Attachment B - Quarterly Summary Report.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- ITB-14198
- Issued by
- Leon County, Florida
About this file
Attachment B - Quarterly Summary Report for Irrigation System Management Services
This is a quarterly reporting form required by the Florida Department of Management Services (DMS) for contractors providing Irrigation System Management Services under contract DMS-2526-032. The form functions as a mandatory submission document that must accompany each quarterly invoice and documents all irrigation system maintenance activities, inspections, and repairs performed during the service period. The contractor must document scheduled versus actual service dates, completion status of system damage repairs (including sprinkler head replacements and pipe crack repairs), quarterly inspection findings per the Statement of Work Section 2.1.5.3, leak detection activities, and detailed component-level maintenance for sprinkler heads, zone controllers, rainfall shutoff sensors, and valve boxes. The report requires itemization of minor repairs completed and identification of any major repairs needed with associated proposals. The form must be signed by both the contractor's senior representative and the facility manager or designee, with original submission required alongside the quarterly invoice and a copy provided to the facility manager. The five-year initial contract term beginning January 1, 2026, is subject to five additional renewal years contingent upon annual performance evaluations and fund availability.
The reporting form establishes performance accountability mechanisms for irrigation maintenance services across multiple state-owned facilities in Tallahassee and Tampa, including the Capitol Circle Office Complex and the First District Court of Appeal. Contractors must demonstrate adherence to service schedules requiring twice-weekly watering from April through October and once-weekly service from November through March, with operations limited to between 10:00 pm and 6:00 am and water application restricted to no more than 3/4 inch per session. Performance standards include potential financial penalties with invoice deductions ranging from 5% to 10% for substandard service at specific sites. Funding is allocated from the SB2500 Special Categories - Contracted Services line item for fiscal year 2025/2026, with the Department reserving the right to terminate the contract with 30 days' notice if performance standards are not met or to seek alternative service providers.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B - QSR
| ATTACHMENT B – QUARTERLY SUMMARY REPORT | |
| Irrigation System Management Services; DMS-25/26-032 | |
| (This Form Must Be Submitted with Quarterly Invoice Pursuant to Section 1.7, Statement of Work) | |
| Date of this Invoice: | Location Name: |
| Contract Quarterly Amount: | Amount of this Invoice: |
| Quarterly Walk-Through On: | With Whom: |
Irrigation System Service Dates Scheduled Actual
| Indicate the Services Provided During the Service Visit: | Completed (Yes, No, or N/A) | Completion Date | Comments | |
| System Damage Reported | ||||
| Sprinkler Heads Replaced | ||||
| Pipe Cracks Repaired | ||||
| Temporary Repairs Made | ||||
| Quarterly Inspection | ||||
| (Statement of Work Section 2.1.5.3) | Completed (Yes, No, or N/A) | Completion Date | Comments | |
| Leak Detection Inspection | ||||
| Leak Detection Repairs | ||||
| Spinkler Heads | ||||
| * | Number Replaced | |||
| * | Number Repaired | |||
| * | Number Reoriented or Realligned | |||
| Zone Controllers | ||||
| * Programming Verified | ||||
| * Settings Adjusted | ||||
| Rainfall Shutoff Sensor | ||||
| *Zone Coverage Confirmed | ||||
| *Sensors Cleaned | ||||
| * Sensors Calibrated | ||||
| *Manual Tests Performed | ||||
| Valve Boxes | ||||
| *Boxes Adjusted | ||||
| *Valves Tested | ||||
| *Inspected for Leaks | ||||
| Minor Repairs Made: | ||||
| Major Repairs Needed: |
Proposal Provided (Y/N):
| Comments and Descriptions: | ||
| If needed, attach a separate sheet with problems, solutions, and comments. | ||
| Contractor’s Senior Representative | Facility Manager or Designee | |
| Name: | ||
| Signature: | ||
| Date: | ||
| Original with Quarterly Invoice (Yes / No) | ||
| Copy given to Facility Manager (Yes / No) |
Page &P of &N
File details come from the government source that posted it. Updated .