Attachment B Schedule of Items.doc
DOC document 87 KB Posted
- Attached to
- Roadway Surface Blading/Grading Needed for the Mark Twain National Forest Federal contract opportunity
- Solicitation number
- 12444526Q0014
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Schedule of Items pricing template for roadway maintenance services across eight ranger districts and units of the Mark Twain National Forest. The contract covers a Base Year (5/1/2026–4/30/2027) plus four option years through 4/30/2031. Contractors must provide unit pricing for surface blading maintenance (single-lane and double-lane roadways measured in miles), culvert installation and replacement (18-inch and 24-inch diameter in both corrugated metal pipe and HDPE materials, measured in linear feet), and crushed aggregate supply in five size classifications (1-inch clean, 1-inch base, 2-inch clean, 2-inch base, and 3-inch to 6-inch clean, measured in tons). The eight service areas are Salem Ranger District, Houston-Rolla Ranger District, Potosi-Fredericktown Ranger District, Poplar Bluff Ranger District, Eleven Point Ranger District, Ava Unit, Cassville Unit, and Willow Springs Unit. Estimated quantities vary by location and service type, ranging from 50 to 150 miles for surface blading and 30 linear feet or units for culvert work and 15 tons for aggregate materials.
The solicitation uses a firm-fixed-price model with Lowest Price Technically Acceptable (LPTA) evaluation methodology. Quantities are estimated and subject to change based on funding availability and bids received; not all line items will necessarily be awarded in each contract year. Contractors must submit unit prices for each service line item across all five contract years to enable government evaluation of pricing consistency and total cost. The award is anticipated to be issued by the Department of Agriculture Forest Service covering multiple counties across Missouri including Barry, Stone, Christian, Taney, Ozark, Douglas, Howell, Oregon, Ripley, Carter, Wayne, Butler, Iron, Madison, St. Francious, St. Genevieve, Bollinger, Washington, Phelps, Texas, Laclede, Pulaski, and Wright.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amended RFQ 12444526Q0014 (1).pdf | ||
| Solicitation Amendment Document.pdf | ||
| Attachment D Wage Determination .pdf | ||
| Attachment A Experience Questionnaire.pdf | ||
| Attachment C Statement of Work 26-30.docx | DOCX document | |
| 12444526Q0014 Commercial Services RFQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price Description Quantity*
Base Year Option Option Option Option
Year 1 Year 2 Year 3 Year 4
2029 2030
5/1/26-4/30/27 5/1/27-4/30/28 5/1/28-4/30/29 5/1/29-4/30/30 5/1/30-04/30/31
5. MAINTENANCE – SURFACE BLADING and CULVERTS
5.1 - SALEM RANGER DISTRICT
5.1.1. Single Lane
50.0 Mile
5.1.2. Double Lane
100.0 Mile
5.1.3. Installation of CMP Culverts - 18” dia.
L.F.
5.1.4. Replacement of CMP Culverts – 18” dia.
L.F.
5.1.5. Installation of CMP Culverts - 24” dia.
L.F.
5.1.6. Replacement of CMP Culverts – 24” dia.
L.F.
5.1.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.1.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.1.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period
Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
5/1/26-4/30/27 5/1/27-4/30/28 5/1/28-4/30/29 5/1/29-4/30/30 5/1/30-4/30/31
5. MAINTENANCE – SURFACE BLADING, CULVERTS and AGGREGATE (cont.)
5.2 - HOUSTON-ROLLA RANGER DISTRICT
5.2.1. Single Lane
50.0 Mile
5.2.2. Double Lane
50.0 Mile
5.2.3. Installation of Culverts - 18” dia.
L.F.
5.2.4. Replacement of Culverts – 18” dia.
L.F.
5.2.5. Installation of Culverts - 24” dia.
L.F.
5.2.6. Replacement of Culverts – 24” dia.
L.F.
5.2.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.2.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.2.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
2026 2027 2028 2029
5.3 – POTOSI-FREDERICKTOWN RANGER DISTRICT
5.3.1. Single Lane
50.0 Mile
5.3.2. Double Lane
150.0 Mile
5.3.3. Installation of Culverts - 18” dia.
L.F.
5.3.4. Replacement of Culverts – 18” dia.
L.F.
5.3.5. Installation of Culverts - 24” dia.
L.F.
5.3.6. Replacement of Culverts – 24” dia.
L.F.
5.3.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.3.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.3.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
5/1/26-4/30/27 5/1/27-04/30/28 5/1/28-4/30/29 5/1/29-4/30/30 5/1/30-4/30/31
5.4 - POPLAR BLUFF RANGER DISTRICT
5.4.1. Single Lane
50.0 Mile
5.4.2. Double Lane
50.0 Mile
5.4.3. Installation of Culverts - 18” dia.
Each
5.4.4. Replacement of Culverts – 18” dia.
Each
5.4.5. Installation of Culverts - 24” dia.
L.F.
5.4.6. Replacement of Culverts – 24” dia.
L.F.
5.4.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.4.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.4.9 Crushed Aggregate – 1” Clean 15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year periods.
Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
2029 2030
5/1/26-4/30/27 5/1/27-4/30/28 5/1/28-4/30/29 5/1/29-4/30/30 5/1/30-4/30/31
5. MAINTENANCE – SURFACE BLADING, CULVERTS and AGGREGATE (cont.)
5.5 - ELEVEN POINT RANGER DISTRICT
5.5.1. Single Lane
50.0 Mile
5.5.2. Double Lane
150.0 Mile
5.5.3. Installation of Culverts - 18” dia.
L.F.
5.5.4. Replacement of Culverts – 18” dia.
L.F.
5.5.5. Installation of Culverts - 24” dia.
L.F.
5.5.6. Replacement of Culverts – 24” dia.
L.F.
5.5.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.5.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.5.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton $________ $_______
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
5.6 - AVA UNIT
5.6.1. Single Lane
50.0 Mile
5.6.2. Double Lane
100.0 Mile
5.6.3. Installation of Culverts - 18” dia.
L.F.
5.6.4. Replacement of Culverts – 18” dia.
L.F.
5.6.5. Installation of Culverts - 24” dia.
L.F.
5.6.6. Replacement of Culverts – 24” dia.
L.F.
5.6.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.6.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.6.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
2028 2029 2030
5.7 - CASSVILLE UNIT
5.7.1. Single Lane
50.0 Mile
5.7.2. Double Lane
50.0 Mile
5.7.3. Installation of Culverts - 18” dia.
L.F.
5.7.4. Replacement of Culverts – 18” dia.
L.F.
5.7.5. Installation of Culverts - 24” dia.
L.F.
5.7.6. Replacement of Culverts – 24” dia.
L.F.
5.7.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.7.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.7.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year period Not all bid items may be awarded each year.
SCHEDULE OF ITEMS
Task/Subtask Estimated Unit Unit Price Unit Price Unit Price Unit Price Unit Price
Description Quantity*
Base Year Option
5/1/26-4/30/27 5/1/27-4/30/28 5/1/28-4/30/29 5/1/29-4/30/29 5/1/30-4/30/31
5.8 - WILLOW SPRINGS UNIT
5.8.1. Single Lane
50.0 Mile
5.8.2. Double Lane
75.0 Mile
5.8.3. Installation of Culverts - 18” dia.
L.F.
5.8.4. Replacement of Culverts – 18” dia.
L.F.
5.8.5. Installation of Culverts - 24” dia.
L.F.
5.8.6. Replacement of Culverts – 24” dia.
L.F.
5.8.7. Installation of HDPE Culverts – 18” dia.
L.F.
5.8.8. Installation of HDPE Culverts – 24” dia.
L.F.
5.8.9 Crushed Aggregate – 1” Clean
15 Ton $_______
5.1.10 Crushed Aggregate – 1” Base
Ton
5.1.11 Crushed Aggregate – 2” Clean
Ton
5.1.12 Crushed Aggregate – 2” Base
Ton
5.1.13 Crushed Aggregate – 3” to 6” Clean
Ton
*Quantities are estimated and may change based on bids received.
The award of bid items and quantities awarded on bid items will be determined based on the availability of funds. Quantities are subject to change for the option year periods.
Not all bid items may be awarded each year.
File details come from the government source that posted it. Updated .