |
| TonsLandfilledTGravel: |
| CosttoLandfillGravel: |
| of LoadsGreenery: |
| LocationSite DeliveredGreenery: |
| TonsDivertedTGreenery: |
| CosttoDivertGreenery: |
| TonsLandfilledTGreenery: |
| CosttoLandfillGreenery: |
| of LoadsScrap Metal: |
| LocationSite DeliveredScrap Metal: |
| TonsDivertedTScrapMetal: |
| CosttoDivertScrapMetal: |
| TonsLandfilledTScrapMetal: |
| CosttoLandfillScrapMetal: |
| of LoadsWood: |
| LocationSite DeliveredWood: |
| TonsDivertedTWood: |
| CosttoDivertWood: |
| TonsLandfilledTWood: |
| CosttoLandfillWood: |
| of LoadsCardboard: |
| LocationSite DeliveredCardboard: |
| TonsDivertedTCardboard: |
| CosttoDivertCardboard: |
| TonsLandfilledTCardboard: |
| CosttoLandfillCardboard: |
| of LoadsDrywall: |
| LocationSite DeliveredDrywall: |
| TonsDivertedTDrywall: |
| CosttoDivertDrywall: |
| TonsLandfilledTDrywall: |
| CosttoLandfillDrywall: |
| of LoadsOther: |
| LocationSite DeliveredOther: |
| TonsDivertedTOther: |
| CosttoDivertOther: |
| TonsLandfilledTOther: |
| CosttoLandfillOther: |
| of LoadsOther_2: |
| LocationSite DeliveredOther_2: |
| TonsDivertedTOther_2: |
| CosttoDivertOther_2: |
| TonsLandfilledTOther_2: |
| CosttoLandfillOther_2: |
| of LoadsOther_3: |
| LocationSite DeliveredOther_3: |
| TonsDivertedTOther_3: |
| CosttoDivertOther_3: |
| TonsLandfilledTOther_3: |
| CosttoLandfillOther_3: |
| of LoadsGeneral Debris: |
| LocationSite DeliveredGeneral Debris: |
| TonsDivertedTGeneral Debris: |
| CosttoDivertGeneralDebris: |
| TonsLandfilledTGeneralDebris: |
| CosttoLandfillGeneralDebris: |
| TotalCosttoDivert: 5 |
| TotalTonsLandfilled: 0 |
| TotalCosttoLandfill: 0 |
| text34: 2 |
| Printed Name: |
| Date: |
| Proposed End Date_af_date: |
| text32: 2 |
| TotalTonsDiverted: 2 |
| Notes: asdfasfdasfddsafasdfasfas |
| text33: 0 |
| text35: 100 |
| Text10: |
| 0: |
| 1: |
| 2: |
Project No: