This document is a Request for Proposals (RFP) for the installation of next-generation Wi-Fi at the James A. Haley VA Hospital in Tampa, Florida. The project, titled "BB EHRM NextGen Wi-Fi Upgrades," has an estimated value between $250,000 and $500,000. The Government is seeking proposals from Service Disabled Veteran Owned Small Businesses (SDVOSBs) verified by the Veteran Small Business Certification (sba.gov) to perform the required work.
Key details include: a site visit scheduled for November 18, 2024, with a proposal due date of December 8, 2024; the contractor must perform at least 25% of the work with their own employees; the contractor must have an Experience Modification Rate (EMR) not exceeding 1.0; and the work is to be completed within 180 calendar days. The evaluation criteria include relevant past performance, technical/management approach, and price. The Government intends to award a single firm-fixed price contract to the offeror whose proposal is deemed the best value.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EHRM Site Name | VISN | Site Finish Date | Building | Floor | Number of APs | AP Names | Justifications/ Remarks |
| Tampa | 8 | 11/21/23 | 1 | Basement | 3 | AP36 - AP38 | The APs were not installed due to requiring conduit, left for site to install. |
| 1 | Ground | 1 | AP63 | The AP was not swapped due to being located in an area with known asbestos above the ceiling, left for site to install. | |||
| 1 | Ground | 21 | AP76, AP85 – AP92, AP98, AP101 – AP105, and AP107 – AP111 | The APs were not installed due to being located in an area with known asbestos above the ceiling, left for site to install. | |||
| 1 | Ground | 5 | AP80 – AP84 | The APs were not installed due to ECU not being available, left for site to install. | |||
| 1 | Ground | 6 | AP93 - AP97 and AP106 | The APs were not installed due to requiring conduit, left for the site to install. | |||
| 1 | 1 | 1 | AP37 | The AP was not swapped due to being in an active construction /asbestos area, left for site to install. | |||
| 1 | 1 | 34 | AP13, AP40, AP91, AP94 - AP100, AP102, AP108 - AP121, AP130, AP131, AP133 - AP135, AP137, AP139, AP141 and AP142 | The APs were not installed due to being in areas with known unabated asbestos above ceiling, left for site to install. | |||
| 1 | 1 | 1 | AP136 | The AP was not installed due to being located in an area with known asbestos above the ceiling and requiring conduit, left for site to install. | |||
| 1 | 1 | 8 | AP101, AP105 – AP107, AP128, AP129, AP138, AP140 | The APs were not installed due to ECU not being available, left for site to install. | |||
| 1 | 2 | 10 | AP88, AP89, AP94, AP95, AP98, AP100 - AP103 and AP105 | The APs were not installed due to being in areas with known unabated asbestos above ceiling, left for site to install. | |||
| 1 | 2 | 7 | AP62, AP92, AP107, AP108, AP110, AP111 and AP114 | The APs were not installed due to ECU not being available, left for site to install. | |||
| 1 | 2 | 4 | AP90, AP91, AP97 and AP112 | The APs were not installed due to requiring conduit, left for the site to install. | |||
| 1 | 2 | 3 | AP93, AP96 and AP99 | The APs were not installed due to not receiving approval from safety director to work in these specific areas, left for site to install. | |||
| 1 | 3 | 5 | AP19 – AP21, AP29 and AP30 | The APs were not installed due to being in areas with known unabated asbestos above ceiling, left for site to install. | |||
| 1 | 5 | 1 | AP27 | The AP was not installed due to a patient in room unable to be moved; cable is coiled up in ceiling outside room 5A-547, terminated, tested and to be pulled into room at a later date, left for site to install. | |||
| 30 | Ground | 1 | AP38 | The AP was not installed due to requiring conduit, left with site to install. | |||
| 32 | Basement | 2 | AP12 and AP13 | The APs were not installed due to requiring conduit, left with site to install. | |||
| 38 | Ground | 1 | AP102 | The AP was not installed due to requiring conduit, left with site to install. | |||
| 38 | 2 | 3 | AP44, AP45 and AP48 | The APs were not installed due to requiring conduit, left with site to install. | |||
| 38 | 3 | 2 | AP40 and AP42 | The APs were not installed due to requiring conduit. Cables pulled, terminated, tested, and left coiled above the ceiling in corridor outside of room A310-38 and in corridor outside of room A319-38 for site to install. | |||
| 38 | 3 | 1 | AP43 | The AP was not installed due to requiring conduit, left with site to install. | |||
| T49 | 1 | 1 | AP03 | The AP was not installed due to requiring conduit, left with site to install. | |||
| T78 | 1 | 1 | AP03 | The AP was not installed due to requiring conduit, left with site to install. | |||
| T99 | 1 | 3 | AP01 - AP03 | The APs were not installed due to requiring conduit, left with site to install. | |||
| Florida NCA | Maintenance | 1 | AP01 and AP02 | The APs were not installed due to requiring OSP cable and conduit, left for site to install. AP01 was installed by the site and is currently online as of 10/3/2023. | |||
| Home Oxygen | 1 | 1 | AP01 - AP04 | The APs were online after install but are now offline, last seen 2023-11-06T14:30:36, 2023-11-06T14:30:49, 2023-08-24T21:39:43, 2023-11-06T14:29:57 respectively. | |||
| Lecanto CBOC | 1 | 2 | AP01 and AP02 | The APs were online after install but are now offline, last seen 2023-08-29T04:33:35 and 2023-08-29T04:33:43. | |||
| New Port Richey CBOC | 1 | 1 | AP52 | The AP was online after install but is now offline, last seen 2023-10-30T05:24:09. | |||
| 130 |