Attachment AA - Cost Proposal_V3.pdf

PDF 115 KB Posted

Attached to
AS-NEEDED LITTER & ENCAMPMENT ABATEMENT
Solicitation number
PW-25-525
Issued by
California

About this file

Cost Proposal Summary: City of Long Beach Litter & Encampment Abatement Services

This is an Attachment AA Cost Proposal document for the City of Long Beach's Request for Proposals (RFP) for Litter & Encampment Abatement Services (Project PW-25-525). The RFP seeks contracted services for a two-year initial term with potential renewal periods. The cost proposal requires bidders to provide pricing for labor resources, including one laborer and one supervisor, with rates quoted on both per-hour and per-day (8-hour) bases. The proposal also includes optional charges for additional laborers and supervisors, as well as per-load pricing for dump loads. The document specifies that all quantities listed are annual estimates based on past usage and do not represent guaranteed commitments, with no minimum or maximum volumes implied.

All proposed fees must be inclusive of direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel, with special materials requiring prior written authorization from the City's project manager. Responses must be submitted on the provided cost proposal table without any alterations or changes; non-compliant submissions are subject to total rejection. The quoted costs must include all taxes and other charges, representing the total amount the City will pay for the two-year contract term. Bidders must specify maximum allowable price increases for each of three potential renewal periods. No minimum or maximum service volumes are guaranteed or implied in this pricing structure.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT AA - COST PROPOSAL

CITY OF LONG BEACH

REQUEST FOR PROPOSALS LITTER & ENCAMPMENT ABATEMENT SERVICES

Cost Proposal - The Cost Proposal should be prepared in the table below.

Each fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be purchased by the the contractor only after discussed with and authorized by the City projects manager or designee in writing.

COST SHALL BE SUBMITTED ON ATTACHMENT AA AS IS. NO ALTERATIONS OR

CHANGES OF ANY KIND ARE PERMITTED. RFP responses that do not comply will be subject to rejection in total. The cost quoted below shall include all taxes and all other charges, including travel expenses, and is the cost the City will pay for the two-year term of any contract that is a result of this RFP.

• Price increase shall not exceed ______% during the first renewal period.

• Price increase shall not exceed ______% during the second renewal period.

• Price increase shall not exceed ______% during the third renewal period.

Quantities listed herein are annual estimates based on past usage and are not to be construed as commitment. No minimum or maximum is guaranteed or implied.

ATTACHMENT AA -1

File details come from the government source that posted it. Updated .