9_TECOMM_IFC_Signed.pdf
PDF 2 MB Posted
- Attached to
- P-3009, MILITARY WORKING DOG KENNEL Federal contract opportunity
- Solicitation number
- 5871178
About this file
This document outlines requirements for a federal construction project. The Naval Facilities Engineering Command is soliciting bids to construct a new Military Working Dog Kennel, including an Administrative Building, Dog Kennel, Quarantine Kennel, and Dog Training areas at an existing facility. The project scope involves demolishing three existing kennel buildings totaling 2,703 square feet. The Administrative Building will house Kennel Master Offices, a Conference Room, Multi-Purpose Room, Handlers' Offices, a Sleep Room for overnight handlers, a Kitchen/Break Room, Treatment Room, and mechanical, electrical and IT/COM spaces. The Dog Kennel contains Dog Houses, Interior and Exterior Kennels, and a Food Storage/Preparation area. The Quarantine Kennel covers four Interior Kennels. Dog Training/support areas include outdoor storage, dog break areas, an optional portable explosive storage, and an obedience course. Construction is to be completed using the Design-Bid-Build project delivery method.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TELEPHONE AND DATA COMMUNICATIONS
TELEPHONE TERMINAL BOARD (TB)
TELEPHONE TERMINAL CABINET (TC)
1 DATA/ 1VOICE WALL OUTLET
2 DATA/ 1 VOICE WALL OUTLET
COMBINATION TELEPHONE AND DATA OUTLET IN COMMON FLOOR
BOX WITH ELECTRICAL OUTLET
EQUIPMENT RACK
TELECOMMUNICATIONS BONDING BUSBAR (TBB)
BUILDING ENTRANCE PROTECTION BLOCKS
BASKET CABLE TRAY
LADDER CABLE TRAY
BEPB
110 BLOCKS
COMMUNICATION SYMBOLS
2 DATA CEILING MOUNTED
TELEVISION OUTLETTV
1. ALL WORK IS NEW, UNLESS OTHERWISE NOTED (UON), AND SHALL BE INSTALLED IN
ACCORDANCE WITH THE LATEST EDITION OF THE NEC, NFPA, TIA IN EFFECT AT THE START OF
THE CONTRACT AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY
ELECTRICAL EQUIPMENT AND CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT
SYSTEM TO OTHER DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,
FUNCTIONAL ELECTRICAL CONTROL SYSTEM. FOR CLARITY, NOT ALL FINAL CONNECTION
AND/OR WIRING ARE SHOWN ON THE DRAWINGS.
2. ALL MATERIAL SHALL BE NEW AND SHALL CONFORM TO THE STANDARDS OF THE
UNDERWRITER'S LABORATORIES, INC., AND THE NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION.
3. DRAWINGS ARE DIAGRAMMATIC ONLY AND INDICATE ONLY THE GENERAL ARRANGEMENT.
SEE ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS.
4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS, ELBOWS,
JUNCTION BOXES, WIRE TROUGHS, PULL BOXES OR OTHER REQUIRED ELEMENTS FOR
PROPER INSTALLATION OF THE WORK. ALL NECESSARY MATERIALS NEEDED TO FULFILL THE
PROJECT REQUIREMENTS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
GOVERNMENT. SIZES SHALL BE PER APPLICABLE CODES.
5. COMMUNICATIONS WORK SHALL BE COORDINATED WITH ALL DISCIPLINES. COORDINATE
WITH ARCHITECTURAL, FIRE PROTECTION AND MECHANICAL CONTRACT DOCUMENTS IN
TERMS OF EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO
INSTALLATION. PROVIDE COORDINATION DRAWINGS AS SPECIFIED IN THE SPECIFICATIONS.
6. THE LOCATIONS OF OUTLETS, JUNCTION BOXES AND OTHER EQUIPMENT ARE APPROXIMATE.
COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE INTERFERENCE WITH DUCTS,
PIPES AND ALL OTHER EQUIPMENT. ADJUST MOUNTING HEIGHTS AND PROVIDE
APPROPRIATE MOUNTING HARDWARE AS REQUIRED.
7. PROVIDE GROUNDING SIZED AS PER NEC, AND AS SHOWN ON THE DRAWINGS.
8. MOUNT ALL WIRING DEVICES RECESSED ON WALL IN FINISHED AREAS AND SURFACE IN
MECHANICAL/ELECTRICAL EQUIPMENT ROOMS, UON.
9. DETERMINE ROUTING FOR WIRING AND CABLING BASED ON A COMPLETE FIELD INSPECTION
AND COORDINATION DRAWINGS. ADVISE THE COR OF AREAS THAT PRESENT ROUTING
PROBLEMS INCLUDING INACCESSIBLE CEILING AREAS OR UNUSUAL CEILING
CONSTRUCTIONS. COORDINATE ROUTING WITH COR AND OBTAIN WRITTEN APPROVAL PRIOR
TO START OF ROUTING WORK.
10. NOTIFIY THE COR IF A CONDITION PREVENTS THE INTENT OF THESE PLANS.
11. REFER TO ALL CONTRACT DOCUMENT WORK FOR POSSIBLE INTERFERENCES BEFORE BID IS
MADE. NO ALLOWANCE SHALL SUSSEQUENTLY BE MADE BY THE CONTRACTOR FOR REASON
OF THIS FAILURE TO HAVE MADE SUCH EXAMINATIONS OR OF ANY ERROR ON HIS PART.
12. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS INDICATED
OR SPECIFIED OTHERWISE. ADVISE THE COR AND OBTAIN WRITTEN DIRECTION FROM THE
COR IF CONFLICTS EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT
DOCUMENTS PRIOR TO THE START OF THE AFFECTED WORK.
13. CONDUIT SIZES LABELED FOR EACH RUN SHALL BE CONSIDERED THE SAME FOR ALL
DOWNSTREAM RUNS UNTIL THE SIZES ARE CHANGED OR TERMINATED.
14. CONTRACTOR SHALL MAKE ALL CONNECTIONS TO HVAC, AND OTHER EQUIPMENT AS
REQUIRED.
15. A COMPLETE GROUNDING SYSTEM SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE
WITH ARTICLE 250 OF THE NEC, AND AS SHOWN ON THE DRAWINGS.
16. ALL WIRING SHALL BE INSTALLED IN RGS, IMC, OR EMT, UON. EMT SHALL NOT BE USED IN OR
UNDER CONCRETE SLABS, OR IN MASONRY WALLS. USE SCHEDULE 40 PVC BELOW GRADE
WHERE NOT SUBJECT TO PHYSICAL DAMAGE OR BELOW FLOOR SLAB. MINIMUM SIZE
CONDUIT 1” UNLESS NOTED OTHERWISE.
17. ALL RACEWAYS (EXCEPT THOSE BELOW SLAB OR GRADE) SHALL BE INSTALLED PARALLEL OR
PERPENDICULAR TO BUILDING LINES.
18. ALL SPARE CONDUITS SHOULD BE CAPPED AT EACH END AND PROVIDED WITH A PULLWIRE.
19. NO WIRING DEVICES OR OUTLET BOXES SHALL BE INSTALLED BACK TO BACK ON THE SAME
WALL.
20. PENETRATIONS OF FIRE-RATED PARTITIONS, WALLS OR FLOORS, BY DATA AND
COMMUNICATION WIRING OR CABLE SHALL BE THROUGH MODULAR, RE-ENTERABLE
FIRESTOPPING DEVICE(S) CONTAINING SELF SEALING INTUMESCENT INSERTS AND MAINTAIN
AN AIR LEAKAGE RATING OF <5 CFM/SF (MEASURED AT AMBIENT AIR TEMPERATURE AND 205
DEGREES C (400 DEGREES F)) AT 0 TO 100 PERCENT VISUAL FILL PER SECTION 07 84 00.
21. ALL RACEWAYS SHALL BE CONCEALED UNLESS OTHERWISE NOTED AND THAT THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH CONCEALING
RACEWAYS AFTER (INITIAL) BLOCK CONSTRUCTION.
22. THIS SHEET IS A STANDARD SHEET. CERTAIN SYMBOLS AND ABBREVIATIONS INDICATED ON
THIS SHEET MAY NOT APPEAR ON THE DRAWINGS.
GENERAL NOTES
1 VOICE WALL OUTLET
J
T-001
D E
P A
R T
M E
N T
O
F
T
H E
A V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M S
C
M
M A
D
W
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
P
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
G
K
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
IFC SUBMISSION
09/02/2021
J
J
J
J
J
J J J
J
J
J
J
J
J
J
J
J
J
TV
T V
A B C D E
F G H J
K3
K2
K4
K5
KA
KA
KA.4
KA.4
KB
KB
KC
KC
QA QCQB
Q1
Q2
Q3
SA SB
S1
S2
S3
K
K1
K6
K3.9
KD
KD
QB.9
Q2.9
MULTI-PURPOSE
TRAINER'S OFFICE
HANDLER'S OFFICE
VEST
100A
KENNEL MASTER
SHOWER
MEN'S TOL
SHOWER
WOMEN'S TOL
JANITOR
TACK
MOTHER'S
MECHANICAL
TREATMENT
RECOVER 1
RECOVER 2
FOOD
STORAGE/PREP
K001
VEST
100B
KENNEL
K101
KENNEL
K103
KENNEL
K105
KENNEL
K107
KENNEL
K109
KENNEL
K111
KENNEL
K102
KENNEL
K104
KENNEL
K106
KENNEL
K108
KENNEL
K110
KENNEL
K112
KENNEL
K202
KENNEL
K201
ELECTRICAL
K022
JANITOR
K021
KENNEL
CIRCULATION
K200
JANITOR
K031
KENNEL
CIRCULATION
K300
KENNEL
K302
KENNEL
K301
KENNEL
CIRCULATION
K100
KENNEL
K211
KENNEL
K209
KENNEL
K207
KENNEL
K205
KENNEL
K203
KENNEL
K212
KENNEL
K210
KENNEL
K208
KENNEL
K206
KENNEL
K204
KENNEL
K304
KENNEL
K306
KENNEL
K308
KENNEL
K310
KENNEL
K312
KENNEL
K303
KENNEL
K305
KENNEL
K307
KENNEL
K309
KENNEL
K311
CIRC
B100
KENNEL
B102
KENNEL
B104
KENNEL
B101
KENNEL
B103
STORAGE
K001A
SPKLR
B105
SLEEPING
TA-50 LOCKER
KENNEL MASTER
CLO
122A
CLO
121A
SECURE RM
CORRIDOR
CONFERENCE
STORAGE
ENCLOSED
S100
ELECTRICAL
CLO
120A
CLO
119A
CONF.
IT/COMM.
CP1A-1
CP1A-2
CP1A-4
CP1A-3
CP1A-5
B E
P B
TBB
T-100
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
TV
T V
A B C D E
MULTI-PURPOSE
TRAINER'S OFFICE
HANDLER'S OFFICE
VEST
100A
KENNEL MASTER
SHOWER
MEN'S TOL
SHOWER
WOMEN'S TOL
JANITOR
TACK
MOTHER'S
MECHANICAL
TREATMENT
RECOVER 1
RECOVER 2
VEST
100B
SLEEPING
TA-50 LOCKER
KENNEL MASTER
CLO
122A
CLO
121A
SECURE RM
CORRIDOR
CONFERENCE
ELECTRICAL
CLO
120A
CLO
119A
CONF.
Cable tray 8" by 4"
Two 2" conduits
One 1.5" conduit
IT/COMM.
CP1A-1
CP1A-2
CP1A-4
CP1A-5
GENERAL SHEET NOTES
KEYPLAN
WORK KEYNOTES
CP1A-3
BLDG. A BLDG.B1
D
C
BLDG.B3
BLDG.B2
1. Elevations to be measured to the bottom of
IT/COMM.
CP1A-1
CP1A-2
CP1A-4
CP1A-5
CP1A-3
See enlarged area
1. Outlet elevation to be 46 inches from FF the outlet
2. Offset outlets on both sides of walls by six inches minimum center to center
2. Outlet elevation to be 60 inches from FF
3. Provide two four inch sleeves or conduits with firestops
B E
P B
B E
P B
TBB
TBB
3. Provide AC grade, fire rated, void free plywood backboard six inches from the finished floor
A_T-101
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
BLDG. A BLDG.B1
C
BLDG.B3
BLDG.B2
J
J
J
J
J
J
J
J
F G H J
K3
K2
K4
K5
K
K3.9
FOOD
STORAGE/PREP
K001
KENNEL
K101
KENNEL
K103
KENNEL
K105
KENNEL
K107
KENNEL
K109
KENNEL
K111
KENNEL
K102
KENNEL
K104
KENNEL
K106
KENNEL
K108
KENNEL
K110
KENNEL
K112
KENNEL
K202
KENNEL
K201
ELECTRICAL
K022
JANITOR
K021
K200
JANITOR
K031
KENNEL
K302
KENNEL
K301
KENNEL
CIRCULATION
K100
KENNEL
K203
KENNEL
K204
STORAGE
K001A
Two 2" conduits
One 1.5" conduit
One 1.5" conduit
One 1.5" conduit
GENERAL SHEET NOTES KEYPLAN WORK KEYNOTES
1. Provide sleeves or conduits with firestops
B_T-102
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
J
J
K5
KA KA.4 KB KC
K6
K3.9
KENNEL
K202
KENNEL
K201
ELECTRICAL
K022
JANITOR
K021
KENNEL
CIRCULATION
K200
KENNEL
K211
KENNEL
K209
KENNEL
K207
KENNEL
K205
KENNEL
K203
KENNEL
K212
KENNEL
K210
KENNEL
K208
KENNEL
K206
KENNEL
K204
BLDG. A BLDG.B1
D
C
BLDG.B3
BLDG.B2
GENERAL SHEET NOTES
KEYPLAN
WORK KEYNOTES
1. Provide sleeves or conduits with firestops
B_T-103
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
J
K3
K2
KA KA.4 KB KC
K1
JANITOR
K031
KENNEL
CIRCULATION
K300
KENNEL
K302
KENNEL
K301
KENNEL
K304
KENNEL
K306
KENNEL
K308
KENNEL
K310
KENNEL
K312
KENNEL
K303
KENNEL
K305
KENNEL
K307
KENNEL
K309
KENNEL
K311
STORAGE
K001A
BLDG. A BLDG.B1
D
C
BLDG.B3
BLDG.B2
GENERAL SHEET NOTES
KEYPLAN
WORK KEYNOTES
1. Provide sleeves or conduits with firestops
B_T-104
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
SA SB
S1
S2
S3
STORAGE
ENCLOSED
S100
J
J
J
QA QCQB
Q1
Q2
Q3
QB.9
Q2.9
CIRC
B100
KENNEL
B102
KENNEL
B104
KENNEL
B101
KENNEL
B103
SPKLR
B105
BLDG. A BLDG.B1
D
C
BLDG.B3
BLDG.B2
GENERAL SHEET NOTES KEYPLANWORK KEYNOTES
1. Exposed conduit must be rigid galvanized (RGC)
T-105
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
F-CONNECTOR
CATV OUTLET
TV
D1
1-INCH CONDUIT STUBBED
TO CABLE TRAY
SINGLE GANG, HIGH IMPACT
PLASTIC 2-PORT ANGLED
FACE PLATE
SINGLE GANG, HIGH IMPACT
PLASTIC 4-PORT ANGLED
FACE PLATE
V1
VOICE AND DATA OUTLET
1 INCH CONDUIT
STUBBED TO CABLE TRAY
1 INCH CONDUIT
STUBBED TO CABLE TRAY
D1
D3
DATA 1 CAT 6 BLUE
CABLE AND JACK
DATA 2 CAT 6 GREEN
CABLE AND JACK
SINGLE GANG, HIGH IMPACT
PLASTIC 2-PORT ANGLED
FACE PLATE
D2
VOICE 1 CAT 6 GRAY
CABLE AND JACK
DATA 1 CAT 6 BLUE
CABLE AND JACK
DATA 2 CAT 6 GRAY
CABLE AND JACK
SPACE
D1
V1
VOICE AND DATA OUTLET
FINISHED GRADE
3000 PSI CONCRETE OR
SAND AS APPLICABLE
4-INCH PVC
CONDUIT AS
INDICATED (TYP)
BACKFILL PER SPECIFICATION
WARNING TAPE
BASE INSTALLED AT 10'-0' INTERVALS
3 (MIN)
M
I N
M
I N
ALL DIMENSIONS ARE IN INCHES,
UNLESS OTHERWISE NOTED.
#6 POLYETHYLENE INSULATED SOLID COPPER
TRACER WIRE SECURELY TAPE TRACER WIRE
TO DUCT EVERY 10 FEET AND LOOP AROUND
DUCT EVERY 20 FEET
2-INCHES COMPACTED SAND.
COMPACT WITH FOUR OVERLAPPING
PASSES OF VIBRATING PLATE
COMPACTOR
12 INCH
MIN.
PARTITION
THREADED
ROD
OTHER
UTILITIES
LADDER
CABLE
TRAY
TYPICAL
WALL
OUTLET
METAL STRUT
5'-0" CENTERS MAX AND
WITHIN 2'-0" OF ALL
JOINTS
INSULATED GROUNDED
BUSHING WITH #6 AWG
TO CABLE TRAY (TYP)
ACCESSIBLE
CEILING
12 INCH
MIN.
1 INCH CONDUIT
STUBBED TO CABLE TRAY
SINGLE GANG, HIGH IMPACT
PLASTIC 2-PORT ANGLED
FACE PLATE
DATA 2 CAT 6 GRAY
CABLE AND JACK
V1
VOICE AND DATA OUTLET
RIGID STEEL
CONDUIT
PVC TO STEEL
ADAPTER
STEEL
PVC
10'-0"
3"
CONCRETE ENCASEMENT
FLOOR
W A
L L
N.T.S.
COMMUNICATION DUCT ENTRANCE
T-106
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
TELCO 109
25 PR
BEPB
CONDUITS
12 SMF OS2 OSP CABLE
BEPP
HDPP(D2)
WORK AREA
CMH SEE
SHEET CU100
25 PR OSP CABLE
CAT 6 (V1) CABLE
CAT 6 (V1, D1, D2, D3) CABLES
CAT 6 (V1, D3) CABLES
HDPP(D3)
HDPP(D1)
HVPP(V1)
SWITCH
BLDG. A BLDG.B1
D
C
BLDG.B3
BLDG.B2
GENERAL SHEET NOTES KEYPLANWORK KEYNOTES
CCPP
SM FIBER
T-107
D E
P A
R T
M E
T
V
Y
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: DEC 2020
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
S
Y S
T E
M
M A
S
H I N
G T
S I G
N
A
N
S T
R U
C T
I O
N
C
O R
E W
A S
H I N
G T
O N
D
C
J O
I N
T
B
A S
E
A
N D
R E
W S
C A
R
I N
G S
M
A R
Y L A
N D
M I L I T
A R
Y
W
O R
K I N
G
D
N
N E
L
PM/DM
JFH / WM
BRANCH MANAGER
CHIEF ENG/ARCH
THC
FIRE PROTECTION
JTG
1610688
| Sheets and Views |
| BLDG-P3009-1610688-14_COMM_202100623-T001 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-T 100 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-A-T101 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-B-T102 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-B-T103 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-B-T104 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-T105 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-T106 |
| LIGHTING FLOOR PLAN - ADMIN |
| BLDG-P3009-1610688-14_COMM_202100623-T107 |
| LIGHTING FLOOR PLAN - ADMIN |
File details come from the government source that posted it. Updated .