0003 A - 658-24-102 B2 AHUs - New Drawing Addendum 1 - Glycol system.pdf
PDF 781 KB Posted
- Attached to
- Z2DA--658-24-102 Replace Building 2 AHUs
- Solicitation number
- 36C24626R0072
About this file
This is a set of bid documents consisting of architectural and engineering drawings for a construction project at Salem VA Medical Center in Salem, Virginia.
The project involves replacing Building 2 air handlers (Project Number 658-24-102) at 1970 Roanoke Boulevard, Salem, VA 24153. The scope includes replacement of two air handling units (2-AHU-9 and 2-AHU-10) with associated mechanical, electrical, plumbing, fire alarm, and fire suppression work. The work is organized into four phased construction periods: Phase 1A involves temporary air handling unit installation; Phase 1B includes demolition of existing AHU-9 and associated ductwork and piping in the basement floor Area A; Phase 1C covers new AHU-9 installation with new ductwork, piping, and terminal units; Phase 2A involves relocating the temporary unit; Phase 2B includes demolition of AHU-10 and associated systems in basement Area B and first floor; Phase 2C covers new AHU-10 installation; and Phase 2D includes removal of the temporary unit. The documents include detailed mechanical drawings with symbols, notes, schedules, sequence of operations for both AHU units, glycol energy recovery schematic details, and coordination requirements. The facility is fully sprinklered. The project manager is Avery Stanley at Charlotte Engineers, LLP, the project architect is Adam Orgzewalla at Guidon Design Inc., and the healthcare engineer is Todd Carroll at Salem VA Medical Center. Documents were issued December 3, 2025, with Addendum 1 dated August 4, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003 B - Mobilization Area.pdf | ||
| 36C24626R0072 0003.docx | DOCX document | |
| 0003 C - Project 658-24-102 - Asbestos HazMat - June 2025.pdf | ||
| 36C24626R0072 0002.docx | DOCX document | |
| 36C24626R0072 0001.docx | DOCX document | |
| ATTACHMENT F - BUY AMERICAN ACT COMPLIANCE CERTIFICATION.pdf | ||
| ATTACHMENT B - 658-24-102 B2 AHUs - Drawings.pdf | ||
| ATTACHMENT E - Salem VA Medical Center Facility Map.pdf | ||
| 36C24626R0072_1.docx | DOCX document | |
| ATTACHMENT C - 658-24-102 B2 AHUs - Specifications.pdf | ||
| ATTACHMENT D - DBA WD VA20260172 MOD 1 20260518.pdf | ||
| ATTACHMENT A - BASE OFFER PRICE BREAKDOWN FORM.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROANOKE
BOONES MILL
BEDFORD
TROUTVILLE
CHRISTIANSBURG
ROUTE 42
ROUTE 81
ROUTE 460
ROUTE 221
ROUTE 220
ROUTE 460
P A
TR
IO
TS
B
LV
D
PATRIO
TS C
IR
P A T R
IO
T S C
IR
ROANOKE BLVD
G A R
D E N
S Q
ROANOKE B
LVD
BUILDING
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACTING OFFICER DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/5
/2
:0
:2
P M
GI000
COVER SHEET
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
658-24-102
REPLACE BUILDING 2 AIR HANDLERS
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM VA 24153
BID DOCUMENTS
BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET NUMBER SHEET NAME
GI000 COVER SHEET
GC101 BASEMENT FLOOR PHASING PLAN
GC102 FIRST FLOOR PHASING PLAN
GI101 BASEMENT FLOOR LIFE SAFETY
GI102 FIRST FLOOR LIFE SAFETY
AD111 BASEMENT REFLECTED CEILING DEMOLITION PLAN
AD112 BASEMENT REFLECTED CEILING DEMOLITION PLAN
AD113 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE111 BASEMENT FLOOR REFLECTED CEILING PLAN
AE112 BASEMENT FLOOR REFLECTED CEILING PLAN
AE113 FIRST FLOOR REFLECTED CEILING PLAN
FA001 FIRE ALARM - SYMBOLS, NOTES, AND DRAWING INDEX
FA002 FIRE ALARM - INPUT/OUTPUT MATRIX & MISCEL. REQUMTS
FA003 FIRE ALARM - DETAILS
FA100 FIRE ALARM - NEW WORK - BASEMENT - AREA A
FA101 FIRE ALARM - NEW WORK - BASEMENT - AREA B
FA200 FIRE ALARM - NEW WORK - FIRST FLOOR
FX001 FIRE SUPPRESSION - SYMBOLS, NOTES, AND DRAWING INDEX
FX002 FIRE SUPPRESSION - IMPAIR., REQMTS, & FLOW TEST
FX003 FIRE SUPPRESSION - DETAILS
FX100 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA A
FX101 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA B
FX102 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA A
FX103 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA B
FX104 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA A
FX105 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA B
FX200 FIRE SUPPRESSION - DEMOLITION - FIRST FLOOR
FX201 FIRE SUPPRESSION - NEW WORK - FIRST FLOOR
FX202 FIRE SUPPRESSION - DESIGN CRITERIA - FIRST FLOOR
PP100 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA A
PP101 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA B
PP102 PLUMBING - DEMOLITION AND NEW WORK - FIRST FLOOR
M001 MECHANICAL - SYMBOLS, NOTES, AND DRAWING INDEX
M002 MECHANICAL - DETAILS
M003 MECHANICAL - SCHEDULES
M004 MECHANICAL - AHU SCHEDULES
M005 MECHANICAL - 2-AHU-9 SEQUENCE OF OPERATIONS
M006 MECHANICAL - 2-AHU-10 SEQUENCE OF OPERATIONS
M007 MECHANICAL - TERMINAL UNIT & EXHAUST FAN SEQUENCE OF
OPERATIONS
M008 MECHANICAL - GLYCOL ENERGY RECOVERY SCHEMATIC
MH101A MECHANICAL - PHASE 1A - BASEMENT - AREA A
MD101B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - DUCTWORK - AREA A
MD102B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - PIPING - AREA A
MH101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - DUCTWORK - AREA A
MP101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - PIPING - AREA A
MH201A MECHANICAL - PHASE 2A - AREA B
MD201B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - DUCTWORK - AREA B
MD202B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - PIPING - AREA B
MD211B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - DUCTWORK
MD212B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - PIPING
MH201C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - DUCTWORK - AREA B
MH211C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - DUCTWORK
MP202C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - PIPING - AREA B
MP212C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - PIPING
MD201D MECHANICAL - PHASE 2D DEMOLITION - AREA B
E001 ELECTRICAL - SYMBOLS, NOTES, AND DRAWING INDEX
E002 ELECTRICAL - DETAILS
E003 ELECTRICAL - POWER RISER DIAGRAM AND SCHEDULES
E004 ELECTRICAL - BASEMENT - PHASING PLAN
E005 ELECTRICAL - FIRST FLOOR - PHASING PLAN
ED100A ELECTRICAL - DEMOLITION - BASEMENT - AREA A
ED100B ELECTRICAL - DEMOLITION - BASEMENT - AREA B
ED200 ELECTRICAL - DEMOLITION - FIRST FLOOR
EL100A ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA A
EL100B ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA B
EL200 ELECTRICAL - NEW WORK - FIRST FLOOR - LIGHTING
EP100A ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA A
EP100B ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA B
EP100C ELECTRICAL - NEW WORK - BASEMENT - POWER - ENLARGED VIEWS
EP200 ELECTRICAL - NEW WORK - FIRST FLOOR - POWER
Contact:Contact: Contact:
CHARLOTTE ENGINEERS
Name: AVERY STANLEY
MECHANICAL ENGINEER
MECHANICAL,
ELECTRICAL &
PLUMBING
SALEM VA MEDICAL CENTER
TODD CARROLL
HEALTHCARE ENGINEER
1970 Roanoke Blvd. , Salem, VA 24153 p: 540. 982. 2463 X 2546 e: todd.carroll2@va.gov
OWNER
GUIDON DESIGN INC.
Name: ADAM ORGZEWALLA
PROJECT ARCHITECT
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidon.com
ARCHITECT
Contact:
CHARLOTTE ENGINEERS
Name: AVERY STANLEY
PROJECT MANAGER
5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com
PROJECT MANAGER
AREA MAP
CAMPUS MAP
N
N
5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com
Revisions: Date:
ADDENDUM 1 08/04/2026
lbaharozian Image
,8 ,9 ,1 h w r e h e a t
DIRECT EXPANSIONDX
TEMPERATURE SENSOR
UNDERWRITER'S LABORATORIES
UNLESS OTHERWISE NOTED
SYMBOL OR SYMMETRICAL
TEST, ADJUST, BALANCE
TRANSFER DUCT
SUPPLY REGISTER
STANDARD CUBIC FEET PER MINUTE
SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
STATIC PRESSURE
VENT THRU ROOF
VARIABLE SPEED
YARD CLEAN OUT
WEATHER PROOF
VARIABLE FREQUENCY DRIVE
VARIABLE VOLUME
WET BULB TEMPERATUREWb
GP
INSUL
INV
LAT
LB/HR
KW
HTG
HVAC
HOA
HORZ
H'STAT
HR
HP
HD
GPH
GPM
HC
IB
IN
ID
HEATING, VENTILATING, AND AIR CONDITIONING
INVERTED BUCKET
INSIDE DIAMETER
LEAVING AIR TEMPERATURE
POUNDS PER HOUR
INSULATED
INVERT
KILOWATT
HEATING
INCH
HEAT DETECTOR
HAND-OFF-AUTOMATIC
HORSEPOWER
GALLONS PER HOUR
GALLONS PER MINUTE
HUMIDITY CONTROLLER
HORIZONTAL
HUMIDISTAT
HOUR
GUIDE POINT
YCO
WP
WG WATER GAGE
FCV
GALV
GC
GAL
FSD
FT
FV
FS
FPC
FPM
FPS
FOB
FP
FO
FLEX
FLG
FLR-FLR
FD
FACP
F&T
F.D.
FC
EQUIP
ESP
EWT
EXH
ER
EC
EFF
ELEC
EL
EQ
EAT
EA
F
EJ
FIRE PROTECTION CONTRACTOR
FEET PER SECOND
FLOW SWITCH/SENSOR
GENERAL CONTRACTOR
COMBINATION FIRE/SMOKE DAMPER
FEET PER MINUTE
FEET
GALVANIZED
GALLON(S)
FLOW VALVE
FLOW CONTROL VALVE
FLOOR TO FLOOR HEIGHT
FIRE PROTECTI0N
FLAT ON BOTTOM
FLANGE
FLAT OVAL
FIRE DAMPER
FLEX
VERT
W/
W/O
VFD
VTR
VOL
VS
VP
VLV
WITHOUT
WITH
VERTICAL
VOLUME
VENT POINT
VALVE
THRU
T'STAT
UL
V
UON
TYP
TOP
TS
TOS
TOD
THERMOSTAT
TYPICAL
THROUGH
TOP OF DUCT
TOP OF STEEL
TOP OF PIPE
EXHAUST REGISTER
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FIRE ALARM CONTROL PANEL
FLOAT AND THERMOSTATIC
FLOW CONTROLLER
FAHRENHEIT
FLOOR DRAIN
EXHAUST
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
EXPANSION JOINT
ELEVATION
ELECTRICAL
EQUAL
EQUIPMENT
EXHAUST AIR
EFFICIENCY
SPRINKLERSPR
STRUCT
TAB
T/D
SYM
SYS
STL
STM
SR
SQ
STRUCTURAL
SYSTEM
STEEL
STEAM
SQUARE
SMACNA
SPEC
SECT
SCFM
SP
SCH
SD
SA
SECTION
SPECIFICATION
SMOKE DAMPER
SCHEDULE
SUPPLY AIR
LOW SIDE WALL EXHAUST REGISTER
LEAVING WATER TEMPERATURE
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAGE
REFLECTED CEILING PLAN
POLYVINYL CHLORIDE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
PRESSURE REDUCING STATION
PLUMBING CONTRACTOR
OUTSIDE DIAMETER
MOTOR OPERATED DAMPER
NATIONAL ELECTRIC CODE
NATIONAL ELECTRICAL MANUFACTURER'S
NATIONAL FIRE PROTECTION ASSOCIATION
NET POSITIVE SUCTION HEAD
NOT IN CONTRACT
NORMALLY OPEN
NORMALLY CLOSED
MECHANICAL CONTRACTOR
MANUAL AIR VENT
MANUAL DAMPER
MANUFACTURERMFR
ARCH ARCHITECTURAL
DWG
DWV
Db
DEG(°)
DPR
DTF
DP
DN
CU.FT.
CTR
CU.YD.
DD
CU
CONN
CONT
CONTR
COP
CONST
COORD
CFH
CFM
CLG
CONC
CO
ASHRAE
BFP
BDD
ASME
BHP
AUTO
BOP
BOD
BTUH
BTU
BOS
BV
C
CUBIC YARD
DRAIN, WASTE, AND VENT
DOWN THRU FLOOR
DUCT MOUNTED SMOKE DETECTOR
DRAIN POINT
DRAWING
DAMPER
DRY BULB TEMPERATURE
DEGREE(S)
DOWN
COEFFICIENT OF PERFORMANCE
CONSTRUCTION
COPPER
CUBIC FEET
CENTER
CONNECTION
CONTINUATION
CONTRACTOR
COORDINATE
RECIRC
REINF
REQD
RH
RPM
RM
REV
RD
RA
RCP
REQUIRED
ROOM
REVISION
RETURN AIR
RECIRCULATING
REINFORCING
ROUND
PLBG
PSIG
QTY
PVC
PSI
PSIA
PRV
PRS
PL
QUANTITY
PILOT LIGHT
PLUMBING
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
CONSTANT VOLUME
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF STEEL
BUTTERFLY VALVE
CEILING
CLEAN OUT
CONCRETE
BACKFLOW PREVENTER
BOTTOM OF PIPE
BOTTOM OF DUCT
BACKDRAFT DAMPER
AND AIR CONDITIONING ENGINEERS
BOILER HORSEPOWER OR BRAKE HORSEPOWER
AUTOMATIC
NIC
OPNG
NPSH
OA
P.C.
OD
OC
NTS
NO.
NO
OUTSIDE AIR
ON CENTER
OPENING
NOT TO SCALE
NUMBER
NFPA
NEMA
NC
NEC
MOD
MTD
MIN
MH
ASSOCIATION
MOUNTED
MINIMUM
MANHOLE
AD
AFMS
ALUM
AFF
AC/HR
AP
ANSI
APPROX
AMCA
ABV.CLG.
AIR MOVEMENT AND CONTROL ASSOCIATION
AMERICAN NATIONAL STANTDARDS INSTITUTE
ANCHOR POINT
AIR FLOW MONITORING STATION
ACCESS DOOR
ABOVE FINISHED FLOOR
AIR CHANGES PER HOUR
ALUMINUM
APPROXIMATE
ABOVE CEILING
POUNDS OR NUMBER
ROUND, DIAMETER OR PHASE
LSWER
MEZZ
MECH
MFG
MD
MAX
MC
MBH
MAV
MEZZANINE
MANUFACTURING
MECHANICAL
MAXIMUM
BTUH x 1000
LF
LP
LWT
LINEAR FEET
LOW PRESSURE
FSS FUSED SAFETY SWITCH
S/S STAINLESS STEEL
RVNR REDUCED VOLTAGE, NON-REVERSING, MAGNETIC
FVNR FULL VOLTAGE, NON-REVERSING, MAGNETIC
MRS MOTOR RATED SWITCH
W WATTS
ACU-1 AIR CONDITIONING UNIT & TAG
AHU-1 AIR HANDLING UNIT & TAG
CC COOLING COIL
CP-1 CONDENSATE PUMP & TAG
DB DECIBELS
Dp DEWPOINT TEMPERATURE
EDH ELECTRIC COIL DUCT HEATER
CUH-1 CABINET UNIT HEATER & TAG
CU-1 CONDENSING UNIT & TAG
CW COLD WATER (DOMESTIC)
EER ENERGY EFFICIENCY RATIO
EF-1 EXHAUST FAN & TAG
E or EX. EXISTING
FCU-1 FAN COIL UNIT & TAG
H&V-1 HEATING AND VENTILATING UNIT & TAG
NOT ALL ABBREVIATIONS
SHOWN IN THIS LIST WERE
UTILIZED FOR THIS PROJECT.
AMERICAN SOCIETY OF HEATING, REFRIGERATING,
AFLD AUTOMATIC FLOW LIMITING DEVICE
NOT APPLICABLEN/A
GENERAL PROJECT NOTESMECHANICAL ABBREVIATIONS( NOTE: SYMBOLS WITHIN THIS SCHEDULE ARE REPRESENTATIVE OF THOSE TYPICALLY FOUND ON THE DRAWINGS. ALL SYMBOLS MAY NOT APPEAR ON THIS SET OF DRAWINGS. )MECHANICAL SYMBOLS
DUCTWORKVALVES
GAUGE CONNECTION ONLY
PLUG VALVE WITH PRESSURE
GLOBE VALVE
THREE WAY VALVE
AUTOMATIC CONTROL VALVE
ANGLE VALVE
BALL VALVE
ISOLATION VALVE
CHECK VALVE
BUTTERFLY VALVE
CONTROL VALVE
PRESSURE INDEPENDANT
ACCESSORIES
PIPE UP
MISCELLANEOUS
DRAWING NUMBER WHERE SECTION
EMERGENCY STOP SWITCH
DIRECTION OF AIR FLOW
CONNECT TO EXISTING SYMBOL
12x10 DUCT SYMBOL: RECTANGULAR
THERMOSTAT
IS LOCATED
T
FLOOR DRAIN
SECTION NUMBER
ESS
CFM
ARROW AND CFM
DUCT SYMBOL: ROUND12∅
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
M4.1
M4
SIDEWALL RETURN REGISTER
CEILING RETURN GRILLE/
SIDEWALL EXHAUST REGISTER
CEILING EXHAUST GRILLE/
EXHAUST DUCTWORK W/O
DUCTLINER
SIDEWALL SUPPLY REGISTER
CEILING SUPPLY DIFFUSER/
TRANSITION
OVAL TRANSITION
SQUARE TO ROUND/
CONICAL TAKEOFF
RECTANGULAR DUCT
MITERED TAKEOFF
(SEE SCH)
(SEE SCH)
REGISTER (SEE SCH)
(SEE SCH)
REGISTER (SEE SCH)
REGISTER (SEE SCH)
EXHAUST DUCT UP
SUPPLY AND RETURN SIMILAR
RETURN DUCT DOWN
SUPPLY AND EXHAUST SIMILAR
SUPPLY DUCT, UP THROUGH ROOF
RETURN AND EXHAUST SIMILAR
EQUIPMENT
MOTOR OPERATED DAMPER
ACCESS DOOR
FIRE DAMPER WITH
DOOR
DETECTOR WITH ACCESS
DUCT MOUNTED SMOKE
WITH ACCESS DOOR
BALANCING DAMPER
ACCESS DOOR
SMOKE DAMPER WITH
FD
M
SD
DD
PIPING
LOW PRESSURE STEAM SUPPLY (15 PSI)
LOW PRESSURE STEAM CONDENSATE (15 PSI)
PC
LPS
LPC
HWR
HWS
PUMPED CONDENSATE
HOT WATER SUPPLY
HOT WATER RETURN
D
CHWS
CHWR
CONDENSATE DRAIN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
TO REMAIN
TO BE REMOVED
EXISTING DUCT
EXISTING EQUIPMENT
TO REMAIN
TO BE REMOVED
EXISTING PIPING
EXISTING PIPING
TO REMAIN
EXISTING CONDENSATE DRAIN
TO BE REMOVED
EXISTING EQUIPMENT
TO REMAIN
EXISTING DUCT
NEW EQUIPMENT
NEW PIPING
NEW
DUCTWORK
D
A. ALL DUCT, PIPE, AND EQUIPMENT SHALL BE LATERALLY RESTRAINED TO
COMPLY WITH ASCE 7.
B. BEFORE FABRICATING ANY SHEET METAL DUCTWORK, COORDINATE LOCATION
AND SIZE WITH SPRINKLER & PLUMBING PIPING, CONDUITS, LIGHT FIXTURES,
STRUCTURAL, ETC. PLANS ARE SCHEMATIC AND ARE NOT SHOP DRAWINGS.
SUBMIT DUCTWORK COORDINATION DRAWINGS, AS SPECIFIED.
C. BEFORE SUBMITTING SHOP DRAWINGS, COORDINATE VOLTAGES AVAILABLE FOR
MECHANICAL EQUIPMENT AND PROVISION ALL STARTERS AND DISCONNECT
SWITCHES WITH ELECTRICAL CONTRACTOR.
D. MECHANICAL CONTRACTOR SHALL MAKE PROVISIONS FOR PROVIDING A
CONDENSATE DRAIN TRAP A MINIMUM OF 4" DEEP OR 1/2" PLUS THE STATIC
PRESSURE OF THE UNIT SUPPLY FAN.
E. ALL EQUIPMENT SHALL BE U.L. LISTED.
F. THE ELECTRICAL CONTRACTOR SHALL CONNECT ALL MECHANICAL EQUIPMENT;
PROVIDE DISCONNECTS, WIRING AND CONDUIT, INSTALL STARTERS, AND MOUNT
AND WIRE VFD, UNLESS OTHERWISE NOTED.
G. FIRE AND SMOKE DAMPERS SHALL BE INSTALLED IN COMPLETE ACCORDANCE
WITH THE MFR'S. U.L. LISTING AND INSTALLATION INSTRUCTIONS. FIRE AND
SMOKE DAMPERS SHALL HAVE SPECIFIC U.L. LISTING FOR THE CONSTRUCTION
IN WHICH THEY ARE INSTALLED.
H. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH
OTHER TRADES TO ELIMINATE CONFLICT WITH OTHER TRADES. ANY WORK
INSTALLED BY THIS CONTRACTOR THAT RESULTS IN CONFLICT, DUE TO LACK
OF COORDINATION BETWEEN TRADES, SHALL BE CHANGED AS DIRECTED BY
THE ARCHITECT/ENGINEER WITHOUT ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
I. SMOKE DETECTORS SHALL BE FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY THE MECHANICAL CONTRACTOR. PROVIDE DUCT ACCESS DOOR
AT EACH DETECTOR. INSTALL DETECTORS IN COMPLETE ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS.
J. MECHANICAL CONTRACTOR SHALL COORDINATE ROUTING OF DUCTWORK TO
ENSURE DUCTWORK DOES NOT PASS OVER ELECTRICAL PANELS.
K. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. THE
SCALE, WHEN INDICATED IS INTENDED FOR GENERAL REFERENCE ONLY.
L. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH THE
CONTRACTOR OFFICER'S REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE
OF TWO WEEKS.THIS TIME LENGTH MAY BE LONGER OR SHORTER FOR SOME
SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
M. PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS OR WALLS
IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS SHALL BE
CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE ESCUTCHEONS SHALL BE
CHROME-PLATED BRASS.
N. PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED DAMPERS,
FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE DETECTORS, AND
SIMILAR ITEMS REQUIRING MAINTENANCE OR ADJUSTMENT.
O. PROVIDE FIRE CAULKING OR OTHER APPROVED FIRESTOP SYSTEM AT ALL
MECHANICAL PIPING PENETRATIONS OF RATED ASSEMBLY WITHIN THE LIMITS OF
CONSTRUCTION (NEW AND EXISTING).
NO SCALE
500 CFM
X - X - XC
VARIABLE OR CONSTANT VOLUME BOX WITH REHEAT
1 GPM
BOX NUMBER (C OR V INDICATES
HOT WATER GPM
CONSTANT OR VARIABLE FLOW)
ROUND HARD DUCTWORK
VARIABLE OR CONSTANT REGULATOR
ACCESS DOOR
SUPPLY CFM
REHEAT COIL
AIR HANDLING UNIT NUMBER
FLOOR
PIPE DOWN
DEMOLISH TO EXISTING SYMBOL
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GWR GLYCOL WATER RETURN
GHS GLYCOL WATER SUPPLY
HPS HIGH PRESSURE STEAM SUPPLY
HPR HIGH PRESSURE STEAM RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
MPR MEDIUM PRESSURE STEAM RETURN
FLEXIBLE DUCTWORK WITH
INSULATION
LINEAR SLOT DIFFUSER/REGISTER
(SEE SCH)
MECHANICAL PHASING NOTES
PHASE 1A NEW WORK
• INSTALL TEMPORARY AIR HANDLING UNIT ON A TRAILER AT THE EXTERIOR OF THE
BASEMENT FLOOR PHYSICAL THERAPY ROOM. PROVIDE TEMPORARY SUPPLY AND
RETURN DUCTWORK THROUGH EXISTING WINDOWS AND CONNECT TO EXISTING
SUPPLY AND RETURN DUCTWORK.
PHASE 1B DEMOLITION
• DEMOLISH EXISTING AIR HANDLING UNIT 2-AHU-9, INCLUDING CONTROLS AND
EXTERNAL COMPONENTS SUCH AS HUMIDIFIERS, FINAL FILTERS, ETC. DEMOLISH
ASSOCIATED DUCTWORK AND PIPING WITHIN SERVICE BAY 2.
• DEMOLISH EXISTING EXHAUST AIR AND RELIEF AIR FANS WITHIN SERVICE BAY 2.
• DEMOLISH EXISTING TERMINAL UNITS AND NECESSARY BRANCH DUCTWORK,
PIPING, CONTROLS, THERMOSTATS, ACCESSORIES, ETC. ON THE BASEMENT
FLOOR IN AREA A.
PHASE 1C NEW WORK
• INSTALL NEW AIR HANDLING UNIT 2-AHU-9 IN SERVICE BAY 2. INSTALL NEW
EXTERNAL AIR HANDLING UNIT COMPONENTS INCLUDING THE HUMIDIFIER, FINAL
FILTERS, AND THE RETURN AIR FAN. INSTALL NEW GLYCOL ENERGY RECOVERY
LOOP AND PUMP. MAKE DUCTWORK AND PIPING CONNECTIONS TO EXISTING
MAINS IN SERVICE BAY 2 AND CORRIDOR CB-3.
• INSTALL NEW EXHAUST AIR FANS WITHIN SERVICE BAY 2.
• INSTALL NEW TERMINAL UNITS AND ASSOCIATED BRANCH DUCTWORK, PIPING,
DDC CONTROLS, THERMOSTATS, ACCESSORIES, ETC. ON THE BASEMENT FLOOR IN
AREA A.
PHASE 2A DEMOLITION AND NEW WORK
• REMOVE TEMPORARY DUCTWORK CONNECTIONS FROM TEMPORARY AIR
HANDLING UNIT.
• RELOCATE TEMPORARY AIR HANDLING UNIT AND TRAILER TO THE EXTERIOR OF
THE BASEMENT FLOOR MRI SUITE. PROVIDE TEMPORARY SUPPLY AND RETURN
DUCTWORK THROUGH EXISTING WINDOWS AND CONNECT TO EXISTING SUPPLY
AND RETURN DUCTWORK LOCATED WITHIN THE MRI SUITE ON THE BASEMENT
FLOOR. PROVIDE TEMPORARY SUPPLY AND RETURN DUCTWORK THROUGH
EXISTING WINDOWS AND CONNECT TO EXISTING SUPPLY AND RETURN DUCTWORK
LOCATED IN THE LABORATORY SPACE ON THE FIRST FLOOR.
PHASE 2B DEMOLITION
• DEMOLISH EXISTING AIR HANDLING UNIT 2-AHU-10, INCLUDING CONTROLS AND
EXTERNAL COMPONENTS SUCH AS HUMIDIFIERS, FINAL FILTERS, ETC. DEMOLISH
ASSOCIATED DUCTWORK AND PIPING WITHIN SERVICE BAY 32.
• DEMOLISH EXISTING EXHAUST AIR AND RELIEF AIR FANS WITHIN SERVICE BAY 32.
• DEMOLISH EXISTING TERMINAL UNITS AND NECESSARY BRANCH DUCTWORK,
PIPING, CONTROLS, THERMOSTATS, ACCESSORIES, ETC. ON THE BASEMENT
FLOOR IN AREA B AND ON THE FIRST FLOOR.
PHASE 2C NEW WORK
• INSTALL NEW AIR HANDLING UNIT 2-AHU-10 IN SERVICE BAY 32. INSTALL NEW
EXTERNAL AIR HANDLING UNIT COMPONENTS INCLUDING THE HUMIDIFIER, FINAL
FILTERS, AND THE RETURN AIR FAN. INSTALL NEW GLYCOL ENERGY RECOVERY
LOOP AND PUMP. MAKE DUCTWORK AND PIPING CONNECTIONS TO EXISTING
MAINS IN SERVICE BAY 32 AND CORRIDOR CB-6.
• INSTALL NEW EXHAUST AIR FANS WITHIN SERVICE BAY 32.
• INSTALL NEW TERMINAL UNITS AND ASSOCIATED BRANCH DUCTWORK, PIPING,
DDC CONTROLS, THERMOSTATS, ACCESSORIES, ETC. ON THE BASEMENT FLOOR IN
AREA B AND ON THE FIRST FLOOR.
PHASE 2D DEMOLITION
• REMOVE TEMPORARY AIR HANDLING UNIT CONNECTIONS TO EXISTING
DUCTWORK. REMOVE TEMPORARY AIR HANDLING UNIT IN IT'S ENTIRETY. RETURN
TO VA.
RETURN DUCTWORK W/O
DUCTLINER
SUPPLY DUCTWORK W/O
DUCTLINER
OUTSIDE AIR DUCTWORK W/O
DUCTLINER
Drawing File Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEPF ENGINEER:
of
ARCHITECT:
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
A u to d e s k D o c s /2
.1
V A
S a le m A
H U
R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs /4
C
E C e n tr a l M o d e l.
rv t
/4 /2
:1
:4
P M
M001
MECHANICAL - SYMBOLS, NOTES,
AND DRAWING INDEX
REPLACE BUILDING 2 AIR
HANDLER UNITS
SALEM, VA
658-24-102
12/03/2025 GAT NRB
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
MECHANICAL - DRAWING INDEX
Sheet
Number Sheet Name
M001 MECHANICAL - SYMBOLS, NOTES, AND DRAWING INDEX
M002 MECHANICAL - DETAILS
M003 MECHANICAL - SCHEDULES
M004 MECHANICAL - AHU SCHEDULES
M005 MECHANICAL - 2-AHU-9 SEQUENCE OF OPERATIONS
M006 MECHANICAL - 2-AHU-10 SEQUENCE OF OPERATIONS
M007 MECHANICAL - TERMINAL UNIT & EXHAUST FAN SEQUENCE OF OPERATIONS
M008 MECHANICAL - GLYCOL ENERGY RECOVERY SCHEMATIC
MH101A MECHANICAL - PHASE 1A - BASEMENT - AREA A
MD101B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - DUCTWORK - AREA A
MD102B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - PIPING - AREA A
MH101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - DUCTWORK - AREA A
MP101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - PIPING - AREA A
MH201A MECHANICAL - PHASE 2A - AREA B
MD201B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - DUCTWORK - AREA B
MD202B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - PIPING - AREA B
MD211B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - DUCTWORK
MD212B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - PIPING
MH201C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - DUCTWORK - AREA B
MH211C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - DUCTWORK
MP202C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - PIPING - AREA B
MP212C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - PIPING
MD201D MECHANICAL - PHASE 2D DEMOLITION - AREA B
34 70Revisions: Date:
Addendum 1 08/04/26
TI PI
TI PI FS
EXTEND TO
CLOSEST FLOOR DRAIN
1"
2" GWS
2" GWR
TI PI
PI
2-P-GER-9,
2-P-GER-10
SUCTION DIFFUSER
W/ STRAINER
2" GWR
CHECK
VALVE
AIR
SEPARATOR
EXPANSION
TANK
PRESSURE
REDUCING
VALVE
UNION
(TYPICAL)
CHECK
VALVE
(TYPICAL)
STRAINER
(TYPICAL)
BALL
VALVE
(TYPICAL)
2" GWS
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE AND INSTALL PIPING, SUPPORTS, AND HYDRONIC SPECIALTIES NOT PROVIDED WITH PUMPING PACKAGE INCLUDING AIR SEPARATORS, EXPANSION TANKS, CHEMICAL FEEDERS, ISOLATORS, BYPASS VALVES, ETC. INSTALLATION SHALL BE IN COMPLIANCE WITH DESIGN DOCUMENTS AND MANUFACTURER AND INSTALLATION
MANUALS. SUBMIT DRAWINGS FOR APPROVAL TO ENGINEER.
GLYCOL ENERGY RECOVERY SYSTEM SEQUENCE OF OPERATIONS
1. PUMP DESCRIPTION
A. THE GLYCOL ENERGY RECOVERY PUMP SHALL BE CONTROLLED BY AN ECM THAT IS ENABLED THROUGH THE BAS.
ALL ECM PARAMETERS MUST BE AVAILABLE ON A DEDICATED BAS GRAPHIC FOR THE PUMP.
B. THE ECM FOR THE PUMP SHALL BE SET UP DURING THE INITIAL TEST AND BALANCE FOR FULL FLOW IN THE LOOP.
C. IF THE PUMP FAILS TO START, AN ALARM SHALL BE ROUTED TO THE BAS.
D. THE SYSTEM SHALL CHECK TEMPERATURE CONDITIONS EVERY MINUTE AND ADJUST SEQUENCE AS REQUIRED.
1. COOLING MODE
A. WHEN THE OUTSIDE AIR TEMPERATURE IS HIGHER THAN THE RETURN AIR TEMPERATURE, THE GLYCOL ENERGY
RECOVERY PUMP SHALL RUN AT FULL FLOW.
1. HEATING MODE
A. WHEN THE OUTSIDE AIR TEMPERATURE IS LOWER THAN 5 DEG F LOWER THAN THE SUPPLY AIR TEMPERATURE SETPOINT (50 DEG F (ADJ.)), THE GLYCOL ENERGY RECOVERY PUMP SHALL RUN AT FULL FLOW.
B. WHEN THE OUTSIDE AIR TEMPERATURE IS WITHIN 5 DEG F OF THE SUPPLY AIR TEMPERATURE SETPOINT
(BETWEEN 50 AND 55 DEG F (ADJ.)), THE PUMP SHALL MODULATE TO MINIMUM SPEED.
1. ECONOMIZER MODE
A. WHEN THE OUTSIDE AIR TEMPERATURE IS HIGHER THAN SUPPLY AIR TEMPERATURE SETPOINT (55 DEG F (ADJ.))
AND LOWER THAN THE RETURN AIR TEMPERATURE, THE PUMP SHALL RUN AT MINIMUM SPEED.
1. FREEZE/FROST PROTECTION
A. WHEN THE OUTSIDE AIR TEMPERATURE IS BELOW 10 DEF F (ADJ.) THE PUMP SHALL RUN AT FULL FLOW.
OPERATION 1. WHEN THE GLYCOL ENERGY RECOVERY SYSTEM IS ENABLED, THE GLYCOL ENERGY RECOVERY
PUMP SHALL BE ENABLED.
WATER BACKFLOW PREVENTER
(BY OTHERS)
1"
LEGEND
FS
TI
PI
M
WATER FLOW SWITCH
THERMOMETER IN PIPING WELL
PRESSURE GAUGE IN PIPING WELL
BALL VALVE
GATE VALVE
WATER FLOW BALANCING VALVE
MOTORIZED ISOLATION VALVE (2 WAY)
2" GWS
CHEMICAL
SHOT FEEDER
2" VALVE FOR
QUICK FILL
2" GWS
CONTROL VALVE (3 WAY)
UNION
CHECK VALVE
STRAINER
2" VALVE W/
BLIND FLANGE
1" CW MAKEUP PIPING
ISOLATION CONTROL VALVE
GLYCOL ENERGY RECOVERY SCHEMATIC
TIPI
TIPIFS
EXTEND TO
1"
2" VALVE WITH
BLIND FLANGE
QUICK FILL
AUTOMATIC
AIR VENT
CLOSEST FLOOR DRAIN
OUTSIDE AIR
ENERGY RECOVERY
COIL
2-ERC-9, 2-ERC-10
EXHAUST AIR
ENERGY RECOVERY
COIL
2-ERC-9E, 2-ERC-10E
Drawing File Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEPF ENGINEER:
of
ARCHITECT:
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
A u to d e s k D o c s /2
.1
V A
S a le m A
H U
R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs /4
C
E C e n tr a l M o d e l.
rv t
/4 /2
:1
:4
P M
M008
MECHANICAL - GLYCOL ENERGY
RECOVERY SCHEMATIC
REPLACE BUILDING 2 AIR
HANDLER UNITS
SALEM, VA
658-24-102
08/04/2026 GAT NRB
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
Revisions: Date:
Addendum 1 08/04/26
| 24-0299_A_v25_COVERSHEET_REVISION |
| M001 - MECHANICAL - SYMBOLS, NOTES, AND DRAWING INDEX |
| M008 - MECHANICAL - GLYCOL ENERGY RECOVERY SCHEMATIC |
File details come from the government source that posted it. Updated .