This is a set of architectural and engineering drawings for the replacement of Building 2 Air Handler Units (AHUs) at Salem VA Medical Center located at 1970 Roanoke Boulevard, Salem, Virginia 24153, under Project 658-24-102. The drawings are prepared by Charlotte Engineers, LLP (5838 Monroe Road, Charlotte, NC 28212) in collaboration with Guidon Design Inc. (1221 North Pennsylvania Street, Indianapolis, IN 46202) and are designated as "Bid Documents" with a fully sprinklered building classification.

The project involves a two-phase replacement of air handler units with comprehensive demolition and new construction work across the basement and first floor of Building 2. Key scope elements include removal of existing acoustic ceiling assemblies, installation of temporary 1-hour fire-rated smoke barrier wall construction per NFPA 241, temporary infection control barrier walls with card reader access doors, and coordination of mechanical, electrical, plumbing, and fire suppression systems. The drawings include phasing plans (GC101-GC102), life safety plans (GI101-GI102), reflected ceiling demolition and installation plans (AD111-AD113, AE111-AE113), fire alarm system details (FA001-FA200), fire suppression modifications (FX001-FX202), plumbing work (PP100-PP102), and comprehensive mechanical, electrical plans covering ductwork, piping, lighting, and power distribution. Infection control requirements specify above-ceiling work between 5:00 PM and 5:00 AM, maintenance of exit/access during business hours, provision of sticky walk-off mats and hand sanitizer at temporary doors, spill kits, and material containment protocols. The contractor is responsible for verifying all existing conditions, coordinating with VA engineering, patient safety, and infection control representatives, and ensuring all fire-rated assemblies and penetration seals meet UL-listed standards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROANOKE

BOONES MILL

BEDFORD

TROUTVILLE

CHRISTIANSBURG

ROUTE 42

ROUTE 81

ROUTE 460

ROUTE 221

ROUTE 220

ROUTE 460

P A

TR

IO

TS

B

LV

D

PATRIO

TS C

IR

P A T R

IO

T S C

IR

ROANOKE BLVD

G A R

D E N

S Q

ROANOKE B

LVD

BUILDING

CONTRACT OFFICER REPRESENTATIVE DATE

CHIEF OF ENGINEERING DATE

INTERIOR DESIGNER DATE

DEPARTMENT HEAD DATE

CONTRACTING OFFICER DATE LEAD USER SIGNATURE DATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:4

P

M

GI000

COVER SHEET

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

658-24-102

REPLACE BUILDING 2 AIR HANDLERS

SALEM VA MEDICAL CENTER

1970 ROANOKE BLVD, SALEM VA 24153

BID DOCUMENTS

BID DOCUMENTS

FULLY SPRINKLERED

SHEET INDEX

SHEET NUMBER SHEET NAME

GI000 COVER SHEET

GC101 BASEMENT FLOOR PHASING PLAN

GC102 FIRST FLOOR PHASING PLAN

GI101 BASEMENT FLOOR LIFE SAFETY

GI102 FIRST FLOOR LIFE SAFETY

AD111 BASEMENT REFLECTED CEILING DEMOLITION PLAN

AD112 BASEMENT REFLECTED CEILING DEMOLITION PLAN

AD113 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE111 BASEMENT FLOOR REFLECTED CEILING PLAN

AE112 BASEMENT FLOOR REFLECTED CEILING PLAN

AE113 FIRST FLOOR REFLECTED CEILING PLAN

FA001 FIRE ALARM - SYMBOLS, NOTES, AND DRAWING INDEX

FA002 FIRE ALARM - INPUT/OUTPUT MATRIX & MISCEL. REQUMTS

FA003 FIRE ALARM - DETAILS

FA100 FIRE ALARM - NEW WORK - BASEMENT - AREA A

FA101 FIRE ALARM - NEW WORK - BASEMENT - AREA B

FA200 FIRE ALARM - NEW WORK - FIRST FLOOR

FX001 FIRE SUPPRESSION - SYMBOLS, NOTES, AND DRAWING INDEX

FX002 FIRE SUPPRESSION - IMPAIR., REQMTS, & FLOW TEST

FX003 FIRE SUPPRESSION - DETAILS

FX100 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA A

FX101 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA B

FX102 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA A

FX103 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA B

FX104 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA A

FX105 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA B

FX200 FIRE SUPPRESSION - DEMOLITION - FIRST FLOOR

FX201 FIRE SUPPRESSION - NEW WORK - FIRST FLOOR

FX202 FIRE SUPPRESSION - DESIGN CRITERIA - FIRST FLOOR

PP100 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA A

PP101 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA B

PP102 PLUMBING - DEMOLITION AND NEW WORK - FIRST FLOOR

M001 MECHANICAL - SYMBOLS, NOTES, AND DRAWING INDEX

M002 MECHANICAL - DETAILS

M003 MECHANICAL - SCHEDULES

M004 MECHANICAL - AHU SCHEDULES

M005 MECHANICAL - 2-AHU-9 SEQUENCE OF OPERATIONS

M006 MECHANICAL - 2-AHU-10 SEQUENCE OF OPERATIONS

M007 MECHANICAL - TERMINAL UNIT & EXHAUST FAN SEQUENCE OF

OPERATIONS

MH101A MECHANICAL - PHASE 1A - BASEMENT - AREA A

MD101B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - DUCTWORK - AREA A

MD102B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - PIPING - AREA A

MH101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - DUCTWORK - AREA A

MP101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - PIPING - AREA A

MH201A MECHANICAL - PHASE 2A - AREA B

MD201B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - DUCTWORK - AREA B

MD202B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - PIPING - AREA B

MD211B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - DUCTWORK

MD212B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - PIPING

MH201C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - DUCTWORK - AREA B

MH211C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - DUCTWORK

MP202C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - PIPING - AREA B

MP212C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - PIPING

MD201D MECHANICAL - PHASE 2D DEMOLITION - AREA B

E001 ELECTRICAL - SYMBOLS, NOTES, AND DRAWING INDEX

E002 ELECTRICAL - DETAILS

E003 ELECTRICAL - POWER RISER DIAGRAM AND SCHEDULES

E004 ELECTRICAL - BASEMENT - PHASING PLAN

E005 ELECTRICAL - FIRST FLOOR - PHASING PLAN

ED100A ELECTRICAL - DEMOLITION - BASEMENT - AREA A

ED100B ELECTRICAL - DEMOLITION - BASEMENT - AREA B

ED200 ELECTRICAL - DEMOLITION - FIRST FLOOR

EL100A ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA A

EL100B ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA B

EL200 ELECTRICAL - NEW WORK - FIRST FLOOR - LIGHTING

EP100A ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA A

EP100B ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA B

EP100C ELECTRICAL - NEW WORK - BASEMENT - POWER - ENLARGED VIEWS

EP200 ELECTRICAL - NEW WORK - FIRST FLOOR - POWER

Contact:Contact: Contact:

CHARLOTTE ENGINEERS

Name: AVERY STANLEY

MECHANICAL ENGINEER

MECHANICAL,

ELECTRICAL &

PLUMBING

SALEM VA MEDICAL CENTER

TODD CARROLL

HEALTHCARE ENGINEER

1970 Roanoke Blvd. , Salem, VA 24153 p: 540. 982. 2463 X 2546 e: todd.carroll2@va.gov

OWNER

GUIDON DESIGN INC.

Name: ADAM ORGZEWALLA

PROJECT ARCHITECT

1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidon.com

ARCHITECT

Contact:

CHARLOTTE ENGINEERS

Name: AVERY STANLEY

PROJECT MANAGER

5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com

PROJECT MANAGER

AREA MAP

CAMPUS MAP

N

N

5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com

Revisions: Date:

CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: IV

1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC101.

2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 4/GC101.

3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 3/GC101.

4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN 2 PHASES.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL PLAN NOTES

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

REC THERAPY

OFFICE

OFFICE

MUSIC THERAPY RM

OFFICE

Room

STORAGE

L8

DIALYSIS STORAGE

LINEN

LOCKERS

9B

STAFF LOUNGE

9A

RESTROOM

8B

RESTROOM

8A

WAITING ROOM

B-B5

CUBICALS

PASSAGE

B-B7

SVC. BAY

OFFICE

SUPV. ADMISS

OFFICE

OFFICE

20A

STORAGE ARCHIVE

FIRE RISER ROOM

21A

UTILITY

SVC. BAY

LCSW OFFICE

CALL CENTER RM

OFFICE

23A

ELECTRICAL

MUSIC THERAPY

31A

STORAGE

TOILET

CORRIDOR

CB-6

MRI WAITING

Room

PHASE 1 PHASE 2

UTS VNML ODCB E RQPG H K

W XA I J

F

LOCKER

28B

CORRIDOR

CB-3

CORRIDOR

CB-6

PROVIDE

CONSTRUCTION

FENCING TO SECURE

AIR HANDLER

PROPOSED LOCATION

OF TEMPORARY AIR

HANDLER.

PROVIDE

CONSTRUCTION

FENCING TO SECURE

AIR HANDLER

PROPOSED LOCATION

OF TEMPORARY AIR

HANDLER.

Room

1-188

Room

1-189

Room

1-190

Room

1-191 Room

1-192

Room

1-194

Room

1-196

STAIR 3

31B

STORAGE

8A

TELECOM

ELECTRICAL

2B

STAIR 2

2A

ELEVATOR

STAIR 1

1A

TRASH RM

MAIN TEL. COM

MAIN EL RM

ELECTRICAL

ELEVATOR MACHINE

ROOM

EMERG. GEN

37A

CORRIDOR

CB-3

Room

1-141

Room

1-149

Room

1-150

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16" O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDANT POLY INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDANT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER OR

CONTRACTOR CORE PER OWNER'S

PREFERENCE, HARDWARE AND CLOSER

AIR PRESSURE MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

GC101

BASEMENT FLOOR PHASING PLAN

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GC101

1 BASEMENT FLOOR - PHASING PLAN

SCALE: 1 1/2" = 1'-0"GC101

TEMPORARY 1 HR FIRE RATED SMOKE BARRIER

WALL CONSTRUCTION NFPA 241

SCALE: 1 1/2" = 1'-0"GC101

3 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION

SCALE: 1/4" = 1'-0"GC101

4 TEMPORARY WALL CONSTRUCTION ELEVATION

Revisions: Date:

CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C

PATIENT RISK GROUP: HIGH

CLASS OF PRECAUTION MATRIX: IV

1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC101.

2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 4/GC101.

3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 3/GC101.

4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN 2 PHASES.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL PLAN NOTES

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

PRINTING

102A

ELECTRICAL

104A

STORAGE

CODING/DATA

OFFICE

EQUIP ROOM

OFFICE

TELECOMMUNICATION

125A

RELEASE OF INFOR.

OFFICE

ASST CHIEF

124A

CHIEF

124B

CORRIDOR

C1-9

LOBBY

C1-20

PHASE 2

UTS VNML O RQPK

W XI J

OFFICE

124C

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

FIRST FLOOR

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

GC102

FIRST FLOOR PHASING PLAN

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GC102

1 FIRST FLOOR - PHASING PLAN

Revisions: Date:

2 2

UTS VNML ODCB E RQPG H K

W XA I J

F

REC THERAPY

OFFICE

OFFICE

MUSIC THERAPY RM

CORRIDOR

CB-3

OFFICE

Room

STORAGE

L8

DIALYSIS STORAGE

LINEN

LOCKERS

9B

STAFF LOUNGE

9A

RESTROOM

8B

RESTROOM

8A

WAITING ROOM

B-B5

CUBICALS

PASSAGE

B-B7

SVC. BAY

OFFICE

SUPV. ADMISS

OFFICE

OFFICE

20A

STORAGE ARCHIVE

21 FIRE RISER ROOM

21A

UTILITY

SVC. BAY

LCSW OFFICE

CALL CENTER RM

OFFICE

23A

ELECTRICAL

MUSIC THERAPY

31A

STORAGE

TOILET

CORRIDOR

CB-6

MRI WAITING

Room

28 LOCKER

28B

Room

1-188

Room

1-189

Room

1-190

Room

1-191 Room

1-192

Room

1-194

Room

1-196

STAIR 3

31B

STORAGE

8A

ELEVATOR

ELECTRICAL

ELEVATOR MACHINE

ROOM

STAIR 1

1A

TRASH RM

MAIN TEL. COM

MAIN EL RM

EMERG. GEN

37A

STAIR 2

2A2B

ELECTRICAL

TELECOM

Room

1-150

Room

1-149

Room

1-141

Room

1-139

Room

1-140

Room

1-138

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

GI101

BASEMENT FLOOR LIFE SAFETY

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI101

1 BASEMENT FLOOR - LIFE SAFETY

UTS VNML O RQPG H K

WI J

F

PRINTING

102A

ELECTRICAL

104A

STORAGE

CODING/DATA

OFFICE

EQUIP ROOM

OFFICE

TELECOMMUNICATION

125A

RELEASE OF INFOR.

OFFICE

ASST CHIEF

124A

CHIEF

124B

CORRIDOR

C1-9

LOBBY

C1-20

OFFICE

124C

CORRIDOR

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

FIRST FLOOR

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

GI102

FIRST FLOOR LIFE SAFETY

CHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/32" = 1'-0"GI102

1 FIRST FLOOR - LIFE SAFETY PLAN

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED

CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL

INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN

THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND

TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.

DEMOLITION GENERAL NOTES

REC THERAPY

OFFICE

OFFICE

MUSIC THERAPY RM

CORRIDOR

CB-3

OFFICE

Room

STORAGE

L8

DIALYSIS STORAGE

LOCKERS

9B

STAFF LOUNGE

9A

RESTROOM

8B

RESTROOM

8A

WAITING ROOM

B-B5

PASSAGE

B-B7

SVC. BAY

OFFICE

SUPV. ADMISS

OFFICE

20 OFFICE

20A

STORAGE ARCHIVE

/1 AD112

B 8' - 0" B 7' - 10"

B 7' - 9"

B 7' - 9" B 7' - 8"

B 7' - 7"

B 7' - 10"

B 7' - 10"

B 7' - 10"

C 7' - 6"

B 7' - 10"

A 7' - 10"

A 7' - 10"

A 7' - 11"

A 7' - 11"

C 9' - 0"

A 7' - 11"

A 7' - 11"

A 7' - 10"

A 8' - 0" A 8' - 0" A 8' - 0"

B 8' - 0"

A 8' - 0"

C 9' - 0"

A 8' - 0"

CORRIDOR

CB-3

PASSAGE

B-B7

CUBICALS

C 9' - 0"

C 7' - 6"

C 7' - 10"

MLDCB E G H K

A I J

F

A 7' - 3"

C 7' - 10"

C 7' - 10"

C 7' - 6"

C 9' - 1"

C 9' - 1"

C 9' - 1"

C 9' - 3" C 9' - 1"

C 7' - 2"

A 7' - 3"

C 7' - 2"

C 7' - 2"

A 7' - 4"

C 9' - 0"

B 7' - 2"

LINEN

REC THERAPY

REC THERAPY

Room

1-138

Room

1-140

Room

1-139

Room

1-141

Room

1-149

Room

1-150

STAIR 2

2A

2B

TELECOM

ELECTRICAL

STAIR 1

1A

TRASH RM

MAIN TEL. COM

MAIN EL RM

1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING

DEMOLITION.

3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.

WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.

DEMOLITION PLAN NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILING

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

AD111

BASEMENT REFLECTED CEILING

DEMOLITION PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD111

1 BASEMENT FLOOR CEILING DEMOLITION PLAN - AREA A

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED

CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL

INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN

THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND

TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.

DEMOLITION GENERAL NOTES

STORAGE ARCHIVE

UTILITY

SVC. BAY

LCSW OFFICE

CALL CENTER RM

OFFICE

23A

ELECTRICAL

MUSIC THERAPY

31A

STORAGE

TOILET

CORRIDOR

CB-6

MRI WAITING

Room

/1 AD111

A 8' - 0"

A 8' - 0"

A 7' - 10"

A 8' - 1"

A 8' - 0"

A 8' - 0"

B 7' - 5"

B 8' - 0"

B 8' - 0"

B 7' - 10" B 8' - 0" B 8' - 0"

LOCKER

28B

B 7' - 6"

UTS VN O RQP

W X

B 7' - 4"

Room

B 8' - 0"

Room

1-188

Room

1-189 Room

1-190

Room

1-191

Room

1-192

Room

1-196

Room

1-194

ELEVATOR

ELECTRICAL

ELEVATOR MACHINE

ROOM

EMERG. GEN

37A

STAIR 3

31B

1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING

DEMOLITION.

3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.

WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.

DEMOLITION PLAN NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILING

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

AD112

BASEMENT REFLECTED CEILING

DEMOLITION PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD112

1 BASEMENT FLOOR CEILING DEMOLITION PLAN - AREA B

PRINTING

102A

ELECTRICAL

104A

STORAGE

CODING/DATA

OFFICE

EQUIP ROOM

OFFICE

ASST CHIEF

124ACHIEF

124B

CORRIDOR

C1-9

A 8' - 11"

A 8' - 11"

C 9' - 9"C 9' - 9"

A 9' - 9"

A 8' - 11"

A 9' - 9"

A 8' - 11"

A 9' - 0"

A 9' - 0" A 9' - 0"

A 8' - 11"

A 8' - 0"

A 10' - 0"

RELEASE OF INFOR.

OFFICE

A 8' - 11"

A 9' - 0"

UTS VNML O RQPK

W XI J

LOBBY

C1-20

OFFICE

124C

A 9' - 0"

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED

CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL

INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN

THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND

TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.

DEMOLITION GENERAL NOTES

1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING

DEMOLITION.

3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.

WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.

DEMOLITION PLAN NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILING

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

FIRST FLOOR

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

AD113

FIRST FLOOR REFLECTED

CEILING DEMOLITION PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD113

1 FIRST FLOOR CEILING DEMOLITION PLAN

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

1 VIEW NAME

SCALE: 1/8" = 1'-0"A101

VIEW TITLE

N

NORTH ARROW

EXTENT OF REVISION

REVISION SET

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

X

X

XXXX

SHEET LOCATION

VIEW NUMBER

X X

X

SHEET LOCATION

VIEW NUMBER

XXXX

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ELEVATION REFERENCES

NEW WALL

WALL TO BE

REMOVED

S3A.G

INDICATES STRUCTURAL MATERIAL

INDICATES NOMINAL SIZE

INDICATES STRUCTURE AND FINISH HEIGHTS

INDICATES QUALIFER

EXISTING WALL TO

REMAIN

ROOM

ROOM TAG

NEW DOOR

EXISTING DOOR

DEMOLISHED DOOR

REVISION TO PLAN CALLOUT

WALLS

DOOR TAG

KEY NOTE TAGS

WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION

DOORS

PT-1

A

T

FINISH INDICATION

FRAME / WINDOW

GLAZING1

1 PLAN NOTE

1 DEMOLITION NOTE

ALTERNATE/BID DEDUCT ITEM

KEY NOTE SYMBOLS

ARCHITECTURAL SYMBOLS

ICRA WALL ICRA DOOR

1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®

SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION

MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL

DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,

SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES

MANAGEMENT.

2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE

CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE

NATIONAL CAD STANDARD AS GUIDES.

3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT

TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.

CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER

QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY

THE BID DUE DATE.

4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH

OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED

WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,

ACCESS CONTROL, ETC.

5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING

BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC

MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR

VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH

THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS

AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,

ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION

REQUIREMENTS.

7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF

WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE

FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK

THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF

WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY

CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.

8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR

UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,

GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.

9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING

AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING

CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING

PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED

METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.

10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW

INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL

CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING

AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND

STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.

11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT

IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW

CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION

BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED

CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY

ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR

MISSING DIMENSIONS.

12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF

CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.

14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW

STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN

GRID LINES UNLESS NOTED OTHERWISE.

15. FLOOR ELEVATION // 100’-0”// IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING

SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.

16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.

17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND

EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF

DELIVERY AND ROUGH-IN.

21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY

CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE

FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND

HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.

23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL

UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO

UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE

OWNER.

24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING

REQUIRED DURING CONSTRUCTION.

25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT

CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE

CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE

CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO

COST TO THE OWNER.

26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.

27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,

ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE

AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR

HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR

SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.

CONSTRUCTION GENERAL NOTES

AFF ABOVE FINISHED FLOOR

CL CENTER LINE

CMU CONCRETE MASONRY UNIT

DN DOWN

FE FIRE EXTINGUISHER

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

N NORTH

NA NOT APPLICABLE

OPP OPPOSITE

STC SOUND TRANSMISSION CLASS

STOR STORAGE

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOS TOP OF STEEL

ARCHITECTURAL ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:5

P

M

AE001

ARCHITECTURAL SYMBOLS AND

ABBREVIATIONSCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

A. THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN THE

LAYOUT OF ALL CEILING ELEMENTS, HEIGHTS AND/OR PENETRATIONS.

COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE

THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO

VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO

ARCHITECT AND COR.

B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT

ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR

ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH

ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.

C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND

INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE

EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.

COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE

CENTERED IN ROOMS.

D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)

SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.

E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL

BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.

F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK

SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN

CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE

PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.

G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON

GYPSUM BOARD PAINT FINISH.

H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO

REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,

WHEN APPLICABLE.

REFLECTED CLNG. GENERAL NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILING

/1 AE112

B 8' - 0" B 7' - 10"

B 7' - 9"

B 7' - 9"

B 7' - 8"

B 7' - 7"

B 7' - 10"

B 7' - 10"

B 7' - 10"

C 7' - 6"

B 7' - 10"

A 7' - 10"

A 7' - 10"

A 7' - 11"

A 7' - 11"

C 9' - 0"

A 7' - 11"

A 7' - 11"

A 7' - 10"

A 8' - 0"

A 8' - 0" A 8' - 0" B 8' - 0"

A 8' - 0"

C 9' - 0"

A 8' - 0"

C 9' - 0"

C 9' - 0"

B 7' - 2"

MLDCB E G H K

A I J

F

C 7' - 10"

C 7' - 10"

MUSIC THERAPY RM

OFFICE

OFFICE

OFFICE

REC THERAPY

REC THERAPY

REC THERAPY

OFFICE

OFFICE

SUPV. ADMISS

OFFICE

OFFICE

20A

STORAGE ARCHIVE

SVC. BAY

OFFICE

PASSAGE

B-B7

PASSAGE

B-B7

WAITING ROOM

WAITING ROOM

WAITING ROOM

Room

RESTROOM

8B

STAFF LOUNGE

9A

LOCKERS

9B

STORAGE

L8

DIALYSIS STORAGE

CORRIDOR

Room

LINEN

C 7' - 2"

C 7' - 2"

A 7' - 4"

A 7' - 3"

A 7' - 3"

Room

1-138

Room

1-140

Room

1-139

Room

1-141

Room

1-149

Room

1-150

2B

STAIR 2

2A

TELECOM

ELECTRICAL

STAIR 1

1A

TRASH RM

MAIN TEL. COM

MAIN EL RM

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:0

P

M

AE111

BASEMENT FLOOR REFLECTED

CEILING PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AE111

1 BASEMENT FLOOR - EXISTING CEILING CONDITIONS - AREA A

COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE

THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO

VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO

ARCHITECT AND COR.

B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT

ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR

ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH

ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.

C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND

INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE

EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.

COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE

CENTERED IN ROOMS.

D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)

SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.

E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL

BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.

F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK

SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN

CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE

PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.

G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON

GYPSUM BOARD PAINT FINISH.

H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO

REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,

WHEN APPLICABLE.

REFLECTED CLNG. GENERAL NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILING

/1 AE111

A 8' - 0"

A 8' - 0" A 7' - 10"

A 8' - 1"

A 8' - 0"

A 8' - 0"

B 8' - 0"

B 8' - 0"

UTS VN O RQP

W X

A 8' - 0"

B 7' - 6"

B 8' - 0"

OFFICE

23A

ELECTRICAL

IT

MRI WAITING

LOCKER

28B

Room

CALL CENTER RM

LCSW OFFICE

FIRE RISER ROOM

21A

STORAGE ARCHIVE

CORRIDOR

CB-6

UTILITY

SVC. BAY

Room

Room

Room

MUSIC THERAPY

31A

STORAGE

Room

1-188

Room

1-189 Room

1-190

Room

1-191 Room

1-192

Room

1-194

Room

1-196

STAIR 3

31B

STORAGE

215ELEVATOR

ELECTRICAL

ELEVATOR MACHINE

ROOM

EMERG. GEN

37A

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

BASEMENT

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:0

P

M

AE112

BASEMENT FLOOR REFLECTED

CEILING PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AE112

1 BASEMENT FLOOR - EXISTING CEILING CONDITIONS - AREA B

COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE

THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO

VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO

ARCHITECT AND COR.

B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT

ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR

ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH

ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.

C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND

INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE

EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.

COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE

CENTERED IN ROOMS.

D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)

SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.

E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL

BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.

F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK

SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN

CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE

PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.

G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON

GYPSUM BOARD PAINT FINISH.

H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO

REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,

WHEN APPLICABLE.

REFLECTED CLNG. GENERAL NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A

B

2x4 ACOUSTICAL CEILING TILE (AT-3)

2x2 ACOUSTICAL CEILING TILE c

GYPSUM CEILINGA 8' - 11" A 8' - 11"

C 9' - 9"C 9' - 9"

A 9' - 9"

A 8' - 11"

A 9' - 9"

A 8' - 11"

A 9' - 0"

A 9' - 0" A 9' - 0"

A 8' - 11"

A 8' - 0"

A 10' - 0"

UTS VNML O RQPK

W XI J

A 8' - 11"

A 9' - 0"

A 9' - 0"

A 8' - 0"

CODING/DATA

PRINTING

102A

STORAGE

OFFICE

ELECTRICAL

104A

CORRIDOR

C1-09

CORRIDOR

EQUIP ROOM

OFFICE

RELEASE OF INFOR.

Room

OFFICE

124C

ASST CHIEF

124A

CHIEF

124B

TELECOMMUNICATION

125A

LOBBY

C1-20

3 HR FIRE RATED

2 HR FIRE RATED

1 HR FIRE RATED

1 HR SMOKE BARRIER

SMOKE PARTITION

2 HR SMOKE BARRIER

WALL RATING LEGEND

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

NOT F

OR

CONSTRUCTIO

N

KEY PLAN

BA

FIRST FLOOR

A u to d e s k D o c s

/2

.1

V A

S a le m

A H

U R e p la c e m e n t-

C h a rl o tt e

E n g in e e rs

/2 -0

A v

.r v t

/1 /2

:4

:0

P

M

AE113

FIRST FLOOR REFLECTED

CEILING PLANCHARLOTTE ENGINEERS, LLP

5838 MONROE ROAD

CHARLOTTE, NC 28212

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

REPLACE BUILDING 2 AIR

HANDLERS

1970 ROANOKE BLVD, SALEM VA 24153

658-24-102

12/03/2025 AO LS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AE113

1 FIRST FLOOR - EXISTING CEILING CONDITIONS

C

RI

DESIGN CODES, STANDARDS AND PARTIES OF REFERENCE

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

THE FOLLOWING PUBLICATIONS AND AUTHORITIES HAVING JURISDICTION SHALL BE REFERENCED

FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM ON THIS PROJECT:

ANSI, A117.1 STANDARD, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES. 2017 EDITION

WITH SUPPLEMENT 1 VERSION 2024

NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION

NFPA 70 - NATIONAL ELECTRIC CODE, 2023 EDITION

NFPA 72 - NATIONAL FIRE ALARM & SIGNALING CODE, 2025 EDITION

NFPA 99 - HEALTH CARE FACILITIES CODE, 2024 EDITION

NFPA 101 - LIFE SAFETY CODE. 2024 EDITION

NFPA 170 - LIFE SAFETY CODE, 2024 EDITION

NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERNATION AND DEMOLITION

OPERATIONS, 2022 EDITION

VA FIRE PROTECTION DESIGN MANUAL, NOVEMBER 1, 2023, NINTH EDITION

VA SEISMIC DESIGN REQUIREMENTS, REVISED JULY 1, 2023 EDITION

VA FIRE SAFETY

FIRE ALARM INSPECTION NOTE:

1.

2.

A CONTRACTOR SHALL PROVIDE THE ENGINEER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .