Attachment A - Itemized Schedule of Values Cost Breakdown.pdf
PDF 66 KB Posted
- Solicitation number
- 36C24825R0009
About this file
This document is an Attachment A - Itemized Schedule of Values Cost Breakdown related to a federal contract opportunity issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 8.
The federal contract opportunity (Solicitation Number 36C24825R0009) is for the EHRM Installation of Next-Gen Wi-Fi upgrades at the James A. Haley VA Hospital in Tampa, FL. The total project value is between $250,000 and $500,000. Key details include a site visit on 11/18/2024, a proposal due date of 12/08/2024, and a 180-calendar day performance period. The contract will be awarded to the responsible offeror whose proposal represents the best value to the government, with price and technical factors approximately equal. The opportunity is a 100% Service-Disabled Veteran-Owned Small Business set-aside. The Attachment A document provides a detailed cost breakdown by construction division, including labor, material, and total costs.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror City State Zip
Item Labor Cost Material Cost Total Cost
Division 1 $ - $ - $ -
Division 2 - - -
Division 3 - - -
Division 4 - - -
Division 5 - - -
Division 6 - - -
Division 7 - - -
Division 8 - - -
Division 9 - - -
Division 10 - - -
Division 11 - - -
Division 12 - - -
Division 13 - - -
Division 14 - - -
Division 21 - - -
Division 22 - - -
Division 23 - - -
Division 26 - - -
Division 27 - - -
Division 28 - - -
Division 31 - - -
Division 32 - - -
Division 33 - - -
Division 34 - - -
Overhead % -
Profit % -
Bond % -
Description
Base Offer Cost Breakdown
Masonry
Metals
Wood and Plastic
General Requirements
Existing Conditions
Concrete
Specialties
Equipment
Furnishings
Thermal & Moisture Protect
Doors and Windows
Finishes
Plumbing
HVAC
Electrical
Special Construction
Conveying Equipment
Fire Suppression
Exterior Improvements
Utilities
Transportation Subtotal
Communications
Electronic Safety & Security
Earthwork
Total Base Offer Cost
Overhead/Profit Subtotals :
Division Subtotals :
0.00%
0.00%
0.00%
File details come from the government source that posted it. Updated .