This is an Asbestos & Hazmat Testing Report prepared for the 35% Schematic Design (SD) submission for a renovation project at Salem VA Medical Center in Salem, Virginia. The report documents inspection and testing results for Building 2 air handler replacement (VA Project 658-24-102), conducted by Castle Hill Associates on June 4-5, 2025.
The inspection and laboratory analysis determined that no asbestos-containing materials are present in the Air Handling Rooms or affected building areas. All 26 bulk samples tested using polarized light microscopy (PLM) analysis by Eurofins Built Environment Testing East, LLC returned negative results for asbestos content. Lead-based paint testing using X-ray fluorescence (XRF) on 17 locations also yielded negative results, with all readings below the 1.0 mg/cm² EPA threshold for lead-based paint. However, mold-impacted materials were identified: approximately 30 linear feet of fiberglass pipe insulation and duct insulation jackets, plus approximately 390 square feet of concrete floors in Building 2 and Building 32 AHU Rooms, all showing visible mold growth. The estimated abatement cost for mold remediation is $6,370.00, based on 2026/27 construction costs using Davis-Bacon prevailing wage rates for Roanoke, Virginia. The report includes inspector certifications (Virginia Asbestos Inspector and EPA Lead Paint Risk Assessor licenses), laboratory accreditations, photographs of affected areas, detailed sampling data, and references to a 2019 baseline asbestos reinspection survey covering 59 buildings across the Salem VA campus.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS & HAZMAT TESTING REPORT FOR 35% SD SUBMISSION
SALEM VA MEDICAL CENTER, SALEM, VA
REPLACE AIR HANDLERS IN BLDG. 2
VA PROJECT 658-24-102
JUNE 2025
Date: June 13, 2025
Items: Summary Results of Asbestos/HazMat Survey, Visual Inspection, Lab Results
Inspector: Brett Brumbaugh, Castle Hill Associates
ASBESTOS INSPECTION FINDINGS
As a result of this inspection and previous testing, it has been determined that no asbestos is present in the Air Handling Rooms or building areas which will be impacted by the renovations required for this project.
LEAD-BASED PAINT
As a result of this inspection, there were no painted building components identified in the renovation areas coated with lead-based paint as a result of the XRF testing of the painted surfaces in the work areas.
MOLD IMPACTED MATERIALS
As a result of this inspection, the following mold impacted building components were identified in the renovation areas:
Mold Impacted Materials Locations Quantity
Fiberglass pipe insulation and duct insulation jackets
B2 and B32 AHU Rooms ~ 130 lf/sf of insulation
Concrete floors B2 and B32 AHU Rooms ~ 390 sf of concrete
SALEM VA MEDICAL CENTER, SALEM, VA - REPLACE AIR HANDLERS IN BLDG. 2 – BASEMENT
ABATEMENT COST ESTIMATE
Estimator: Brett Brumbaugh
Notes: Based on 2026/27 construction and bidding (normal working hours).
EXCLUDES:
• Overtime or shift work.
INCLUDES:
• Bonds, insurance, contractor overhead and profit
• Davis-Bacon prevailing wage rates for Roanoke, VA
Description Material/Task Quantity Unit Cost Amount
HazMat Abatement
02 85 16 Mold remediation - pipe/duct insulation 130 $22.00 $2,860.00
02 85 16 Mold remediation - concrete cleaning 390 $9.00 $3,510.00
TOTAL COST ESTIMATE $6,370.00
ASBESTOS & HAZMAT TESTING REPORT
LOCATION:
SALEM VA MEDICAL CENTER
1201 BROAD ROCK BLVD.
SALEM, VA 23249
PROJECT:
REPLACE BUILDING 2 AIR HANDLERS
VA PROJECT #: 658-24-102
SAMPLING DATE:
JUNE 4, 2025
CONSULTANT:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., UNIT E
WATERVILLE, OH 43566
567-952-0192 www.CASTLEHILLASSOCIATES.com http://www.castlehillassociates.com/
TABLE OF CONTENTS
• ASBESTOS & HAZMAT INSPECTION SUMMARY AND FINDINGS
• PHOTOGRAPHS OF MOLD IMPACTED MATERIALS
• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS
• LEAD XRF TESTING DESCRIPTIONS AND RESULTS
• ASBESTOS LABORATORY REPORT
• INSPECTOR & ASBESTOS LABORATORY CERTIFICATIONS
• 2019 ASBESTOS REINSPECTION DATA
ASBESTOS & HAZMAT TESTING SUMMARY
On January 6, 2025, Brett Brumbaugh performed asbestos and lead-based paint testing at the Salem VA Medical Center in Salem, VA in preparation of the renovations required for the replacement of the Air Handlers in the AHU Rooms and other building areas in Building 2.
As part of this inspection, the previous asbestos testing conducted by Castle Hill Associates in 2019 on the Salem VA campus were utilized to develop this report in addition to the samples collected during this inspection. Castle Hill conducted this survey for the VA and sampled all suspect materials in the building or referenced the previous asbestos baseline inspection.
ASBESTOS INSPECTION FINDINGS
As a result of this inspection and previous testing, it has been determined that no asbestos is present in the Air Handling Rooms or building areas which will be impacted by the renovations required for this project.
LEAD-BASED PAINT
As a result of this inspection, there were no painted building components identified in the renovation areas coated with lead-based paint as a result of the XRF testing of the painted surfaces in the work areas.
MOLD IMPACTED MATERIALS
As a result of this inspection, the following mold impacted building components were identified in the renovation areas:
Mold Impacted Materials Locations Quantity
Fiberglass pipe insulation and duct insulation jackets
B2 and B32 AHU Rooms ~ 30 lf of insulation
Concrete floors B2 and B32 AHU Rooms ~ 390 sf of concrete
CONCLUSIONS/RECOMMENDATIONS
The identified mold impacted materials with visible mold growth should be removed by a qualified remediation contractor prior to the renovations. All mold remediation work is recommended to be conducted by a qualified remediation contractor utilizing industry standard practices for mold remediation and in accordance with VA specifications.
Since no asbestos containing materials or lead-based paint was identified in the 2 AHU rooms which will have the air handlers replaced and other affected building areas, abatement will not be necessary prior to renovation.
Inspector, Brett L. Brumbaugh, REPA, CESCO Virginia Licensed Asbestos Inspector EPA Licensed Lead Paint Risk Assessor
PHOTOGRAPHS OF MOLD GROWTH IN WORK AREAS
Photo 1 Duct insulation
Photo 2
Photo 3
PHOTOGRAPHS OF MOLD GROWTH IN WORK AREAS
Photo 4 Pipe insulation
Photo 5 Concrete floors
Photo 6 Concrete floors
ASBESTOS BULK SAMPLING TESTING DATA
PLM Asbestos Bulk Sampling Data
Salem VA Medical Center - Salem, VA
Building 2 AHU Replacement Project
658-24-103
June 5, 2025
Brett L. Brumbaugh
Asbestos Inspector - Commonwealth of Virginia
June 11, 2025
Eurofins Built Environment Testing East, LLC - Chantilly, VA
1 2 AHU Rm. 32 White FG pipe insulation jacket mastic No Asbestos Detected
2 2 AHU Rm. 32 White FG pipe insulation jacket mastic No Asbestos Detected
3 2 AHU Rm. 32 White FG pipe insulation jacket mastic No Asbestos Detected
4 2 AHU Rm. 2 White FG pipe insulation jacket mastic No Asbestos Detected
5 2 AHU Rm. 2 White FG pipe insulation jacket mastic No Asbestos Detected
6 2 AHU Rm. 2 White FG pipe insulation jacket mastic No Asbestos Detected
7 2 AHU Rm. 32 White FG pipe duct insulation jacket mastic No Asbestos Detected
8 2 AHU Rm. 32 White FG pipe duct insulation jacket mastic No Asbestos Detected
9 2 AHU Rm. 32 White FG pipe duct insulation jacket mastic No Asbestos Detected
10 2 AHU Rm. 2 White FG pipe duct insulation jacket mastic No Asbestos Detected
11 2 AHU Rm. 2 White FG pipe duct insulation jacket mastic No Asbestos Detected
12 2 AHU Rm. 2 White FG pipe duct insulation jacket mastic No Asbestos Detected
13 2 AHU Rm. 32 White duct seam mastic on metal ducts No Asbestos Detected
14 2 AHU Rm. 32 White duct seam mastic on metal ducts No Asbestos Detected
15 2 AHU Rm. 32 White duct seam mastic on metal ducts No Asbestos Detected
16 2 AHU Rm. 2 White duct seam mastic on metal ducts No Asbestos Detected
17 2 AHU Rm. 2 White duct seam mastic on metal ducts No Asbestos Detected
18 2 AHU Rm. 2 White duct seam mastic on metal ducts No Asbestos Detected
19 2 AHU Rm. 2 Brown duct seam mastic on metal ducts No Asbestos Detected
20 2 AHU Rm. 2 Brown duct seam mastic on metal ducts No Asbestos Detected
21 2 AHU Rm. 2 Brown duct seam mastic on metal ducts No Asbestos Detected
22 2 AHU Rm. 2 Drywall board No Asbestos Detected
23 2 AHU Rm. 2 Drywall board No Asbestos Detected
24 2 Hall by Rm. 32 2x2 lay-in ceiling tile No Asbestos Detected
25 2 Hall by 105 2x2 lay-in ceiling tile No Asbestos Detected
26 2 Hall by 212 2x2 lay-in ceiling tile No Asbestos Detected
Certification:
Analysis Dates:
Laboratory:
Site:
Building:
Project:
Sampling Date:
Inspector:
ROOMBUILDING MATERIAL ASBESTOS CONTENT
SAMPLE
LEAD XRF TESTING DATA
LEAD PAINT XRF TESTING DATA AND RESULTS
Salem VA Medical Center - Salem, VA
Building 2 AHU Replacement Project
658-24-102
Brett Brumbaugh
XRF Info.: Viken Detection Model Pb200i - SN 2757
Reading # Bldg. # Floor Building Area/Room Component Paint Color Substrate Pb Conc.
mg/cm2 Result
1 2 B Rm. 32 AHU Room Wall White Concrete 0.0 Negative
2 2 B Rm. 32 AHU Room Steam line White Metal 0.5 Negative
3 2 B Rm. 32 AHU Room Column White Concrete 0.2 Negative
4 2 B Rm. 32 AHU Room Ceiling White Concrete 0.4 Negative
5 2 B Rm. 32 AHU Room Duct White Metal 0.2 Negative
6 2 B Rm. 32 AHU Room AHU White Metal 0.1 Negative
7 2 B Rm. 32 AHU Room Column Blue Concrete 0.0 Negative
8 2 B Rm. 2 AHU Room Wall White Concrete 0.0 Negative
9 2 B Rm. 2 AHU Room Steam line White Metal 0.4 Negative
10 2 B Rm. 2 AHU Room Column White Concrete 0.2 Negative
11 2 B Rm. 2 AHU Room Ceiling White Concrete 0.3 Negative
12 2 B Rm. 2 AHU Room Duct White Metal 0.1 Negative
13 2 B Rm. 2 AHU Room AHU White Metal 0.1 Negative
14 2 B Rm. 2 AHU Room Column Blue Concrete 0.2 Negative
15 2 B Rm. 2 AHU Room Wall White Drywall 0.1 Negative
16 2 B Rm. 2 AHU Room Wall Tan Cer. Tile 0.4 Negative
17 2 B Rm. 2 AHU Room Floor Gray Concrete 0.1 Negative
NOTE: Any XRF reading equal to or greater than 1.0 mg/cm2 is considered to be lead-based paint (LBP) per EPA
NOTE: Any XRF reading greater than 0.0 mg/cm2 is considered to be lead-containing paint (LCP) per OSHA
June 5, 2025
Project Name:
Location:
Project Number:
Inspector:
Date:
ASBESTOS LAB REPORT
Approved by:
Approved Signatory Alexis Starrett
Report for:
Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566
Regarding:
Eurofins Built Environment Testing East, LLC Project: Salem VAMC; B2 Air Handlers
EML ID: 4100247
All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received and tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.
Eurofins Built Environment Testing East, LLC ("the Company"), a member of the Eurofins Built Environment Testing group of companies, shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.
Dates of Analysis:
Asbestos PLM: 06-11-2025
Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EB-AS-S-1267) NVLAP Lab Code 600331-0
EMLab ID: 4100247, Page 1 of 12Eurofins Built Environment Testing East, LLC
Eurofins Built Environment Testing East, LLC 4460 Brookfield Corporate Drive, Suite A, Chantilly, VA 20151
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Total Samples Submitted: 26 Total Samples Analyzed: 26
Total Samples with Layer Asbestos Content > 1%: 0
Location: 1, White FG Mastic - Pipe Lab ID-Version‡: 20454852-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Composite Non-Asbestos Content: 5% Mineral Wool 2% Wollastonite
Sample Composite Homogeneity: Good
Location: 2, White FG Mastic - Pipe Lab ID-Version‡: 20454853-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Composite Non-Asbestos Content: 5% Mineral Wool 2% Wollastonite
Sample Composite Homogeneity: Good
Location: 3, White FG Mastic - Pipe Lab ID-Version‡: 20454854-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Composite Non-Asbestos Content: 5% Mineral Wool 2% Wollastonite
Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 2 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 4, White FG Mastic - Pipe Lab ID-Version‡: 20454855-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Yellow Insulation ND Composite Non-Asbestos Content: 10% Mineral Wool
2% Wollastonite Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 3 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 5, White FG Mastic - Pipe Lab ID-Version‡: 20454856-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Composite Non-Asbestos Content: 5% Mineral Wool 2% Wollastonite
Sample Composite Homogeneity: Good
Location: 6, White FG Mastic - Pipe Lab ID-Version‡: 20454857-1
Sample Layers Asbestos Content White Mastic ND Beige Mastic ND
Yellow Insulation ND Composite Non-Asbestos Content: 10% Mineral Wool
2% Wollastonite Sample Composite Homogeneity: Good
Location: 7, White FG Mastic - Ducts Lab ID-Version‡: 20454858-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND White Tape 2 ND
Yellow Mastic 3 ND Silver Foil 2 ND
Composite Non-Asbestos Content: 50% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Poor
EMLab ID: 4100247, Page 4 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 8, White FG Mastic - Ducts Lab ID-Version‡: 20454859-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND White Tape 2 ND
Yellow Mastic 3 ND Silver Foil 2 ND
Composite Non-Asbestos Content: 50% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Poor
EMLab ID: 4100247, Page 5 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 9, White FG Mastic - Ducts Lab ID-Version‡: 20454860-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND White Tape 2 ND
Yellow Mastic 3 ND Silver Foil 2 ND
Composite Non-Asbestos Content: 50% Cellulose 5% Glass Fibers
Sample Composite Homogeneity: Poor
Location: 10, White FG Mastic - Ducts Lab ID-Version‡: 20454861-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND Composite Non-Asbestos Content: 50% Cellulose
5% Glass Fibers Sample Composite Homogeneity: Moderate
EMLab ID: 4100247, Page 6 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 11, White FG Mastic - Ducts Lab ID-Version‡: 20454862-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND Composite Non-Asbestos Content: 50% Cellulose
5% Glass Fibers Sample Composite Homogeneity: Moderate
Location: 12, White FG Mastic - Ducts Lab ID-Version‡: 20454863-1
Sample Layers Asbestos Content White Mastic ND White Tape 1 ND
Yellow Mastic 1 ND Silver Foil 1 ND
Yellow Mastic 2 ND Composite Non-Asbestos Content: 50% Cellulose
5% Glass Fibers Sample Composite Homogeneity: Moderate
EMLab ID: 4100247, Page 7 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 13, Duct Seam Sealant - White Lab ID-Version‡: 20454864-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
Location: 14, Duct Seam Sealant - White Lab ID-Version‡: 20454865-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
Location: 15, Duct Seam Sealant - White Lab ID-Version‡: 20454866-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
Location: 16, Duct Seam Sealant - White Lab ID-Version‡: 20454867-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 8 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 17, Duct Seam Sealant - White Lab ID-Version‡: 20454868-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
Location: 18, Duct Seam Sealant - White Lab ID-Version‡: 20454869-1
Sample Layers Asbestos Content White Sealant with Paint ND
Composite Non-Asbestos Content: 5% Cellulose Sample Composite Homogeneity: Good
Location: 19, Duct Seam Sealant - Gray Lab ID-Version‡: 20454870-1
Sample Layers Asbestos Content Gray Sealant ND
Composite Non-Asbestos Content: 2% Synthetic Fibers Sample Composite Homogeneity: Good
Location: 20, Duct Seam Sealant - Gray Lab ID-Version‡: 20454871-1
Sample Layers Asbestos Content Gray Sealant ND
Composite Non-Asbestos Content: 2% Synthetic Fibers Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 9 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 21, Duct Seam Sealant - Gray Lab ID-Version‡: 20454872-1
Sample Layers Asbestos Content Gray Sealant ND
Composite Non-Asbestos Content: 2% Synthetic Fibers Sample Composite Homogeneity: Good
Location: 22, Drywall Board Lab ID-Version‡: 20454873-1
Sample Layers Asbestos Content White Drywall with Brown Paper ND
Composite Non-Asbestos Content: 10% Cellulose 2% Glass Fibers
Sample Composite Homogeneity: Good
Location: 23, Drywall Board Lab ID-Version‡: 20454874-1
Sample Layers Asbestos Content White Drywall with Brown Paper ND
Composite Non-Asbestos Content: 10% Cellulose 2% Glass Fibers
Sample Composite Homogeneity: Good
Location: 24, 2x2 Ceil Tile Lab ID-Version‡: 20454875-1
Sample Layers Asbestos Content Beige Ceiling Tile with White Surface ND
Composite Non-Asbestos Content: 60% Cellulose 30% Mineral Wool
Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 10 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
Location: 25, 2x2 Ceil Tile Lab ID-Version‡: 20454876-1
Sample Layers Asbestos Content Beige Ceiling Tile with White Surface ND
Composite Non-Asbestos Content: 60% Cellulose 30% Mineral Wool
Sample Composite Homogeneity: Good
Location: 26, 2x2 Ceil Tile Lab ID-Version‡: 20454877-1
Sample Layers Asbestos Content Beige Ceiling Tile with White Surface ND
Composite Non-Asbestos Content: 60% Cellulose 30% Mineral Wool
Sample Composite Homogeneity: Good
EMLab ID: 4100247, Page 11 of 12Eurofins Built Environment Testing East, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
(866) 871-1984 www.eurofinsus.com/Built Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Salem VAMC; B2 Air Handlers
Date of Sampling: 06-04-2025 Date of Receipt: 06-06-2025 Date of Report: 06-11-2025
ASBESTOS PLM REPORT
PROJECT ANALYST AND SIGNATORY REPORT
Project Analyst
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".
Analyst: Caroline Yeager
EMLab ID: 4100247, Page 12 of 12Eurofins Built Environment Testing East, LLC
INSPECTOR & LAB CERTIFICATIONS
INSPECTOR LICENSES
2019 ASBESTOS SURVEY DATA
ASBESTOS REINSPECTION REPORT
LOCATION:
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
PROJECT NO.: V06-18-102
CONTRACT: 36C24619N0872
INSPECTION DATES:
AUGUST 13-15, 2019
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
SALEM VA MEDICAL CENTER – SALEM, VA
AUGUST 2019
1.0 EXECUTIVE SUMMARY
On August 13-15, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 59 buildings on the site of the Salem VA Medical Center in Salem, VA. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number
Building Name/Description Total Square
Footage Year Built
CC Connecting Corridors 26300 1934
1 Medical Center Admin 16627 1934
2 NHCU Dental Nuclear Medicine 84163 1934 Renovated 1995
2A ER Lab Radiology CLC Dining 57977 1979
4 N&F Service Canteen Med Media 68991 1934 Renovated 1992
5 Auditorium 24252 1934
7 Psych Units Social Work Admin 41243 1934 Renovated 1994
8 Bio Med Shops 40742 1938 Renovated 1980
9 Psych Unit PTSD Unit Psych Off 40315 1941
10 Network Payment Office 43503 1940
11 Outpatient Psychiatry Psych Off 39771 1938
12 Prosthetics & Admin 41103 1939 Renovated 1987
13 Boiler Plant 20153 1934 Renovated 1992
14 Laundry 19240 1934
15 Laundry CWT Storage 17142 1934
16 VISN CO Offices 9039 1934
18 Residential Quarters 3511 1934
19 Residential Duplex Quarters 7023 1934
23 Pump House 240 1934
25 Quarters 6975 1845
31 FMS Paint Shop 1835 1936
46 Engineering Recreation Storage 1184 1937
72 Engineering Storage 1344 1942
74 Administration 46697 1944
75 VISN Tenant Space Education 47015 1944 Renovated 1972
76 FMS Shops AFGE 44517 1944
77 FMS Shops Student Quarters 47115 1944 Renovated 1980
80 Greenhouse 1303 1943
85 FMS Sheet Metal Shop 960 1945
116 Storage 228 1930
117 Storage 2436 1956
121 Greenhouse 844 1956
125 Water Tower N/A 1956
AUGUST 2019
Building Number
Building Name/Description Total Square
Footage Year Built
138 Emergency Generator 280 1980
139 Emergency Generator 280 1980
140 Emergency Generator 280 1980
141 Emergency Generator 280 1980
142 Emergency Generator 280 1980
143 Clinical Addition Main Hospital 343997 1992
144 Chapel Offices 4275 1985
145 FMS Plumbing Shop 3035 1987
146 Chapel Offices 670 1988
150 Smoking shelter
151 Smoking shelter
152 Smoking shelter
154 Emergency Generator #4 830 1980
155 Pool Pump House 130 1975
156 Emergency Generator 589 1993
157 Emergency Generator 840 1993
158 Smoking shelter
159 Smoking shelter
160 Smoking shelter
161 Smoking shelter
162 Water Main Building 168 1998
163 Water Main Building 130 1999
165 Smoking shelter
168 PTSD Outpatient Building 5000 2010
169 SCM Storage 3430 2010
170 Inpatient Mental Health 28016 2014
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a Commonwealth of Virginia certified Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
AUGUST 2019
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Building Number
Building Name/Description Asbestos Present
No Asbestos Present
CC Connecting Corridors X
1 Medical Center Admin X
2 NHCU Dental Nuclear Medicine X
2A ER Lab Radiology CLC Dining X
4 N&F Service Canteen Med Media X
5 Auditorium X
7 Psych Units Social Work Admin X
8 Bio Med Shops X
9 Psych Unit PTSD Unit Psych Off X
10 Network Payment Office X
11 Outpatient Psychiatry Psych Off X
12 Prosthetics & Admin X
13 Boiler Plant X
14 Laundry X
15 Laundry CWT Storage X
16 VISN CO Offices X
17 Residential Quarters X
18 Residential Quarters X
19 Residential Duplex Quarters X
23 Pump House X
25 Quarters X
26 Garage X
27 Garage X
28 Garage X
29 Swimming Pool X
31 FMS Paint Shop X
34 Engineering Storage Barn X
46 Engineering Recreation Storage X
72 Engineering Storage X
74 Administration X
75 VISN Tenant Space Education X
76 FMS Shops AFGE X
77 FMS Shops Student Quarters X
80 Greenhouse X
85 FMS Sheet Metal Shop X
AUGUST 2019
4.2 Asbestos-Containing Building Summaries
The following is a summary of the asbestos containing materials, locations, quantities of materials in each building which contains asbestos:
Building 1 - Medical Center Admin
Asbestos Containing Materials Locations (see Appendix G for exact locations on each floor)
Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
12” vinyl floor tile (all colors) and black mastic 1st and 2nd floor hallways; stairwells 2,380 sf
Black mastic under carpeting Basement, 1st, and 2nd floors 11,720 sf
Exterior door caulking All exterior entry doors 3 doors
Building 2 - NHCU Dental Nuclear Medicine
Asbestos Containing Materials Locations Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
9” vinyl floor tile (red & black) 2nd floor walkway/hall to Building 1 990 sf
Building 4 - N&F Service Canteen Med Media
Asbestos Containing Materials Locations Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Mud fittings on fiberglass insulated pipes Basement Mech. Room; pipe chases;
basement ceiling plenum
220 fittings
Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf 9” vinyl floor tile (red & white) Hall C1-111, storage room 224, 220 1,120 sf Linoleum sheet flooring Training room 102E 660 sf Ceramic wall tile mastic Basement Room 4 450 sf 2x4 lay-in ceiling tile Room 102C, 102D 360 sf Window caulking Under new caulking on all windows 2,110 lf
Building 5 – Auditorium
Asbestos Containing Materials Locations Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
9” vinyl floor tile (red & white) Corridors 211 and 212 560 sf Glue pods for 12” ceiling tile Stairwells 6A, 04C, and 200 480 sf Spot light wire insulation Auditorium stage and catwalk 16 lights
Building 2A - ER Lab Radiology CLC Dining
Asbestos Containing Materials Locations Quantity
White mastic on fittings on all pipe insulation G066, above ceilings, and in all pipe chases unknown
AUGUST 2019
ASBESTOS BULK SAMPLING INFORMATION
Facility: Salem VAMC - Salem, VA Building: Building 2 - NHCU Dental Nuclear Medicine Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0 Sampler: Brett Brumbaugh Accreditation: Commonwealth of Virginia – Asbestos Inspector #3303004018
PLM Laboratory Analysis Result
SAMPLE
NUMBER
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
29 12” gray floor tile and yellow mastic Stair 2A No Asbestos Detected
30 12” gray floor tile and yellow mastic Stair 3 No Asbestos Detected
31 Drywall mud/joint compound Stair 2A No Asbestos Detected
32 Door frame caulk Stair 2A door No Asbestos Detected
33 Door frame caulk Stair 3 door No Asbestos Detected
34 12” gray floor tile and yellow mastic Room 1 No Asbestos Detected
35 Drywall mud/joint compound Room 1 No Asbestos Detected
36 2x4 lay-in ceiling tile Corridor CB-2 No Asbestos Detected
37 2x4 lay-in ceiling tile Corridor C1-1 No Asbestos Detected
38 Gunnite wall coating Mech Room 38 No Asbestos Detected 39 Gunnite wall coating Mech Room 38 No Asbestos Detected
40 Gunnite wall coating Mech Room 38 No Asbestos Detected
41 Drywall mud/joint compound Stair 174 No Asbestos Detected
42 Cove base and tan mastic 1A-1034 No Asbestos Detected
43 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
44 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
45 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
46 Tan duct mastic 244A No Asbestos Detected
47 12” gray floor tile and yellow mastic 244A No Asbestos Detected
48 Cove base and tan mastic 244A No Asbestos Detected
49 Hard plaster Stair 315 No Asbestos Detected
50 Hard plaster Stair 305B No Asbestos Detected
51 Hard plaster Stair 215 No Asbestos Detected
52 Hard plaster Stair 205B No Asbestos Detected
53 Hard plaster Stair 174 No Asbestos Detected 54 Hard plaster Stair 3 No Asbestos Detected
55 Hard plaster Stair 2A No Asbestos Detected
56 2x2 lay-in ceiling tile Corridor C3-12 No Asbestos Detected
57 2x2 lay-in ceiling tile Corridor C3-2 No Asbestos Detected
58 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 3% Chrysotile
Mastic – No asbestos
59 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 4% Chrysotile
Mastic – No asbestos
60 9” red floor tile and black mastic Walkway on 2nd to Bldg. 1 No Asbestos Detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
CASTLE HILL ASSOCIATES, LLC.
DEPARTMENT OF VETERANS AFFAIRS
SALEM VA MEDICAL CENTER
SALEM, VIRGINIA
2019 ASBESTOS REINSPECTION
VA CONTRACT NUMBER: 36C24619N0872
LEGEND
ABC
PROJECT V06-18-102 VISN ASBESTOS SURVEY
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved : Division Chief
AutoCAD SHX Text Approved : Service Director
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Building Number
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Checked
AutoCAD SHX Text Department of
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
AutoCAD SHX Text Drawn
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Sheet 01 of 58
AutoCAD SHX Text Revisions
AutoCAD SHX Text Professional Seal:
AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER SALEM, VIRGINIA
AutoCAD SHX Text V06-18-102
AutoCAD SHX Text
AUGUST 2019
AutoCAD SHX Text
AFS
AutoCAD SHX Text
BLB
AutoCAD SHX Text
SALEM, VIRGINIA
AutoCAD SHX Text Dates
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text North:
AutoCAD SHX Text
CS
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION
AutoCAD SHX Text
ASBESTOS-CONTAINING MUDDED FITTINGS ON FIBERGLASS INSULATED PIPES
AutoCAD SHX Text
ASBESTOS-CONTAINING PIPE INSULATION DEBRIS IN SOIL/DIRT IN CRAWL SPACE
AutoCAD SHX Text
ASBESTOS-CONTAINING CLOTH DUCT VIBRATION ISOLATION CLOTHS
AutoCAD SHX Text
ASBESTOS-CONTAINING 9" VINYL FLOOR TILE
AutoCAD SHX Text
ASBESTOS-CONTAINING LINOLEUM SHEET FLOORING
AutoCAD SHX Text
ASBESTOS-CONTAINING 2'X4' LAY-IN CEILING TILE
AutoCAD SHX Text
ASBESTOS-CONTAINING 12" VINYL FLOOR TILE (ALL COLORS) AND BLACK MASTIC
AutoCAD SHX Text
ASBESTOS-CONTAINING BLACK MASTIC UNDER NON-ASBESTOS CARPETING
AutoCAD SHX Text
ASBESTOS-CONTAINING TRANSITE WALL PANELS/ RESTROOM STALL PARTITIONS
AutoCAD SHX Text
ASBESTOS-CONTAINING WINDOW GLAZING AND CAULKING
AutoCAD SHX Text
ASBESTOS-CONTAINING CERAMIC WALL TILE MASTIC
AutoCAD SHX Text
ASBESTOS-CONTAINING GLUE PODS FOR 12" CEILING TILE
AutoCAD SHX Text
ASBESTOS-CONTAINING EXTERIOR DOOR CAULKING
AutoCAD SHX Text
ASBESTOS-CONTAINING WINDOW FRAME CAULKING
AutoCAD SHX Text
ASBESTOS-CONTAINING VERTICAL CAULKING ON EXTERIOR PORCHES WOOD PILLARS
AutoCAD SHX Text
ASBESTOS-CONTAINING SPOT LIGHT WIRE INSULATION
N
S
W
E
BUILDING #2 - BASEMENT FLOOR PLAN
30 54 33 39 40 38
36 55 31
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
AREAWAY
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
FP
AutoCAD SHX Text
TO
AutoCAD SHX Text
CRAWL SPACE
AutoCAD SHX Text
TO
AutoCAD SHX Text
BUILDING 143
AutoCAD SHX Text
TO
AutoCAD SHX Text
BUILDING #1
AutoCAD SHX Text
TO
AutoCAD SHX Text
BUILDING #4
AutoCAD SHX Text
TUNNEL
AutoCAD SHX Text
FP
AutoCAD SHX Text
DRESSING RM
AutoCAD SHX Text 28D
AutoCAD SHX Text
DRESSING RM
AutoCAD SHX Text 28C
AutoCAD SHX Text
HOUSE KEEPING
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL STORAGE
AutoCAD SHX Text 11A
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
CB-1A
AutoCAD SHX Text
HOUSE KEEPING
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR RM
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CB-2
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
CB-1
AutoCAD SHX Text 1B
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1A
AutoCAD SHX Text
TRASH CHUTE
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL RM
AutoCAD SHX Text 37A
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CB-6
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
AutoCAD SHX Text
STAIR-3
AutoCAD SHX Text
CB-6A
AutoCAD SHX Text
MUSIC THERAPY
AutoCAD SHX Text 31A
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 31B
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 23A
AutoCAD SHX Text
AutoCAD SHX Text 28A
AutoCAD SHX Text
MRI
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 28B
AutoCAD SHX Text
MRI
AutoCAD SHX Text
AutoCAD SHX Text 28E
AutoCAD SHX Text 29A
AutoCAD SHX Text
CONTROL RM
AutoCAD SHX Text
AutoCAD SHX Text
MRI
AutoCAD SHX Text
AutoCAD SHX Text 29C
AutoCAD SHX Text 29B
AutoCAD SHX Text
OFFICE SWITCH BOARD
AutoCAD SHX Text
AutoCAD SHX Text
MECH/LIFE SAFETY EQUIP RM
AutoCAD SHX Text 21A
AutoCAD SHX Text
EQUIPMENT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 20A
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CHIEF OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
A/C EQUIP / MECH
AutoCAD SHX Text
AutoCAD SHX Text
STAIR-2
AutoCAD SHX Text 2A
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
KINESIO THERAPY CLINIC
AutoCAD SHX Text
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADMIN OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CB-2B
AutoCAD SHX Text
LINEN CHUTE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
OCCUPATIONAL THERAPY / OFFICE
AutoCAD SHX Text
AutoCAD SHX Text 5B
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 5A
AutoCAD SHX Text
PHYSICAL THERAPY CLINIC
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
IRM
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
MECH
AutoCAD SHX Text
EXIT
AutoCAD SHX Text
THIS AREA IS NOT IN BLDG. 2. SEE BLDG. 2A BSMT. DRAWING.
AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212
AutoCAD SHX Text…