ATTACHMENT A CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.docx

DOCX document 14 KB Posted

Attached to
P-3009, MILITARY WORKING DOG KENNEL Federal contract opportunity
Solicitation number
5871178
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains an attachment for construction and design experience project data sheets for solicitation number 5871178. The solicitation is for a P-3009 Military Working Dog Kennel project for the Department of the Navy Naval Facilities Engineering Command. The project scope includes construction of an administrative building, dog kennel, quarantine kennel, and dog training/support fenced areas at an existing site. It also involves demolition of existing kennel buildings totaling 2,703 square feet. Offerors must provide details on up to five relevant past construction projects and five design projects using the data sheet attachment to demonstrate experience. The project delivery method is design-bid-build. The response is seeking information on products, services, experience, pricing and other details to evaluate offerors for this requirement.

View the file

Other files for this federal contract opportunity

Other files attached to P-3009, MILITARY WORKING DOG KENNEL, newest first.
File Type Posted
AMENDMENT0009DOGKENNEL.pdf PDF
P3009PriceSchedule19May2022.pdf PDF
SB Factor Attachment X HISTORICAL SMALL BUSINESS.docx DOCX document
SB Factor Attachment Y - SBPCD.docx DOCX document
SBSP (FinalTemplate) Jan2021.doc DOC document
AMENDMENT 0008 DOG.pdf PDF
SB Instructions To Offerors (Section L) 14 Feb 22.docx DOCX document
AMENDMENT0007DOGKENNEL.pdf PDF
EXISTING KENNEL PHOTOS.pdf PDF
AMENDMENT 0006 DOG KENNEL.pdf PDF
AMENDMENT 0005 DOG KENNEL.pdf PDF
AMENDMENT 0004 DOG KENNEL.pdf PDF
site visit sign in sheet.pdf PDF
AMENDMENT 0002 DOG KENNEL.pdf PDF
5_FP_FA_FX_IFC_Signed.pdf PDF
0_GI-002 - SHEET INDEX AND GENERAL_Signed.pdf PDF
8_ELECT_IFC_Signed.pdf PDF
0_GI-003 Sheets (Life Safety)_Signed.pdf PDF
1_Civil_LS_IFC_Signed_Part 3.pdf PDF
6_PLUMBING_IFC_Signed.pdf PDF
1_Civil_LS_IFC_Signed_Part 1.pdf PDF
AMENDMENT 0001 DOG KENNEL.pdf PDF
10_ESS - IFC_Signed.pdf PDF
4_INT_IFC_Signed.pdf PDF
1_Civil_LS_IFC_Signed_Part 2.pdf PDF
0_GI-001 - COVER SHEET_Signed (1).pdf PDF
3_ARCH_IFC_Signed.pdf PDF
9_TECOMM_IFC_Signed.pdf PDF
7_Mech_IFC_Signed.pdf PDF
2_STRUCT_IFC_Signed.pdf PDF
MWDF_Specs_lFC.pdf PDF
ATTACHMENT G RFI Form.docx DOCX document
ATTACHMENT B Past Performance Questionnaire.doc DOC document
SOLICITATION 21R1178 DOG KENNEL.pdf PDF
ATTACHMENT C-Safety Data Sheet.docx DOCX document
ATTACHMENT F SBSP Jan2021.doc DOC document
ATTACHMENT D Historical Small Business Utilization.docx DOCX document
ATTACHMENT E Proposed Small Bus Subcontracting Commitment.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| DES #1 |_| DES #2 |_| DES #3 |_| DES #4 |_| DES #5

|_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

File details come from the government source that posted it. Updated .