Add_2__RevisedDrawingSheetM101.pdf
PDF 287 KB Posted
- Solicitation number
- B-2-26-42
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This is a mechanical floor plan drawing for the Cooling Tower Refurbishment project at Brevard County's Service Complex in Merritt Island, Florida, prepared by TLC Engineering Solutions, Inc. The drawing, dated September 15, 2026, depicts the mechanical room layout at Level 2 and identifies two key components requiring motor replacement: the condenser water pump (existing to remain with motor replacement based on Baldor EM3313T/10 HP design basis) and the chilled water pump (existing to remain with motor replacement). The drawing is part of the bid set documentation for ITB B-2-26-42, with sealed bids due September 14, 2026 at 11:00 a.m. and a pre-bid meeting scheduled for August 24, 2026 at 3:30 p.m. at the project site located at 2575 North Courtenay Parkway, Merritt Island, Florida 32953. Substantial Completion is required within 90 calendar days from Notice to Proceed, with Final Completion required within 30 calendar days thereafter, and the overall project deadline is November 26, 2026 to maintain eligibility for Energy Efficiency and Conservation Block Grant (EECBG) Program reimbursement.
The project pricing is lump sum and inclusive of all labor, materials, equipment, transportation, and facilities. A 5% bid bond is required at bid submission, with the apparent low bidder required to provide a Public Construction Bond equal to 100% of the contract price within ten days of award. The contractor must maintain $1,000,000 combined single limit General Liability and Auto Liability insurance, plus Workers' Compensation coverage, and must hold an active Class A Air Conditioning Contractor or Mechanical Contractor license with E-Verify registration. The scope includes removal and replacement of structural steel components, cooling tower fill, cooling tower fan motor, and pump motors, with all new structural steel exposed to exterior conditions requiring hot-dipped galvanization per ASTM A123 and field connections using high-strength A325 or A490 bolts per AISC methods. The contractor must provide temporary cooling at no additional cost during the refurbishment and furnish one-year equipment and one-year workmanship warranties from Substantial Completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_4.pdf | ||
| Addendum_3.pdf | ||
| Addendum_2.pdf | ||
| Add_2_PreBid_Sign_In.pdf | ||
| Addendum_1.pdf | ||
| Inv__Specs.pdf | ||
| Attachment_D__Substitution_Form.pdf | ||
| Attachment_B__Mechanical_Roof_Plan.pdf | ||
| Attachment_A__Draft_Contract.pdf | ||
| Attachment_C__Structural_Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL ROOM
CWP-2(E)
CWP-1(E)
CHP-2(E)
CHP-1(E)2
7370 Cabot Court, Suite 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
BI
D
S
ET
1/8" = 1'-0"
9/
/2
:0 0:
A
M C
:\R ev it
L oc al s\
_M er rit t I sl an d C
SC
C
T_ M
EP
_R
_C ha se
.B ur kh al te r.r vt
BR
EV
AR
D
C O
U N
TY
M
ER
R
IT
T
IS
LA
N D
SE
R
VI
C
E C
O M
PL
EX
C O
O
LI
N G
T O
W
ER
R
EF
U R
BI
SH
M
EN
T
N C
O U
R
TE
N
AY
P
KW
Y, M
ER
R
IT
T
IS
LA
N D
, F L
525083
05/19/2026
EMW
JMW
MECHANICAL FLOOR
PLAN LEVEL 2
M-101
525083
1/8" = 1'-0"1 MECHANICAL FLOOR PLAN LEVEL 2
CONDENSER WATER PUMP IS EXISTING TO REMAIN. PUMP MOTOR TO BE
REPLACED. BASIS OF DESIGN: BALDOR EM3313T / 10 HP.
CHILLED WATER PUMP IS EXISTING TO REMAIN. PUMP MOTOR TO BE
REPLACED.
KEYED NOTES
No. Date Description
1 09/15/26 OWNER CHANGES
File details come from the government source that posted it. Updated .