Attachment A - Legionella Sampling Plan.docx

DOCX document 37 KB Posted

Attached to
B533--Potable Water Testing Federal contract opportunity
Solicitation number
36C25926Q0620
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This is an Environmental Testing Protocol attachment that establishes the Legionella Detection Program sampling requirements for the George E. Wahlen VA Medical Center. The contractor is responsible for collecting water samples from designated distribution endpoints across multiple buildings (1, 3, 14, 32, 42, 43, and cooling tower in building 27) to detect Legionella contamination in both patient care and non-patient areas. Sampling occurs monthly across quarterly cycles, with the first quarter month (October, January, April, July) requiring 35 total tests, the second quarter month (November, February, May, August) requiring 38 tests, and the third quarter month (December, March, June, September) requiring 38 tests. Each site outlet, except the building 43 pumphouse, requires two samples—one hot water and one cold water—with at least two samples sourced from ice machines or other pure cold-water sources per testing period.

The protocol mandates that contractors document water temperature, pH, and biocide levels at the time of sampling and rotate outlet locations for each testing period, except sites previously positive for Legionella must be retested. Water samples must be shipped to a CDC ELITE-certified laboratory within 24 hours of collection, with positive results reported to the Contracting Officer's Representative within 24 hours of lab receipt. All results must be formatted according to Attachment E specifications. Additional requirements include post-construction Legionella testing based on Infection Control Risk Assessments and recovery procedures following any water line disturbance to ensure adequate biocide concentration at the most distal affected site.

View the file

Other files for this federal contract opportunity

Other files attached to B533--Potable Water Testing, newest first.
File Type Posted
Statement of Work v2.docx DOCX document
36C25926Q0620 Questions and Answers.docx DOCX document
36C25926Q0620 0001.docx DOCX document
Solicitation v2.docx DOCX document
Wage Determination 2015-5489.pdf PDF
Past Performance Questionnaire.docx DOCX document
Attachment J Utah Certified Laboratories - Drinking Water.xlsx XLSX spreadsheet
Attachment D - Bacteria Testing Plan.docx DOCX document
Statement of Work.docx DOCX document
Attachment I - Campus Map.pdf PDF
Attachment G - EPA Quick Guide to Drinking Water Sample Collection.pdf PDF
852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
Attachment H - DDW-2022-035825 - BacT Repeat.pdf PDF
Attachment F - Quality Assurance Surveillance Plan.docx DOCX document
Attachment E - WSMT Legionella Reporting Template 02.xlsx XLSX spreadsheet
Attachment C - DDW-2021 DBP Sampling Plan.pdf PDF
Attachment B Lead and Copper Sampling Plan.xlsx XLSX spreadsheet
Solicitation.docx DOCX document
36C25926Q0620.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

GEORGE E. WAHLEN VA MEDICAL CENTER

ENVIRONMENTAL TESTING PROTOCOL (Legionella Detection Program)

1. Engineering Service determines the sampling sites.

2. Water testing frequency for Legionella is controlled by VHA Directive 1061, the VASLCHCS, and with the advisement of the Infection Preventionist.

3. The contractor will collect water samples for Legionella testing at distribution endpoints in patient care areas of buildings 1, 3, and 14, and non-patient buildings 32, 42, and 43, and the cooling tower (building 27). Samples must be “first draw.”

4. The Sampling Plan below outlines monthly testing requirements for each quarter.

a. Non-patient testing sites include:

Building 1 – Cold Tank Room Building 27 – Cooling Tower Building 42 – Unit 1 Soft Water Building 42 – Unit 2 Hard Water Building 32 – Unit 3 Hard Water Building 43 – Pumphouse

Sampling Plan

1st Month of Quarter (Oct, Jan, Apr, Jul)
Building
Sites
Tests
1
1
4
8
1
3
4
8
1
14
4
8
1
32
4
8
1
42
1
2
1
43
1
1
TOTAL
14
35
2nd Month of Quater (Nov, Feb, May, Aug)
Building
Sites
Tests
2
1
5
10
2
3
5
10
2
14
4
8
2
27
1
2
2
32
4
8
TOTAL
14
38
3rd Month of Quarter (Dec, Mar, Jun, Sep)
Building
Sites
Tests
3
1
6
12
3
3
5
10
3
14
3
6
3
27
1
2
3
32
3
6
3
42
1
2
TOTAL
16
38

Notes:

1) For each site outlet, except for building 43 pumphouse, two samples are required – one hot water and one cold water.

2) At least two of the samples collected must be from an ice machine or other pure cold-water source.

5. For each Legionella water sample, document water temperature, pH and level of biocide at the time of sampling.

6. New outlets will be chosen for each testing period. Any sites that were positive for Legionella during the previous testing will be re-tested the next time testing is conducted.

7. Water samples will be analyzed at a Centers for Disease Control and Prevention (CDC) Environmental Legionella Isolation Techniques Evaluation (ELITE) certified lab.

8. Contractor will collect the water samples and ship them within 24hrs to the testing lab. Water samples from outlets will be collected as follows:

9. The Contractor will provide positive sample results within 24hrs of receipt to minimize exposure risks to patients.

10. All results will be reported in the template format provided in Attachment E.

11. Post-Construction Legionella testing will be conducted per the requirements of the Infection Control Risk Assessment conducted by the Infection Control Preventionist for each applicable project.

12. Following any disturbance to the water line, recovery procedures will be performed to ensure biocide is present at the most distal site affected by the disturbance. This includes flushing the line until an adequate biocide concentration is reached.

File details come from the government source that posted it. Updated .