ATTACHMENT A - BASE OFFER PRICE BREAKDOWN FORM.docx
DOCX document 21 KB Posted
- Attached to
- Z2DA--658-24-102 Replace Building 2 AHUs
- Solicitation number
- 36C24626R0072
About this file
This is a Base Offer Price Breakdown Form template for Phase II of a solicitation related to replacing Building 2 Air Handler Units at a Department of Veterans Affairs facility (VISN 6). The form is designed for contractors to submit detailed pricing for the project identified as RFP Number TBD and Project No. 658-24-102.
The pricing template requires offerors to break down costs across 27 construction and building system divisions using the MasterFormat classification system, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. For each division, contractors must provide separate line items for Labor, Material, and Total Cost. The form includes subtotal calculations for all divisions, followed by a section for Overhead/Profit and Insurance Bond percentages, with designated spaces for contractors to enter their overhead percentage, profit percentage, and insurance bond percentage, culminating in a final Total Base Proposal Item Price. This is a blank template and does not contain specific pricing information or response deadlines.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE II - SOLICITATION ATTACHMENT A
BASE PROPOSAL ITEM PRICE BREAKDOWN FORM
RFP NUMBER: TBD
PROJECT NO./TITLE: 658-24-102, Replace Building 2 Air Handler Units
OFFEROR:
| ITEM |
| DESCRIPTION |
| Labor |
| Material |
| Total Cost |
| Division 1 |
| General Requirements |
| Division 2 |
| Existing Conditions |
| Division 3 |
| Concrete |
| Division 4 |
| Masonry |
| Division 5 |
| Metals |
| Division 6 |
| Wood and Plastic |
| Division 7 |
| Thermal & Moisture Protect |
| Division 8 |
| Doors and Windows |
| Division 9 |
| Finishes |
| Division 10 |
| Specialties |
| Division 11 |
| Equipment |
| Division 12 |
| Furnishings |
| Division 13 |
| Special Construction |
| Division 14 |
| Conveying Equipment |
| Division 21 |
| Fire Suppression |
| Division 22 |
| Plumbing |
| Division 23 |
| HVAC |
| Division 25 |
| Integrated Automation |
| Division 26 |
| Electrical |
| Division 27 |
| Communications |
| Division 28 |
| Electronic Safety & Security |
| Division 31 |
| Earthwork |
| Division 32 |
| Exterior Improvements |
| Division 33 |
| Utilities |
| Division 34 |
| Transportation |
| Division 48 |
| Electrical Power Generation |
Divisions Subtotal:
Overhead/Profit and Insurance
Bond (___%)
Overhead (___%)
Profit (___%)
Subtotal:
TOTAL BASE PROPOSAL ITEM PRICE
File details come from the government source that posted it. Updated .