This is a Launch Site Support Plan (LSSP) document that specifies common products and services required for NASA Launch Services (NLS) II spacecraft processing at launch site facilities. The plan, effective January 2025 (Revision B), establishes minimum requirements for spacecraft and launch vehicle processing in NASA-provided payload processing facilities (PPF) at Kennedy Space Center (KSC) or Vandenberg Space Force Base (VSFB). The document applies to facility contractors providing launch site processing support and requires them to submit proposals (marked "TBP" - To Be Proposed) for offerings that meet or exceed the specified requirements.

The Common Support Requirements Matrix details comprehensive facility, equipment, environmental, safety, and support services across multiple operational areas including cleanrooms, airlocks, control rooms, encapsulation bays, and office spaces. Cleanroom specifications require ISO 14644-1 Class 8 certification with strict environmental controls (65-75°F temperature, 30-60% relative humidity, particle counts, non-volatile residue levels, and hydrocarbon monitoring). Required equipment includes cranes with debris shields, forklifts, ESD workbenches, HEPA vacuums, particle counters, and safety equipment. For hazardous processing facilities (HPF), additional requirements include propellant preparation areas, fueling islands with spill containment, fuel venting systems, and breathing air accommodation. The plan also addresses power systems (208V and 120V circuits with UPS and generator backup), grounding certification, continuous monitoring with alarm systems, and daily environmental reporting. A separate Communication Support Requirements Matrix addresses telemetry and communication needs. The facility contractor must commit to providing all specified common support services or explain how alternative implementations will meet the requirement intent.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-EXPT

LSP-PLN-333.01-COMMON-LSSP

Revision: B January 2025

Launch Services Program

COMMON

Launch Site Support Plan

EAR 99 -- NO LICENSE REQUIRED

This information or item is controlled under the Export Administration Regulations (EAR) as EAR99. It may be exported without a license, except to countries subject to embargoes and other special controls or general prohibitions per 15 CFR Parts 736 and 746. The designation of EAR99 does not constitute approval for public release.

CUI//SP-EXPT

LSP-PLN-333.01-COMMON-LSSP

Revision: B

LSP-F-333.01-COMMON-LSSP

Revision: A September 2024

Approval Page

Scope of Agreement

The National Aeronautics and Space Administration (NASA) Launch Services Program (LSP) is tasked with the management of the integration and launch of spacecraft aboard commercial launch vehicles. This Launch Site Support Plan (LSSP) documents the common products and services for launch site processing provided for NASA Launch Services (NLS) II spacecraft customers in a NASA provided payload processing facility (PPF). These common requirements represent the minimum requirements for a NLS II LSP spacecraft and may be supplemented by a spacecraft LSSP.

Complimentary to the requirements, the applicable policies that govern launch site processing are documented in the LSP-UG-332.01, Guide for NASA Spacecraft Processing at Kennedy Space Center (KSC) or LSP-UG-332.02, Guide for NASA Spacecraft Processing at Vandenberg Space Force Base (VSFB).

Signature

Mark Shugg Chief, Launch Site Integration Branch

Authority

The decision authority of whether to create and release a Launch Site Support Plan (LSSP) resides with the Chief, Launch Site Integration Branch (Ref. Section 3.7 of KDP-B-1028).

Revision and Control

Publication of this LSSP is controlled in the NASA Technical Documentation System. Revisions to this LSSP are tracked on page 4 in the LSSP revision log. For the latest version of this LSSP or for comments, corrections, and updates direct your inquiry to the following:

Mark Shugg Chief, Launch Site Integration Branch National Aeronautics and Space Administration Telephone: 321-867-6368 E-Mail address: mark.d.shugg@nasa.gov

Common LSSP Revision Log

Revision
Date Published
Pages Affected
Change Description
Approval

Basic

December 2022

All

Publication of Common LSSP

See document

Revision A

September 2024

All

Clarifications on requirements scope and editorial changes

See document

Revision B
January 2025
Table 4.1
Correction on requirement scope.
See document

Table of Contents

Approval Page1
Common LSSP Revision Log3
Abbreviations and Acronyms5
Reference Documents8
1Spacecraft Project Description9
2Launch Site Processing9
2.1 Common Spacecraft Launch Site Processing9
Figure 2.1 Common Launch Site Processing Flow10
2.2 Launch Vehicle Processing Requiring LSP Support10
3RESERVED10
4Common Support Requirements And Communication Support Requirements Matrixes11
Table 4.1 Common Support Requirements14
Table 4.2 Common Communication Support Requirements73

Abbreviations and Acronyms

The following abbreviations and acronyms are used in this document.

µg Microgram

ACSAmerican Chemical Society
AmpAmpere
ANSIAmerican National Standards Institute
ASTMAmerican Society for Testing and Materials
BISBureau of Industry and Security
BNCBayonet Navy Connector
CCelsius
CCSFSCape Canaveral Space Force Station
CFM or cfmCubic Feet per Minute
cmCentimeter
COFRCertificate of Facility Readiness
COMMCommunication
CPSMCustomer Processing Support Manager
DHCPDynamic Host Configuration Protocol
DMZDemilitarized Zone
DNSDomain Name System
DVIDigital Visual Interface
EBEncapsulation Bay
EGSEElectrical Ground Support Equipment
EIEnd Instrument
EIAElectronic Industries Alliance
ELSAEmergency Life Support Apparatus
EOREscape Only Respirator
ESDElectrostatic Discharge
ENVIRONEnvironment
FFahrenheit
FaxFacsimile
ftfoot or feet
GbpsGigabyte per second
GHzGigahertz
GMTGreenwich Mean Time (UTC, Zulu)
GPSGlobal Positioning System
GSEGround Support Equipment
HDMIHigh-Definition Multimedia Interface
HEPAHigh Efficiency Particle Arrestor
HPFHazardous Processing Facility
HVACHeating, Ventilation, Air Conditioning
HzHertz
IESTInstitute of Environmental Sciences and Technology
IONETIP Operational Network
IPInternet Protocol
IPAIsopropyl Alcohol (same as 2-Propanol)
IRIGInter-Range Instrumentation Group
ISOInternational Organization for Standardization
ISPInternet Service Provider
ITInformation Technology

KSC Kennedy Space Center

LLaunch
LCDLiquid Crystal Display
LOCLocation
LMRLow Loss Cable Trademark Brand of Times Microwave
LSCLaunch Service Contractor
LSIMLaunch Site Integration Manager
LSPLaunch Services Program
LSSCLaunch Site Support Coordinator
LSSELaunch Site Support Engineer
LSSPLaunch Site Support Plan
LVLaunch Vehicle
MMeter
MbpsMegabits per Second
MCEMission Comm Engineer
MDRMission Dress Rehearsal
MFDMulti-Function Devices
MISCMiscellaneous
mlMillimeter
MOCMission Operations Center
N/ANot Applicable
NASANational Aeronautics and Space Administration
NATNetwork Address Translation
NEMANational Electrical Manufacturers Association
NISNNASA Integrated Services Network
NLS IINASA Launch Services II (contract)
NVRNon-Volatile Residue

OSHA Operational Safety and Health Administration

PAC or %ACPercent Area Coverage
PIDPhotoionization Detector
POTSPlain Old Telephone Service
PPFPayload Processing Facility
ppmParts Per Million
PTZPan, Tilt, Zoom
RFRadio Frequency
RHRelative Humidity
RJRegistered Jack
SC or S/CSpacecraft
SCAPESelf Contained Atmospheric Protective Ensemble
STDStandard
TAATechnical Assistance Agreement
TBDTo Be Determined
TBPTo Be Proposed
TIATelecommunications Industry Association
UGUser Guide
UPSUninterruptable Power Supply
VVolt
VACVolts Alternating Current
VAFBVandenberg Air Force Base
VGAVideo Graphics Array
VPNVirtual Private Network
VSFBVandenberg Space Force Base
WEPWired Equivalent Privacy
Wi-FiWireless Fidelity
WPAWi-Fi Protected Access

Reference Documents

The following is the list of documents referenced in this LSSP:

1.
ANSI/TIA-568-A
Commercial Building Telecommunications Cabling Standard
2.
ASTM-E-1234
Standard Practice for Handling, Transporting, and Installing Nonvolatile Residue (NVR) Sample Plates Used in Environmentally Controlled Areas for Spacecraft
3.
ASTM-E-1235
Standard Test Method for Gravimetric Determination of Nonvolatile Residue (NVR) in Environmentally Controlled Areas for Spacecraft
4.
IEST-STD-CC1246
Product Cleanliness Levels - Applications, Requirements, and Determination
5.
ISO 14644-1

and 14644-2 Airborne Particulate Cleanliness Classes in Cleanroom and Clean Zones

6.
LSP-UG-332.01
Guide for NASA Spacecraft Processing at the Kennedy Space Center (KSC) and Cape Canaveral Space Force Station (CCSFS)
7.
LSP-UG-332.02
Guide for NASA Spacecraft Processing at Vandenberg Space Force Base (VSFB)

1 Spacecraft Project Description

This LSSP reflects the most common processing flow and requirements for a LSP NLS II spacecraft processing in a NASA LSP-provided PPF. The common spacecraft configuration is a scientific or robotic spacecraft, with mono propellant, and with some contamination sensitive surfaces.

2 Launch Site Processing

A spacecraft project has prime responsibility for spacecraft assembly, test, and servicing while processing at the launch site. LSP provides support services to the spacecraft program and personnel at the launch site. The LSP Launch Site Integration Manager (LSIM) is responsible for arranging, coordinating, and verifying these launch site support services for LSP missions. An overview of the processing for a common LSP NLS II spacecraft is listed in section 2.1.

The Launch Service Contractor (LSC) has prime responsibility for launch vehicle (LV) hardware assembly, test, and servicing while processing in LSP provided facilities. LSP provides support services to the LSC at LSP provided facilities for the work necessary for the spacecraft to launch vehicle integration activities. An overview of the common processing for launch vehicles in a LSP-provided PPF is listed in section 2.2.

The spacecraft processing facility provider has prime responsibility for providing, operating, and maintaining the facility, along with providing the support and services necessary and agreed to allow the spacecraft and LSC to successfully prepare for launch.

2.1 Common Spacecraft Launch Site Processing

The detailed launch site processing products and services requested for LSP spacecraft are listed in the Common Support Requirements and Common Communication Support Requirements (Tables 4.1 and 4.2, respectively).

The common processing for a LSP NLS II spacecraft includes:

· ground support equipment (GSE) arrival at the processing facility

· setup of support areas at the processing facility including control rooms and office space

· spacecraft arrival, setup, and inspection

· spacecraft assembly and/or instrument integration (if required)

· spacecraft aliveness testing and system performance testing

· propellant loading/decontamination activities (if required)

· battery installation and charging

· final cleaning

· ordnance installation (if required)

A diagram of the most common launch site processing flow activities for LSP NLS II spacecraft is included as Figure 2.1.

Figure 2.1 Common Launch Site Processing Flow

2.2 Launch Vehicle Processing Requiring LSP Support

Common launch site processing products and services requested by the LSC are included in the attached Common Support Requirements and Common Communication Support Requirements (Tables 4.1 and 4.2, respectively) for processing in LSP-provided facilities. This LSSP expects the encapsulation of the spacecraft to occur in the processing facility, whether it be a payload processing facility (PPF), hazardous processing facility (HPF) or encapsulation bay (EB), and the requirements for encapsulation are included.

LSC activities may include the following:

· ground support equipment (GSE) arrival at the processing facility

· setup of support/office areas at the processing facility

· element cleaning

· mating of spacecraft to payload attach fitting or payload adapter

· system performance testing

· encapsulating spacecraft into fairing

· ordnance installation (if necessary)

· moving encapsulated spacecraft onto the transporter

3 RESERVED

Revision: B January 2025

4 Common Support Requirements And Communication Support Requirements Matrixes

The following Support Requirements Matrix contains items that shall be provided by the facility contractor to meet the requirements of a common LSP NLS II spacecraft customer, the LSC, and the launch site team in order to implement a successful launch site flow.

The facility contractor shall provide responses wherever to be proposed (TBP) is listed. This includes their commitment to provide the required items in the commitment column.

If a facility contractor cannot meet a particular requirement, the Comments/Implementation column should address how the intent of the requirement will be met. When specific information is requested in the Comments/Implementation column with a TBP, the facility contractor shall provide the information for the offered standard service. For example, in requirement 0001 the contractor shall provide the square footage of available cleanroom(s) being offered as a standard service:

0001
Cleanroom
Facility/ Space
Cleanroom Processing

Area Exclusive and secure ISO 14644-1 Class 8 cleanroom for spacecraft processing.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Square Footage:TBP

Location Descriptions:

The processing facility minimum requirements for a LSP spacecraft mission are dedicated use of one cleanroom with an airlock (shared use of airlock is acceptable) and a garment change room, one control room, two dedicated LSP offices, and two Spacecraft Customer office areas, as long as those facilities are able to meet the full set of requirements. The Contractor shall also provide access to conference areas and storage facilities.

Spacecraft non-hazardous processing, hazardous processing and encapsulation may occur in a single location capable of all the processing, or they may involve separate spaces for each phase subject to the dimensions, capabilities, and features of the facility offered for use.

A HPF is processing space outfitted to support spacecraft propellant loading or operations with other hazardous substances. If a facility contractor is not offering HPF capabilities for hazardous processing, all [HPF Only] designated requirements would be N/A.

An EB is an area for spacecraft mating to the LV adapter and encapsulation into the LV fairings. The EB requirements include the minimum requirements for preparing the launch vehicle adapter and fairing for encapsulating the spacecraft, as well as for encapsulation itself. The EB requirements are additive to the PPF or HPF requirements in either square footage, time, or both.

An airlock, or equivalent space, is required for hardware entry to a cleanroom from outside.

Control room space and office space are required for the duration of the processing through launch. If a spacecraft processing is conducted in multiple locations, the supporting facilities (control room, airlock, and offices) may be the same while the spacecraft is in each location or may also change with each change in spacecraft location.

Common Support Requirements Table Numbering Key:

Location (LOC)

Number Range
Location (LOC)
0001-0999
Cleanroom
1000-1999
Airlock
2000-2999
Control Room
3000-3999
Encapsulation Bay Requirements (EB)

Including LSC facility requirements for encapsulation

4000-4999
Office Areas (Office)
5000-5999
General – Requirements not specific to the defined areas
6000-6999
Reserved
7000-7999
Reserved
8000-8999
Reserved
9000-9999
Reserved
10000 +
Communication & Telemetry (COMM)

Category (CAT)

Number Range
Category
0001 – 0099
Facility Physical Space Requirements and Dimensions (Facility/Space)
0100 – 0199
Power/Electrical
0200 – 0299
Environment (Environ)
0300 – 0399
Equipment
0400 – 0499
Furnishings
0500 – 0599
Liquids & Gases
0600 – 0699
Non-Fluid Consumables, Garments and Wearable Equipment
0700 – 0799
Safety/Security
0800 – 0899
Miscellaneous (Misc.) Services and Support
0900 – 0999
Reserved

Table 4.1 Common Support Requirements

Req No.
Location
Category
Item
Requirement Description
Supplier/ Commit Source
Commitment
Comments/ Implementation
0001
Cleanroom
Facility/ Space
Cleanroom Processing

Area Exclusive and secure ISO 14644-1 Class 8 cleanroom for spacecraft processing.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Square Footage:TBP
0005
Cleanroom
Facility/ Space
Cleanroom

Door Size Cleanroom door sized to allow entry and exit of the spacecraft hardware.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Dimensions: TBP
0010
Cleanroom
Facility/ Space
Garment Change Room
Personnel airlock/garment change room at the entrance to the cleanroom.
Facility Contractor
TBP
TBP, if needed
0020
Cleanroom
Facility/ Space
Purge Gas Source Access
Pass-throughs or plumbing for bringing purge gases into the cleanroom from an outside source.
Facility Contractor
TBP
TBP, if needed
0050
Cleanroom
Facility/ Space
Propellant Equipment Preparation Area
[HPF Only]

Clean work area in or near the cleanroom for the stowing and preparation of the propellant loading equipment to fuel the spacecraft. Area also to be used for propellant storage during the thermal acclimation period for a minimum 3 days prior to sampling/loading.

This space should be separate but contiguous with the spacecraft processing area.

Facility Contractor
TBP
TBP, if needed
0052
Cleanroom
Facility/ Space
Propellant Equipment Decon Space
[HPF Only]

Space for initial decontamination and safing of propellant GSE.

Facility Contractor
TBP
TBP, if needed
0054
Cleanroom
Facility/ Space
Fueling Island
[HPF Only]

Spacecraft fueling area in the cleanroom with spill containment.

Facility Contractor
TBP
Dimensions: TBP
0056
Cleanroom
Facility/ Space
Fuel Venting Accommodation
[HPF Only]

Facility fuel scrubber system or accommodations for a bubbler tank.

Bubbler tank accommodations to include outside space adjacent to the spacecraft fueling building, with pass-throughs from the outside into the fueling area.

Facility Contractor
TBP
TBP, if needed
0058
Cleanroom
Facility/ Space
Breathing Air Accommodation
[HPF Only]

Air regulation and distribution panel system or pass-throughs from the outside into the fueling area for breathing air lines to support fueling operations.

Facility Contractor
TBP
TBP, if needed
0100
Cleanroom
Power/ Electrical
Power
208 volts alternating current (VAC) electrical power in the cleanroom:

· One (1) each 208 volts, 3 phase, 60 Hz circuit

· on uninterruptable power supply (UPS)

Spacecraft LSSPs will list the receptacles required.

Facility Contractor
TBP
TBP, if needed
0105
Cleanroom
Power/ Electrical
Power
120 VAC electrical power within the cleanroom:

· Five (5) each 120 VAC, 1 phase, 60 Hz, 15 Amp circuits with wall receptacle National Electrical Manufacturers Association (NEMA) 5-20

· on UPS

Spacecraft LSSPs will list the receptacles required.

Facility Contractor
TBP
TBP, if needed
0110
Cleanroom
Power/ Electrical
Phase Check
Proper phasing verification for all 3-phase electrical outlets (Delta-Clockwise) with the Certificate of Facility Readiness (COFR).
Facility Contractor
TBP
TBP, if needed
0115
Cleanroom
Power/ Electrical
Conductive Floor
Static dissipative cleanroom floor.
Facility Contractor
TBP
TBP, if needed
0120
Cleanroom
Power/ Electrical
UPS
UPS for all cleanroom circuits providing power to the spacecraft or critical spacecraft electrical ground support equipment (EGSE) until a generator backup can be brought online, to allow a controlled shutdown of the spacecraft and spacecraft EGSE.
Facility Contractor
TBP
TBP, if needed
0130
Cleanroom
Power/ Electrical
Generator
Backup Power Generator for all Cleanroom circuits providing power to spacecraft or EGSE (both UPS and Non-UPS circuits), that will autostart in the event of loss of commercial power and will assume the load within less than 50% of UPS rated limit.

If autostart/autotransfer of the backup power generator is not available, the facility will provide support to manually perform these operations during all spacecraft critical operations.

Test and checkout results of the backup generator and of any autostart/autotransfer functions to be provided no later later than 3 days prior to hardware arrival.

Facility Contractor
TBP
TBP, if needed
0140
Cleanroom
Power/ Electrical
Grounding
Ground points in the cleanroom.

To the maximum extent practical, technical grounds shall be separate or shielded from facility grounds and be clearly marked “Technical Ground” or “Facility Ground”.

Facility Contractor
TBP
TBP, if needed
0142
Cleanroom
Power/

Electrical

Personnel Grounding Points
Attach points for personnel grounding to the facility technical ground.
Facility Contractor
TBP
TBP, if needed
0145
Cleanroom
Power/

Electrical

Grounding Certification
Grounding plate inspection and certifications of the ground system before arrival.

Copy of the certification to be provided with the COFR.

Facility Contractor
TBP
TBP, if needed
0200
Cleanroom
Environ
Cleanroom Cleanliness Certification
Cleanroom fully cleaned and certified to the following levels. Certification and verification data are to be provided with the COFR, when available at the time of COFR delivery. Otherwise provided 3 days prior to first hardware arrival to the cleanroom.

· Particles verified to ISO 14644-1 and ISO 14644-2 Class 8

· Non-volatile residue (NVR) levels verified by exposing NVR plates/foils for one month and analyzed to 0.5 µg/cm2/month per ASTM-E-1235.

· Verification of particulate fallout to Level 750 per IEST-STD-CC-1246E for a 24-hour period.

· Verification of hydrocarbon levels at or less than 15 ppm.

Facility cleanroom to be maintained in an operational state from the point of this certification forward through the end of spacecraft occupancy (Temp/RH and particle counts maintained at LSSP levels).

Certification of the cleanroom can be accomplished while occupied by prior tenants.

Facility Contractor
TBP
TBP, if needed
0220
Cleanroom
Environ
Clean

Room Air Supply Cleanliness Maintain cleanroom to ISO 14644-1 Class 8 for spacecraft processing.

The facility air supply shall have High Efficiency Particle Arrestor (HEPA) and molecular filters and positive pressure with respect to outside (except when prohibited due to hazardous operations).

NOTE: if this area is shared with any other hardware, including that on the same launch, the strictest environmental requirements for cleanliness will apply for the full duration.

Facility Contractor
TBP
TBP, if needed
0225
Cleanroom
Environ
Cleanliness – Airborne Particles
After initial certification, all clean work areas shall be continuously monitored for airborne particles by the use of particle counters (1.0 or 0.1 cubic feet per minute [CFM]) and monitored in accordance with ISO 14644-1 / ISO 14644-2 Class 8, using particle count size categories at ≥0.5 and ≥5.0 microns.

Provide reports of the cleanroom particulate environment to the spacecraft daily.

Facility Contractor
TBP
TBP, if needed
0230
Cleanroom
Environ
Cleanliness - Particulate Fallout
Ongoing monitoring and verification of particulate fallout levels throughout the spacecraft occupancy to Level 750 per IEST-STD-CC1246E.

Particulate fallout will be measured as percent area coverage, %AC or PAC, per IEST-STD-CC-1246E using particulate fallout collectors exposed for one month each.

Analyze 2 filters per month, staggered every two weeks, so that every two weeks one filter is removed for analysis and replaced.

Facility Contractor
TBP
TBP, if needed
0235
Cleanroom
Environ
Cleanliness-NVR
Ongoing monitoring and verification of cleanroom NVR levels throughout the spacecraft occupancy to 0.5 µg/cm2/month per ASTM-E-1234 and ASTM-E-1235.

Two (2) NVR plates/foils will be exposed for one month each. Plates will be staggered such that every two weeks one plate is removed for analysis and replaced. Each NVR plate will be analyzed per ASTM-E-1235. Provide enough plates to allow for rotation through occupancy.

Facility Contractor
TBP
TBP, if needed
0240
Cleanroom
Environ
Cleanliness - Hydrocarbons
Monitoring to verify hydrocarbon levels remain at or below 15 ppm (measured as methane gas) in the vicinity of the spacecraft throughout the spacecraft occupancy.

A portable hydrocarbon monitor, such as a photoionization detector (PID) or a sample cylinder, may be used to satisfy hydrocarbon measurements.

Facility Contractor
TBP
TBP, if needed
0250
Cleanroom
Environ
Temp
Maintain cleanroom temperature to 65 degrees Fahrenheit (°F) to 75°F (18 degrees Celsius (°C) to 24°C) with the cleanroom doors closed, once stabilized post exterior door operations, whenever spacecraft hardware or equipment is present.
Facility Contractor
TBP
TBP, if needed
0255
Cleanroom
Environ
Relative Humidity (RH)
Maintain cleanroom relative humidity to 30% to 60% (non-condensing) with the cleanroom doors closed, once stabilized post exterior door operations, whenever spacecraft hardware or equipment are present.
Facility Contractor
TBP
TBP, if needed
0260
Cleanroom
Environ
Cleanroom Monitoring and Alarms
Continuous monitoring of temperature, humidity, and particle count in the cleanroom.

Record same on intervals not to exceed 15 minutes.

Provide an immediate notification method (ALARM) per the guidelines below.

Report all alarms to the LSIM, Customer Processing Support Manager (CPSM), Launch Site Support Engineer (LSSE) or project leader/test conductor per established Project call lists within 60 minutes of an alarm.

Set up particle counter warning system threshold to 75% of the cleanliness limit.

Set up particle counter alarm system threshold to 100% of the cleanliness limit.

Facility Contractor
TBP
TBP, if needed
0270
Cleanroom
Environ
Cleanliness Reports
Cleanroom daily reports, which shall show the previous day’s hourly history for temperature, humidity, and cleanliness with details on any discrepancies from the stated requirements and the status of corrective actions.
Facility Contractor
TBP
TBP, if needed
0280
Cleanroom
Environ
Cleaning
Cleaning services for the spacecraft operational assigned areas as necessary to maintain cleanliness conditions within limits.

Additional cleaning of the floor &/or affected wall areas anytime major movements or door openings have occurred.

Electrostatic discharge (ESD) HEPA vacuuming, and mopping will be performed as required (timing to be coordinated with spacecraft), up to the limit line established around the Spacecraft and GSE.

The cleanroom floor will be vacuumed and wet-mopped by spacecraft personnel around the critical zone defined by the spacecraft.

Provide waste removal, as necessary.

Facility Contractor
TBP
TBP, if needed
0290
Cleanroom
Environ
Contamination prevention
Verification that all GSE entering the cleanroom is cleaned to a level to maintain the required environment before being brought into the cleanroom. GSE must be kept clean for the duration the equipment is located in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0300
Cleanroom
Equipment
Crane
Crane in the cleanroom, equipped with a debris/drip shield interposed between the crane and the hardware to be lifted.

Crane to be on backup power system to power the crane in the event of power loss during lifting.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Capacity/hook height:TBP
0305
Cleanroom
Equipment
Crane Certification
Crane certificate of compliance/ inspection with the COFR confirming that the cleanroom crane is in compliance with applicable safety requirements and all required inspections/maintenance have been completed (to include recorded maintenance dates).
Facility Contractor
TBP
TBP, if needed
0310
Cleanroom
Equipment
Forklift
Cleanroom compatible forklift for use in the cleanroom.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Lift Capability:TBP
0315
Cleanroom
Equipment
Pallet Jack
Cleanroom compatible pallet jack for moving equipment into the facility.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
TBP, if needed
0320
Cleanroom
Equipment
Mobile Platforms/ Ladders
Mobile platforms and ladders for spacecraft use.

Alternate access methods may be acceptable (folding or extending structural platforms, etc.).

Facility Contractor
TBP
Reach: TBP, if needed
0330
Cleanroom
Equipment
ESD Workbench
One (1) ESD workbench or a table with an ESD mat for use in cleanroom.

ESD workbench to be verified grounded and functioning properly.

Facility Contractor
TBP
TBP, if needed
0335
Cleanroom
Equipment
ESD

Wrist strap tester

Wrist strap tester in the garment change room.
Facility Contractor
TBP
TBP, if needed
0340
Cleanroom
Equipment
Facility Vacuum
One (1) facility vacuum or portable ESD HEPA vacuum for use in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0342
Cleanroom
Equipment
Shoe Cleaners
Shoe cleaner at the personnel entrance to the garment change room.
Facility Contractor
TBP
TBP, if needed
0344
Cleanroom
Equipment
Rack for Outside Garments
Garment hanging rack, outside of the garment change room, to keep jackets/outer garments exposed to dust and rain, etc., out of the changing area.
Facility Contractor
TBP
TBP, if needed
0346
Cleanroom
Equipment
Change Room Garment Storage Equipment
A minimum of fifteen (15) storage lockers or bins for project member garment storage.

Garment hanging rack.

Facility Contractor
TBP
TBP, if needed
0348
Cleanroom
Equipment
Cleaning Equipment
Cleanroom compatible supplies for use by spacecraft personnel in cleaning the cleanroom floor close into the spacecraft. Supplies to include:

· One (1) Mop

· One (1) Bucket

Facility Contractor
TBP
TBP, if needed
0350
Cleanroom
Equipment
Solvent Bottles
Six (6) 500-ml graduated Teflon solvent bottles with graduated marks and two fill funnels.
Facility Contractor
TBP
TBP, if needed
0360
Cleanroom
Equipment
Telephones
Minimum of one (1) long distance capable telephone in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0370
Cleanroom
Equipment
Chemical Storage Cabinet
One (1) chemical storage cabinet or locker in the garment change room or cleanroom to store alcohol and other approved solvents and chemicals used in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0372
Cleanroom
Equipment
Ordnance Storage

Locker Locker for storage of small ordnance.

Facility Contractor
TBP
TBP, if needed
0376
Cleanroom
Equipment
Hazardous Waste Receptacles
Receptacles for disposal of hazardous waste, as required, for approved solvents, solvent wipes and chemicals.
Facility Contractor
TBP
TBP, if needed
0380
Cleanroom
Equipment
Blast Shield
[HPF Only]

One blast shield or equivalent protection for operator’s protection against splinters or explosion during fueling and pressurization activities.

Facility Contractor
TBP
TBP, if needed
0382
Cleanroom
Equipment
Spill Containment
[HPF Only]

Cleaning supplies to support the response activities for any credible hydrazine spill, including a mop and sop kit and a drip pan.

Facility Contractor
TBP
TBP, if needed
0400
Cleanroom
Furnishings
Tables
Minimum of two (2) stainless steel cleanroom compatible tables for spacecraft use in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0410
Cleanroom
Furnishings
Chairs
Minimum of four (4) stainless steel adjustable cleanroom compatible stools/chairs for spacecraft use in the cleanroom.
Facility Contractor
TBP
TBP, if needed
0500
Cleanroom
Liquids & Gases
Isopropyl Alcohol (IPA) for GSE
Twenty (20) liters (5.3 gallons) of IPA to be used for cleaning GSE and miscellaneous spacecraft equipment.

IPA for GSE cleaning shall be >99.5% purity and <0.001% residue (e.g., American Chemical Society [ACS] or ACS Spectrophotometric grade).

Vendor certification provided at time of use.

Facility Contractor
TBP
TBP, if needed
0550
Cleanroom
Liquids & Gases
Pneumatic air for air pallets
Cleanroom compatible pneumatic air supply for use with air pallet systems.

Air supply flow rate, pressure, quality, and fitting will be in the spacecraft LSSP.

Facility Contractor
TBP
TBP, if needed
0600
Cleanroom
Non-Fluid Consumables
Cleanroom Entrance

Tacky Mats

Tacky mats at all entrances to the garment change room and cleanroom areas, replaced as necessary.
Facility Contractor
TBP
TBP, if needed
0610
Cleanroom
Non-Fluid Consumables
Cleanroom Wipes
Lint free cleanroom wipes for cleaning GSE.

One Hundred (100) wipes

Facility Contractor
TBP
TBP, if needed
0620
Cleanroom
Non-Fluid Consumables
Zip Lock Bags
Clean polyethylene zip lock bags (~25” x 14”) for garment and boot storage (booties and smocks to be stored separately).

Qty One Hundred (100)

Facility Contractor
TBP
TBP, if needed
0640
Cleanroom
Garments and Wearable Equipment
Cleanroom Body Garments
ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garments to support 40 spacecraft personnel with a twice weekly change out during spacecraft processing.

Sizes ranging from small (S) to extra, extra, extra large (XXXL) are required.

Facility Contractor
TBP
TBP, if needed
0645
Cleanroom
Garments and Wearable Equipment
Cleanroom Garment

Boots ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garment boots for 40 spacecraft personnel with a twice weekly change out during spacecraft processing.

Sizes ranging from S to XXXL are required.

Facility Contractor
TBP
TBP, if needed
0650
Cleanroom
Garments and Wearable Equipment
Cleanroom

Garment Head Covers ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garment head covers for 40 spacecraft personnel with a twice weekly change out during spacecraft processing.

Sizes ranging from S to extra large (XL) are required.

Facility Contractor
TBP
TBP, if needed
0655
Cleanroom
Garments and Wearable Equipment
Cleanroom Garment Beard Covers
ISO Class 8 compatible, silicone free, cleanroom beard covers for 40 spacecraft personnel, twice daily change out.
Facility Contractor
TBP
TBP, if needed
0660
Cleanroom
Garments and Wearable Equipment
Cleanroom

Gloves Cleanroom gloves (IEST STD-CC1246, Level 100 compliant) for 40 spacecraft personnel, twice daily change out.

Sizes ranging from S to XL are required.

Facility Contractor
TBP
TBP, if needed
0670
Cleanroom
Garments and Wearable Equipment
Cleanroom Garment Laundering
Laundry service for all cleanroom garments provided by the Facility Contractor.

Garment replenishment shall be at the rate of at least two garment sets per person per week.

Facility Contractor
TBP
TBP, if needed
0700
Cleanroom
Safety/ Security
Fire Extinguishers
Minimum two Class A/B/C fire extinguishers in the cleanroom and at least one in any adjacent annexes or bays.
Facility Contractor
TBP
TBP, if needed
0705
Cleanroom
Safety/ Security
Fire Sensors
Fire sensors/detectors in all spacecraft areas with local and remote alarms.
Facility Contractor
TBP
TBP, if needed
0710
Cleanroom
Safety/ Security
Fire Suppression
Fire suppression system in all spacecraft areas.

The cleanroom system shall be at least single fault tolerance to inadvertent activation (e.g., a “dry-pipe” system requiring a two-stage activation prior to discharging water).

Facility Contractor
TBP
TBP, if needed
0715
Cleanroom
Safety/ Security
Oxygen Monitoring
Oxygen level monitoring throughout operations involving asphyxiants or toxic chemicals.
Facility Contractor
TBP
TBP, if needed
0720
Cleanroom
Safety/ Security
Portable Hydrazine Vapor Detection
[HPF Only]

Portable hydrazine detector to alarm at 0.01 ppm while hydrazine is present in the HPF.

Facility Contractor
TBP
TBP, if needed
0721
Cleanroom
Safety/ Security
Vapor Detector Certification
[HPF Only]

Provide certification of handheld propellant vapor detectors to the 0.1 ppm hydrazine level with the COFR.

Facility Contractor
TBP
TBP, if needed
0722
Cleanroom
Safety/ Security
Hydrazine Vapor Detection
[HPF Only]

Continuous detection and alarm for hydrazine vapor detection monitoring in affected HPF work areas to the 0.01 ppm sensitivity level when hydrazine is present.

Facility Contractor
TBP
TBP, if needed
0723
Cleanroom
Safety/ Security
Vapor Detector Certification
[HPF Only]

Provide certification of fixed propellant vapor detectors to the 0.1 ppm hydrazine level with the COFR.

Facility Contractor
TBP
TBP, if needed
0724
Cleanroom
Safety/ Security
Safety Hazard Warning
[HPF Only]

Ensure the spacecraft fueling area is a safety restricted area when performing hazardous operations, indicated by flashing lights.

Facility Contractor
TBP
TBP, if needed
0730
Cleanroom
Safety/ Security
Lightning

Protection

Lightning protection for the cleanroom facility.
Facility Contractor
TBP
TBP, if needed
0732
Cleanroom
Safety/ Security
Cleanroom Facility Emergency Lighting
Emergency area lighting which will activate immediately upon power failure and illuminate until standby power can assume the normal lighting load.

This requirement applies in all areas where personnel will be working, including the change room and cleanroom.

Facility Contractor
TBP
TBP, if needed
0734
Cleanroom
Safety/ Security
Emergency Eyewash & Shower
Emergency eyewash and shower in the cleanroom or nearby in case of an accident with chemicals during processing.
Facility Contractor
TBP
TBP, if needed
0740
Cleanroom
Safety/ Security
First Aid Kits
Courtesy first aid kits in or near all areas where spacecraft personnel will be working, including the change room.
Facility Contractor
TBP
TBP, if needed
0745
Cleanroom
Safety/ Security
Emergency Breathing Apparatus
[HPF Only]

A quantity of Emergency Life Support Apparatus (ELSA), Escape Only Respirators (EOR) or equivalent units to support cleanroom operations after hydrazine has entered the facility if required by the Facility Safety Plan.

Additional 2 ELSA/EOR units per personnel lift (scissor lift or other) or platform are required to support personnel working on elevated platforms and lifts.

Spacecraft LSSPs will specify the quantity.

Facility Contractor
TBP
TBP, if needed
0750
Cleanroom
Safety/ Security
Access Control
Security system 24 hours/7 days per week to the spacecraft-occupied cleanroom that limits access to only authorized personnel and allows access 24 hours/7 days per week by the authorized spacecraft personnel.

Only personnel on an authorized access list, provided by the LSIM, will be granted unescorted access to the cleanroom.

Access control can be via swipe card, cipher code or guard.

Facility Contractor
TBP
TBP, if needed
0755
Cleanroom
Safety/ Security
Badging
Badging services, as needed, for personnel entry to the cleanroom.

Spacecraft LSSPs will list the quantity.

Facility Contractor
TBP
TBP, if needed
0760
Cleanroom
Safety/ Security
Access Logs
Daily access logs to the controlled areas, provided to LSP upon request.
Facility Contractor
TBP
TBP, if needed
0780
Cleanroom
Safety/ Security
Facility Safety Training
Facility safety training necessary for badging and operating in the cleanroom areas.

This training shall be performed ahead of or immediately upon personnel arrival at the processing facility.

Facility Contractor
TBP
TBP, if needed
0782
Cleanroom
Safety/ Security
Crane Training
Crane familiarization training for all spacecraft personnel who need to operate the cleanroom cranes.
Facility Contractor
TBP
TBP, if needed
0784
Cleanroom
Safety/ Security
Forklift/

Personnel lift Training Forklift and personnel lift familiarization training, as necessary, for spacecraft personnel to operate the processing facility provided forklifts and personnel lifts.

Facility Contractor
TBP
TBP, if needed
0786
Cleanroom
Safety/ Security
ELSA/EOR Training
[HPF Only]

ELSA, EOR, or equivalent, training for all spacecraft, LSP and LSC personnel as necessary.

Training to be available at multiple times/days to accommodate traveling team members.

Facility Contractor
TBP
TBP, if needed
0820
Cleanroom
Misc. Services and Support
Hazardous waste disposal
Hazardous waste disposal and waste management from arrival to launch plus (L+) 3 days
Facility Contractor
TBP
TBP, if needed
0825
Cleanroom
Misc. Services and Support
Decon Procedure
[HPF Only]

Decontamination procedure to be followed in the clean work area in the event of a minor or a major fuel spill.

Facility Contractor
TBP
TBP, if needed
0860
Cleanroom
Misc. Services and Support
Fire & Rescue Service
[HPF Only]

Scheduling of Fire & Rescue support on alert during scheduled hydrazine operations.

Facility Contractor
TBP
TBP, if needed
1000
Airlock
Facility/ Space
Airlock
Cleanroom airlock, or equivalent space, adjacent to any cleanroom used by the spacecraft for receiving spacecraft flight hardware and ground support equipment (GSE) with a clear transfer path to the cleanroom for the GSE and Spacecraft.

Any rooms that the spacecraft must transit through before reaching their assigned cleanroom will be treated as airlock space and must meet all LSSP airlock (1000-1999) requirements for the environment and those requirements supporting the transit of the hardware (clean compressed air, etc.).

Spacecraft LSSPs will list the area size and door size required.

Facility Contractor
TBP
Square Footage:TBP
1005
Airlock
Facility/ Space
Airlock

Door Size Airlock door sized to allow entry and exit of the spacecraft hardware.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Dimensions: TBP
1040
Airlock
Facility/ Space
Airlock Exterior Pad
Exterior pad at the airlock to stage the shipping container, clean the container, dry the container and configure for entry.

Size to accommodate a standard flatbed trailer and the equipment for cleaning and drying.

Facility Contractor
TBP
Square Footage:TBP
1100
Airlock
Power/ Electrical
Power
208 VAC electrical power the airlock:

· One (1) each 208 volts, 3 phase, 60 Hz circuit

· on uninterruptable power supply (UPS)

Spacecraft LSSPs will list the receptacles required.

Facility Contractor
TBP
TBP, if needed
1105
Airlock
Power/ Electrical
Power
120 VAC electrical power within the airlock:

· Five (5) each 120 VAC, 1 Ø, 60 Hz, 15 Amp circuits with wall receptacle NEMA 5-20

· on uninterruptable power supply (UPS)

Spacecraft LSSPs will list the receptacles required.

Facility Contractor
TBP
TBP, if needed
1110
Airlock
Power/ Electrical
Phase Check
Verification of proper phasing for all 3-phase electrical outlets (Delta-Clockwise) with the COFR.
Facility Contractor
TBP
TBP, if needed
1115
Airlock
Power/ Electrical
Conductive Floor
Static dissipative cleanroom floor.
Facility Contractor
TBP
TBP, if needed
1120
Airlock
Power/ Electrical
UPS
UPS for all airlock circuits providing power to the spacecraft or critical spacecraft EGSE until a generator backup can be brought online, to allow a controlled shutdown of the spacecraft and spacecraft EGSE.
Facility Contractor
TBP
TBP, if needed
1130
Airlock
Power/ Electrical
Generator
Backup Power Generator for all airlock circuits providing power to spacecraft or EGSE (both UPS and Non-UPS circuits), that will autostart in the event of loss of commercial power and will assume the load within less than 50% of UPS rated limit.

If autostart/autotransfer of the backup power generator is not available, the Facility Contractor will provide support to manually perform these operations during all spacecraft critical operations.

Test and checkout results of the backup generator and of any autostart/autotransfer functions to be provided no later later than 3 days prior to hardware arrival.

Facility Contractor
TBP
TBP, if needed
1140
Airlock
Power/

Electrical

Grounding
Facility grounding plate(s) for grounding the shipping container while in the Airlock and on the apron outside the Airlock.

Location of the grounding plate(s) shall allow for transition of the shipping container from the exterior apron to the Airlock without breaking the ground connection.

To the maximum extent practical, technical grounds shall be separate or shielded from facility grounds and be clearly marked “Technical Ground” or “Facility Ground”.

Spacecraft to provide grounding cable.

Facility Contractor
TBP
TBP, if needed
1142
Airlock
Power/

Electrical

Personnel Grounding Points
Attach points for personnel grounding to the facility's technical ground.
Facility Contractor
TBP
TBP, if needed
1145
Airlock
Power/

Electrical

Grounding Certification
Grounding plate inspection and certification before arrival.

Copy of the certification to be provided with the COFR.

Facility Contractor
TBP
TBP, if needed
1200
Airlock
Environ
Airlock Cleanliness Certification
Certification that the Airlock has been cleaned and certified to a minimum of ISO 14644-1 Class 8 prior to the arrival of spacecraft hardware. A certification report certifying the Airlock to ISO Class 8 requirements is required.

After the Airlock doors have been opened to the outside and then closed, the airlock will be cleaned prior to opening a spacecraft shipping container or Airlock door into the cleanroom.

A designated facility representative shall verify particle count and environmental conditions in the Airlock have returned to ISO Class 8 readings prior to opening any spacecraft shipping container or Airlock door into the cleanroom.

Certification and verification data are to be provided with the COFR, when available at the time of COFR delivery. Otherwise provided 3 days prior to hardware arrival.

Certification of the airlock can be accomplished while occupied by prior tenants.

Facility Contractor
TBP
TBP, if needed
1220
Airlock
Environ
Clean

Room Air Supply Cleanliness Maintain the airlock to ISO 14644-1 Class 8 for all periods the spacecraft is in the airlock.

The facility air supply shall have HEPA and charcoal filters and a positive pressure to the surrounding work areas (except when prohibited due to hazardous operations).

NOTE: if this area is shared with any other hardware, including that on the same launch, the strictest environmental requirements for cleanliness will apply for the full duration.

Facility Contractor
TBP
TBP, if needed
1225
Airlock
Environ
Cleanliness – Airborne Particles
After initial certification, all clean work areas shall be continuously monitored for airborne particles by the use of particle counters (1.0 or 0.1 CFM) and monitored in accordance with ISO 14644-1 / ISO 14644-2 Class 8, using particle count size categories at ≥0.5 and ≥5.0 microns.

Provide reports of the cleanroom particulate environment to the spacecraft daily when the spacecraft is in the airlock.

Excursions from Class 8 are allowed when the door to the outside is opened as long there is not any unprotected spacecraft flight hardware/GSE present. The nominal time required for the airlock to return to Class 8, after outside doors are closed, will be provided by the Facility Contractor.

Facility Contractor
TBP
TBP, if needed
1235
Airlock
Environ
Cleanliness/

NVR Certification Ongoing monitoring and verification of Airlock NVR levels throughout the spacecraft occupancy to 0.5 µg/cm2/month per ASTM-E-1234 and ASTM-E-1235.

30 days of recent measurement data delivered with the COFR, if available, or no later than 3 days prior to arrival.

Data collection will be for 3 days prior to spacecraft arrival and continue during spacecraft occupancy in the airlock.

Collection and analysis of 1 plate every 4 weeks at a maximum.

Facility Contractor
TBP
TBP, if needed
1240
Airlock
Environ
Cleanliness - Hydrocarbons
Monitoring to verify hydrocarbon levels remain at or below 15 ppm (measured as methane gas) in the vicinity of the spacecraft throughout the spacecraft occupancy in the airlock.

A portable hydrocarbon monitor, such as a photoionization detector (PID) or a sample cylinder, may be used to satisfy hydrocarbon measurements.

Facility Contractor
TBP
TBP, if needed
1250
Airlock
Environ
Temp
Maintain airlock temperature to 65°F to 75°F (18° to 24°C) with the airlock doors closed, once stabilized post exterior door operations, whenever spacecraft hardware or equipment are present.
Facility Contractor
TBP
TBP, if needed
1255
Airlock
Environ
Relative Humidity
Maintain airlock relative humidity of 30% to 60% (non-condensing) with the airlock doors closed, once stabilized post exterior door operations, whenever spacecraft hardware or equipment are present .
Facility Contractor
TBP
TBP, if needed
1260
Airlock
Environ
Alarms
Continuous monitoring of temperature, humidity, and particle count in the airlock, recording in 15-minute intervals while the spacecraft is present in the airlock.

While Flight Hardware is present in the Airlock, provide notification method (ALARM) per guidelines below.

Report all alarms to the LSIM, CPSM, or LSSE or project leader/test conductor per established Project call lists within 60 minutes of alarm.

Set up particle counter warning system threshold to 75% of the cleanliness limit.

Set up particle counter alarm system threshold to 100% of the cleanliness limit.

Facility Contractor
TBP
TBP, if needed
1280
Airlock
Environ
Airlock Cleaning
Cleaning of all airlock work areas, as necessary to maintain cleanliness conditions within limits.

Additional cleaning of the floor &/or affected wall areas anytime major movements or door openings have occurred.

Spacecraft personnel will perform cleaning within 1 meter (3.3 feet) of the spacecraft, if present.

Provide waste removal, as necessary.

Facility Contractor
TBP
TBP, if needed
1300
Airlock
Equipment
Crane
Crane in the airlock equipped with a debris/drip shield interposed between the crane and the hardware to be lifted.

Crane to be on backup power system to power the crane in the event of power loss during lifting.

Spacecraft LSSPs will list the size and specifications.

Facility Contractor
TBP
Capacity/hook height: TBP
1302
Airlock
Equipment
Crane Certification
Crane certificate of compliance/ inspection confirming that the cleanroom crane is in compliance with applicable safety requirements and all required inspections/maintenance have been completed (to include recorded maintenance dates).

Certification to be provided with the COFR.

Facility Contractor
TBP
TBP, if needed
1304
Airlock
Equipment
Airlock

Exterior Water Water source for cleaning spacecraft shipping container on the airlock apron before entering the facility and enough hose to reach the container while it is on the apron.

Facility Contractor
TBP
TBP, if needed
1306
Airlock
Equipment
Container Drying capability
Source of compressed air with sufficient filtration and enough hose to reach the container while it is on the apron, appropriate for blowing excess water (blow drying) off of the shipping container and equipment following cleaning before entering the airlock.

Alternative drying methods are acceptable.

Facility Contractor
TBP
TBP, if needed
1308
Airlock
Equipment
Exhaust Recovery System
Diesel exhaust recovery hose/system and exhaust pipe interface adapter for the container transport tractor and all diesel transport tractors when backing into the airlock if the container offload occurs inside the airlock.
Facility Contractor
TBP
TBP, if needed
1310
Airlock
Equipment
Forklift – Interior
Cleanroom compatible forklift for use inside the airlock.
Facility Contractor
TBP
Lift Capability:TBP
1312
Airlock
Equipment
Forklift - Exterior
Forklift for use outside the airlock.
Facility Contractor
TBP
Lift Capability:TBP
1315
Airlock
Equipment
Pallet Jack
Cleanroom compatible pallet jack for moving equipment into the facility.
Facility Contractor
TBP
TBP, if needed
1320
Airlock
Equipment
Ladders
Two (2) each of 12-foot (3.7 m) OSHA-approved, cleanroom compatible ladders, or equivalent scaffolding/scissor lift/access stands, that allow access up to 12 ft (3.7 m) for work on the spacecraft.
Facility Contractor
TBP
Reach:TBP
1321
Airlock
Equipment
Airlock Exterior ladders
Two (2) Occupational Safety and Health Administration (OSHA) approved ladders for use outside while cleaning the shipping container. Minimum height 10 feet.
Facility Contractor
TBP
Reach:TBP
1342
Airlock
Equipment
Shoe Cleaners
Shoe cleaner at the personnel entrance to the airlock when not entering through the cleanroom or change room.
Facility Contractor
TBP
TBP, if needed
1350
Airlock
Equipment
Solvent Bottles
Two (2) 500-ml graduated Teflon solvent bottles with graduated marks and two fill funnels. These can be shared with the cleanroom.
Facility Contractor
TBP
TBP, if needed
1360
Airlock
Equipment
Telephones
Minimum of one long distance capable telephone in the airlock.
Facility Contractor
TBP
TBP, if needed
1500
Airlock
Liquids & Gases
IPA for GSE
Twenty (20) liters (5.3 gallons) of IPA to be used for cleaning GSE and miscellaneous SC equipment.

IPA for GSE cleaning shall be >99.5% purity and <0.001% residue (e.g., ACS or ACS Spectrophotometric grade).

Vendor certification provided at time of use.

Facility Contractor
TBP
TBP, if needed
1550
Airlock
Liquids & Gases
Pneumatic Air for air pallets
Cleanroom compatible pneumatic air supply for use with air pallet system to move handling fixtures.

Air supply flow rate, pressure, quality, and fitting will be in the spacecraft LSSP.

Facility Contractor
TBP
TBP, if needed
1610
Airlock