About this file

Pre-Bid Meeting Sign-In Sheet Summary

This is a pre-bid meeting sign-in sheet for Brevard County Purchasing Services related to ITB B-2-26-42, the County Service Complex – Merritt Island Cooling Tower Refurbishment project. The pre-bid meeting was held on August 24, 2026 at 3:30 p.m. at the project site located at 2575 North Courtenay Parkway, Merritt Island, Florida 32953. The meeting provided an opportunity for prospective bidders to tour the facility and gain clarification on project scope, specifications, and requirements prior to submitting sealed bids. Sealed bids are due September 14, 2026 at 11:00 a.m., and questions must be submitted by September 3, 2026. The work scope includes removal and replacement of structural steel components, cooling tower fill, cooling tower fan motor, and pump motors. The project must achieve substantial completion within 90 calendar days from Notice to Proceed and final completion within 30 calendar days thereafter, with a completion deadline of November 26, 2026 to maintain eligibility for Energy Efficiency and Conservation Block Grant (EECBG) Program reimbursement.

The contract is a lump-sum agreement requiring a 5% bid bond at submission and a Public Construction Bond equal to 100% of the contract price upon award. Pricing must remain firm for 90 days from bid opening and is inclusive of all labor, materials, equipment, transportation, and facilities. The contractor must maintain $1,000,000 combined single limit General Liability and Auto Liability insurance, Workers' Compensation coverage, and provide one-year equipment and one-year workmanship warranties. Prevailing wage and Build America, Buy America Act (BABAA) compliance are mandatory due to EECBG funding. The contractor must possess an active Class A Air Conditioning Contractor or Mechanical Contractor license and maintain E-Verify registration. The project accommodates a 3,900-pound cooling tower dead load and 156 miles-per-hour wind loads under Florida Building Code 8th Edition. All new structural steel exposed to exterior conditions must be hot-dipped galvanized per ASTM A123, with field connections using high-strength A325 or A490 bolts. Temporary cooling must be provided at no additional expense during refurbishment.

View the file

Other files

File Type Posted
Addendum_4.pdf PDF
Addendum_3.pdf PDF
Add_2__RevisedDrawingSheetM101.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
Inv__Specs.pdf PDF
Attachment_D__Substitution_Form.pdf PDF
Attachment_B__Mechanical_Roof_Plan.pdf PDF
Attachment_A__Draft_Contract.pdf PDF
Attachment_C__Structural_Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .