This is a Mechanical Roof Plan attachment related to a cooling tower refurbishment project at the County Service Complex in Merritt Island, Florida. The document provides technical drawings and specifications for the mechanical systems associated with the roof installation at the facility located at 2575 North Courtenay Parkway, Merritt Island, Florida 32953. The plan illustrates the layout and positioning of mechanical equipment, including cooling tower components, piping arrangements, and related HVAC infrastructure necessary to support the refurbishment work. The drawings serve as technical guidance for contractors performing the removal and replacement of structural steel components, cooling tower fill material, cooling tower fan motor, and pump motors as outlined in the project scope of work.
The mechanical roof plan functions as a critical reference document for bidders and contractors to understand the spatial requirements, equipment placement, and integration points for the cooling tower refurbishment project. This attachment enables contractors to accurately assess material requirements, labor coordination, and installation sequencing. The plan ensures that all parties involved in the project have a clear understanding of the mechanical system configuration and can submit accurate bids based on the detailed technical specifications and layout requirements depicted in the drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Inv__Specs.pdf | ||
| Attachment_D__Substitution_Form.pdf | ||
| Attachment_A__Draft_Contract.pdf | ||
| Attachment_C__Structural_Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
BD
P
M
TS
SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION SYMBOL DESCRIPTION
SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION
SYMBOL DESCRIPTION
200A
RHC-1-1
AHU-1
VTU-1-1
-PACKAGED TERMINAL AIR CONDITIONER
(PTAC)
-HYDRONIC REHEAT COIL
-NEW FLAT OVAL DUCT
-ELECTRIC DUCT HEATER
(W/ PANEL CLEARANCE)
-FLEXIBLE CONNECTION
-ACCESS DOORS, VERTICAL OR HORIZONTAL
-INLINE CENTRIFUGAL FAN
-STAINLESS STEEL DUCTWORK
-DOOR GRILLE
-UNDERCUT DOOR
-SPIN-IN TAKE-OFF
-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE -RECTANGLE-TO-ROUND TAKE-OFF
DNUP
-TRANSITION, SQUARE TO ROUND
UP W/IN FLOORDOWN
-CEILING EXHAUST
-CEILING RETURN
24x12
-STANDARD BRANCH TAKE-OFF
-RADIUS ELBOW
-TRANSITION, ECCENTRIC
-FLEXIBLE DUCT
-CHANGE OF ELEVATION
-DUCT ELBOW, NEGATIVE PRESSURE, RETURN
-DUCT ELBOW, EXHAUST
DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN
-TRANSITION, CONCENTRIC
-SQUARE THROAT ELBOW
W/TURNING VANES
-RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
-SQUARE THROAT TEE
-RADIUS TEE
-ROUND DIFFUSER
-SUPPLY REGISTER OR GRILLE
-RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
(VERTICAL MOUNT, SIDEWALL)
-EXISTING DUCTWORK TO REMAIN
-EXISTING DUCTWORK TO BE REMOVED
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
-CEILING DIFFUSER, ROUND NECK
-CEILING DIFFUSER, RECTANGULAR OR
SQUARE NECK (CEILING DIFFUSERS
ARE 4-WAY THROW UNO)
M-1
-TEMPERATURE SENSOR
-MOTORIZED CONTROL DAMPER
-HUMIDISTAT/HUMIDITY SENSOR
-THERMOSTAT/TEMPERATURE SENSOR
-REVISION REFERENCE
-DETAIL REFERENCE: TOP-DETAIL#,
BOTTOM-DRAWING# SHOWN ON
-PRESSURE SENSOR
-DUCT SMOKE DETECTOR
-CONNECT TO EXISTING
-DEMOLISH TO POINT INDICATED
FF -FINAL FILTERS
DDC -DIRECT DIGITAL CONTROLS
PRS -PRESSURE REDUCING STATION
SP -STATIC PRESSURE
-CFM (CUBIC FEET PER MINUTE)
P -CHANGE IN PRESSURE
CV -CONSTANT AIR VOLUME
-ROOFTOP AIR HANDLING UNITRTU
RS/L -REFRIGERANT SUCTION & LIQUID LINES
CL
-OUTSIDE AIR LOUVEROAL
-VARIABLE AIR VOLUMEVAV
-SUPPLY AIRSA
-ROOFTOP HEAT PUMPRHP
-REHEAT COILRHC
-REVOLUTIONS PER MINUTERPM
-RETURN AIRRA
-POLYVINYL CHLORIDE PIPEPVC
-PSI GAUGEPSIG
-POUNDS PER SQUARE INCHPSI
-PRESSURE REDUCING VALVEPRV
-OUTSIDE AIROA
-NOT TO SCALENTS
-NORMALLY OPENNO
-NORMALLY CLOSEDNC
-LINEAR DIFFUSERLD
-LEAVING WATER TEMPERATURELWT
-LEAVING AIR TEMPERATURELAT
-GALLONS PER MINUTEGPM
-FEET PER MINUTE
-FIRE DAMPER
-FAN COIL UNIT
-ENTERING WATER TEMPERATURE
-ENTERING AIR TEMPERATURE
-DOWN
-CONDENSING UNIT
-CUBIC FEET PER MINUTE
-CHANGE IN TEMPERATURE
-COOLING TOWER
-CEILING DIFFUSER
-CENTER LINE
-BRITISH THERMAL UNIT
-BRAKE HORSEPOWER
-BOTTOM OF PIPE
-ACCESS PANEL
-ABOVE FINISHED FLOOR
FPM
FD
FCU
EWT
EAT
DN
CU
CFM
T
CT
CD
BTU
BOP
BHP
AP
AFF
-AIR HANDLING UNITAHU
MBH -THOUSAND BTUs PER HOUR
AFD -ADJUSTABLE FREQUENCY DRIVE
ESP -EXTERNAL STATIC PRESSURE
KW -KILOWATT
MCA -MINIMUM CIRCUIT AMPS
MOCP -MAXIMUM OVER CURRENT PROTECTION
UNO
TSP -TOTAL STATIC PRESSURE
-VOLTS/PHASEV/PH
VFD -VARIABLE FREQUENCY DRIVE
-UNLESS NOTED OTHERWISEFLA -FULL LOAD AMPS
-CONTROL VALVE
-45° PIPE RISE (R) / DROP (D)
-CONDENSER WATER SUPPLY
-CONDENSER WATER RETURN
-CHILLED WATER SUPPLY
-CHILLED WATER RETURN
-CONDENSATE
-HOT WATER RETURN
-HOT WATER SUPPLY
-REFRIGERANT LIQUID
-REFRIGERANT SUCTION
-VALVE ON RISER
-CAP
-CONNECTION, BOTTOM
-CONNECTION, TOP
-COUPLING
-ELBOW, 90°
-ELBOW, 45°
-ELBOW, TURNED DOWN
-ELBOW, TURNED UP
-TEE, OUTLET DOWN
-TEE, OUTLET UP
CWS
CWR
CHWS
CHWR
RL
RS
-FLOW SWITCH
-CHECK VALVE
-PSI REG.
-SOLENOID VALVE
-STRAINER
-GAS COCK
-BUTTERFLY VALVE
-CALIBRATING BALANCING VALVE
-BALL VALVE
-GATE VALVE
-UNION
PC -PUMPED CONDENSATE
DD
-HIGH PRESSURE STEAM SUPPLY
-LOW PRESSURE STEAM SUPPLY
-MEDIUM PRESSURE STEAM SUPPLY
CR -CONDENSATE RETURN
-SLOPE DIRECTION (DOWN)
-FLEX CONNECTION
-O.S.&Y. GATE VALVE
-THREE-WAY CONTROL VALVE
-THERMOMETER
- P-TRAP
-TWO-WAY CHECK VALVE
EQUIP.
-MANUAL VENT
-PRESSURE GAUGE
-RELIEF VALVE
-FLOW METER
-WATER METER
-INLINE PUMP
-INLINE PUMP
CTU - CONSTANT TERMINAL UNIT
VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
VTU - VARIABLE TERMINAL UNIT
PTU - PARALLEL TERMINAL UNIT
STU - SERIES TERMINAL UNIT
-AIR HANDLING UNIT
-REHEAT COIL
-AIR DISTRIBUTION DEVICE
-NEGATIVE RELATIVE PRESSURE
-POSITIVE RELATIVE PRESSURE
-NEUTRAL RELATIVE PRESSURE
-HIGH PRESSURE STEAM RETURN
-LOW PRESSURE STEAM RETURN
-MEDIUM PRESSURE STEAM RETURN
-BACKDRAFT DAMPER
MOD -MOTOR OPERATED CONTROL DAMPER (MOD)
-PACKAGED TERMINAL AIR CONDITIONERPTAC
-PIPE ANCHORS
-CONCENTRIC REDUCER
-ECCENTRIC REDUCER
-STEAM TRAP
-FLOW DIRECTION
-SHEET NOTE CALLOUT
-SHEET NOTE CALLOUT
-SHEET NOTE CALLOUT
-EXHAUST DUCT UP THROUGH SLAB W/
-EXHAUST FAN ON ROOF W/ DUCT DOWN
THROUGH ROOF
-CEILING MOUNTED ACCESS DOOR
-RECTANGULAR DUCT SECTION UP, EXHAUST
-RECTANGULAR DUCT SECTION UP,
-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,
-ROUND DUCT SECTION UP
-FLAT OVAL DUCT SECTION UP
SUPPLY OR OUTSIDE AIR
NEGATIVE PRESSURE, RETURN
FAN ON ROOF ABOVE
-ABOVE FINISHED ROOFAFR
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME WITH ELECTRIC HEAT
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME, FAN POWERED
VOLUME, FAN POWERED, WITH ELECTRIC
HEAT
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
12 / 8
HVAC GENERAL NOTESHVAC ABBREVIATIONSHVAC SYMBOL LEGEND
HVAC EQUIPMENT TAGS
HVAC PIPING SYMBOL LEGEND
8"10x8
24x12
12x8
HPS
MPS
LPS
CD
HWR
HWS
HPR
MPR
LPR
H
VOLUME WITH ELECTRIC HEAT
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL
EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT.
DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION
STANDARD.
SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.
COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND
EQUIPMENT OF ALL TRADES.
LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.
ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS
AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK.
REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT
EQUIPMENT FURNISHED.
ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR
MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH
BRANCHES, UPSTREAM OF SPLIT.
PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR
DETAILED REQUIREMENTS.
VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR
DISTRIBUTION DEVICES.
PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL
UNITS.
PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.
INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE
PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.
ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS
DIRECTED BY OWNER.
MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND
FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE
LOCATIONS.
DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI.
UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE
NEAREST PLUMBING DRAIN.
SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH
POINTS IN CHILLED WATER AND HOT WATER PIPING.
PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH
NEC-110.26.
24x12
24x12
S
MV
FM
M
T
UC
TAG
CFM
AHU NUMBER
AHU NUMBER COIL NUMBER
AHU NUMBER
TERMINAL NUMBER
TERMINAL UNIT TYPE
CFMM
FM
-MANUAL BALANCING DAMPER
-AIR FLOW MEASURING STATION
-MOTOR OPERATED CONTROL DAMPER (MOD)
-COMBINATION FIRE & SMOKE DAMPER (WITH ACCESS PANEL)
-FIRE DAMPER (WITH ACCESS PANEL)
SA-1 -SOUND ATTENUATOR
-SMOKE DAMPER (WITH ACCESS PANEL)
STATE AND NATIONAL CODE REQUIREMENTS: CONFIRM IN STRICT COMPLIANCE TO THE LATEST ENFORCED EDITION OF THE
STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION, AND THE FOLLOWING CODES:
FLORIDA FIRE PREVENTION CODE, 8TH EDITION (2023)
FLORIDA BUILDING CODE, 8TH EDITION (2023)
FLORIDA PLUMBING CODE, 8TH EDITION (2023)
FLORIDA MECHANICAL CODE, 8TH EDITION (2023)
FLORIDA FUEL GAS CODE, 8TH EDITION (2023)
FLORIDA ENERGY CODE, 8TH EDITION (2023)
NFPA 70, 2020 EDITION, NATIONAL ELECTRICAL CODE.
NFPA 72, 2019 EDITION, NATIONAL FIRE ALARM AND SIGNALING CODE.
NFPA 90A, 2021 EDITION, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS.
NFPA 90B, 2021 EDITION, STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS.
NFPA 101, 2021 EDITION, LIFE SAFETY CODE.
PRODUCTS SHALL BE LISTED BY UNDERWRITERS LABORATORY, OR OTHER INDUSTRY-APPROVED TESTING AGENCY.
APPLICABLE CODES AND STANDARDS
7370 Cabot Court, Suite 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
BI
D
S
ET
12" = 1'-0"
5/
/2
8:
:1
AM
C :\R ev it
L oc al s\
_M er rit t I sl an d
C
SC
C T_
M
EP
_R
_c ha se .b ur kh al te r.r vt
BR
EV
AR
D
C O
U N
TY
M
ER
R
IT
T
IS
LA
N D
SE
R
VI
C
E C
O M
PL
EX
C O
O
LI
N G
T O
W
ER
R
EF
U R
BI
SH
M
EN
T
N C
O U
R
TE
N
AY
P
KW
Y, M
ER
R
IT
T
IS
LA
N D
, F L
525083
05/19/2026
EMW
JMW
MECHANICAL
SYMBOLS, LEGEND,
NOTES AND INDEX
M-001
525083
No. Date Description
MECHANICAL ROOM
CWP-2(E)
CWP-1(E)
7370 Cabot Court, Suite 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
BI
D
S
ET
1/8" = 1'-0"
5/
/2
8:
:1
AM
C :\R ev it
L oc al s\
_M er rit t I sl an d
C
SC
C T_
M
EP
_R
_c ha se .b ur kh al te r.r vt
BR
EV
AR
D
C O
U N
TY
M
ER
R
IT
T
IS
LA
N D
SE
R
VI
C
E C
O M
PL
EX
C O
O
LI
N G
T O
W
ER
R
EF
U R
BI
SH
M
EN
T
N C
O U
R
TE
N
AY
P
KW
Y, M
ER
R
IT
T
IS
LA
N D
, F L
525083
05/19/2026
EMW
JMW
MECHANICAL FLOOR
PLAN LEVEL 2
M-101
525083
1/8" = 1'-0"1 MECHANICAL FLOOR PLAN LEVEL 2
CONDENSER WATER PUMP IS EXISTING TO REMAIN. PUMP MOTOR TO BE
REPLACED. BASIS OF DESIGN: BALDOR EM3313T / 10 HP.
KEYED NOTES
CT-1(E)
1 2 3 4 5 6
7370 Cabot Court, Suite 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
BI
D
S
ET
1/8" = 1'-0"
5/
/2
8:
:1
AM
C :\R ev it
L oc al s\
_M er rit t I sl an d
C
SC
C T_
M
EP
_R
_c ha se .b ur kh al te r.r vt
BR
EV
AR
D
C O
U N
TY
M
ER
R
IT
T
IS
LA
N D
SE
R
VI
C
E C
O M
PL
EX
C O
O
LI
N G
T O
W
ER
R
EF
U R
BI
SH
M
EN
T
N C
O U
R
TE
N
AY
P
KW
Y, M
ER
R
IT
T
IS
LA
N D
, F L
525083
05/19/2026
EMW
JMW
MECHANICAL ROOF
PLAN
M-102
525083
1/8" = 1'-0"1 MECHANICAL ROOF PLAN
PROVIDE AND INSTALL NEW SEALS AND REPLACE EXISTING SEALS ON
COOLING TOWER. PROPERLY DISPOSE OF REMOVED SEALS ONCE COMPLETE.
DRAIN COOLING TOWER TO CLEAN BASIN. UPON COMPLETION OF CLEANING,
CONTRACTOR TO PROVIDE AND INSTALL SEA-COAST PROTECTIVE COATING
FOR TOWER BASIN.
REMOVE EXISTING FILL. PROVIDE AND INSTALL NEW COOLING TOWER FILL.
REPLACE COOLING TOWER FLOAT CONTROL ARM, CONTRACTOR TO PROVIDE
AND INSTALL NEW TOWER FLOAT CONTROL ARM.
REMOVE EXISTING COOLING TOWER FAN MOTOR AND PROVIDE NEW FAN
MOTOR IN LIKE FOR LIKE FASHION. EXISTING FAN MOTOR MANUFACTURER /
MODEL: WEG / W22-CC029A. TEFC FRAME 213T. NEMA PREMIUM, 208 VOLTS 3
PHASE POWER, 7.5 HP
REMOVE EXISTING COOLING TOWER FAN SHROUD AND PROVIDE NEW FAN
BLADE ASSEMBLY, PROVIDE REPLACEMENT IN LIKE FOR LIKE FASHION.
KEYED NOTES
1.
2.
3.
4.
EXISTING COOLING TOWER TO REMAIN. COOLING TOWER SERIAL NUMBER:
147070-1/B27149A/4862SS. BELT SIZE: 2B144
CONTRACTOR TO PROVIDE LIKE FOR LIKE COMPONENT REPLACEMENT AS
INDICATED IN KEYED NOTES. CONTRACTOR TO PROVIDE SUBMITTALS FOR
APPROVAL PRIOR TO INSTALLATION.
ONLY WORK INDICATED BY KEYED NOTES IS INCLUDED IN SCOPE OF WORK.
ALL OTHER ASSOCIATED APPURTENANCES FOR COOLING TOWER ARE TO
REMAIN AS CURRENTLY INSTALLED UNLESS NOTED OTHERWISE.
CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF EQUIPMENT AND
MATERIALS FROM SITE.
GENERAL NOTES
| C001 - COVER SHEET |
| M-001 - MECHANICAL SYMBOLS, LEGEND, NOTES AND INDEX |
| M-101 - MECHANICAL FLOOR PLAN LEVEL 2 |
| M-102 - MECHANICAL ROOF PLAN |
File details come from the government source that posted it. Updated .