Attachment B - Specifications_Box Trucks_2026-10-21.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
GSA - Refrigerated Box Trucks (QTY: 2)
Solicitation number
47QMCA27Q0002
Issued by

About this file

This is a specifications attachment for a GSA solicitation requiring the purchase of two (2) refrigerated box trucks. The vehicles must be new Ford F650 models manufactured in 2026 or 2027 with fewer than 500 miles, configured as 4X2 rear-wheel drive in white with gas fuel and a 26,000 lbs GVWR. Each truck must be equipped with either a Thermo King or Carrier refrigeration unit capable of maintaining temperatures between -20°F and +50°F. The trucks must comply with GSA SIN 581 specifications for 12-16 foot refrigerated box trucks and include specific codes (BUOD, FWOD, BDDR, VBR5, BDST, TPMS, CL64, VB14) and tire pressure monitoring systems. Delivery is required no later than October 28, 2026, to Edinburg, Texas, with the delivery address and point of contact to be provided at time of award. The contractor must schedule delivery with the designated POC at least 24 hours in advance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Box Trucks

Requirement Title: Refrigerated Box Trucks
Agency: GSA
QTY: 2
Specifications or Equal:ComplyException
Vehicle Type: Ford F650
Trim: N/A
Vehicle Year: 2026 or 2027
QTY: 2
Condition: New (under 500 miles)
Drivtetrain: 4X2 RWD
Color: White
Fuel Type: Gas
GVWR: 26,000 0lbs
GCWR: n/a
Payload Capacity: n/a
Towing Capacity: n/a
*Additional Requirements (or Equal):
Reference GSA SIN 581
4X2 Refrigerated Box Truck 12-16ft
Codes: BUOD, FWOD, BDDR, VBR5, BDST, TPMS, CL64, VB14)
Refrigeration Unit: Thermo King or Carrier
Temperature Range: -20 degrees F to +50 degrees F
NOTE: See attachment "USDA SIN 581 refer Express Desk" for SIN 581 and code definitions
Delivery:
Delivery NLT 10/28/26
Delivery Address:
Edinburg, TX (Full address provided at time of award)
Delivery POC:
To be provided at time of award. Delivery must be schedule with POC 24 hours prior.

File details come from the government source that posted it. Updated .