Attachment B - Construction Experience Data Sheet.docx

DOCX document 40 KB Posted

Attached to
P-993/995, F-35 AIRCRAFT SUSTAINMENT CENTER AND COMPOSITE REPAIR FACILITY, MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NORTH CAROLINA.
Solicitation number
N4008525R2515
Issued by

About this file

Attachment B is a Construction Experience Data Sheet template designed for contractors to document their past project experience when responding to a federal solicitation. The form requires detailed information about a specific construction project, including project type (new construction, renovation, etc.), contract details (prime or subcontractor), contract value, project dates, and a comprehensive description of the work performed. Contractors must provide specifics on project characteristics, self-performed work, and relevance to the current solicitation requirements, with sections for detailing unique features, construction methods, and sustainable elements.

The template is structured to capture critical information across ten distinct sections, ranging from basic firm identification and contract type to a narrative explanation of project specifics. Key elements include checkboxes for project classification, contract type (such as Firm-Fixed Price or Design-Build), work category, and spaces for providing granular details about project scope, performance, and technical complexity. The form appears specifically tailored to help evaluators assess a contractor's qualifications and past performance in construction projects, with an emphasis on demonstrating direct relevance to the solicitation's technical requirements.

View the file

Other files

File Type Posted
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
Attachment C - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment F - PIEE Vendor Access Instructions.pdf PDF
N4008525R2515.pdf PDF
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment D - DOD-CUI_Non-Disclosure Agreement.pdf PDF
Attachment E - SBSP.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

UEI Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Subcontractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third-Party sustainable certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

Attachment B (April 2022)
Page 2 of 2

File details come from the government source that posted it. Updated .