Attachment A - 26R0219 - Steam Decentralization General Requirements.pdf
PDF 340 KB Posted
- Solicitation number
- N4008526R0219
About this file
This is a Request for Proposal (RFP) for a Design-Bid-Build (DBB) construction project issued under a Multiple Award Construction Contract (MACC) indefinite delivery/indefinite quantity (IDIQ) vehicle by Naval Facilities Engineering System Command, Mid-Atlantic.
The solicitation, N4008526R0219, seeks proposals for decentralization of steam systems at Naval Health Care New England (NHCNE) in Newport, Rhode Island. The work involves removing four buildings (23A, 43, 44, and 49) from the building A6 central steam supply system and installing natural gas-fired boilers in their place. Scope includes removal of steam-to-heating hot water exchangers, replacement of domestic hot water heaters in building 23A, trenching and backfilling for gas piping installation, paving restoration, and connections to utility meters. Rhode Island Energy will provide gas line installation in prepared trenches under a separate Navy contract; the construction contractor is responsible for site work preparation and gas distribution from exterior meters through building exteriors to boilers. Controls must integrate with existing BACnet systems through Johnson Controls MetaSYS controllers. Additional work includes pouring concrete housekeeping pads, filling interior trenches, pouring concrete slabs, sealing foundation penetrations, and roof flashing repairs. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 365-calendar-day completion deadline from award date, including 15 days for bond and insurance approval, assessed at liquidated damages of $576.25 per day of delay. Proposals are due by 14 August 2026 at 2:00 PM EST via the Procurement Integrated Enterprise Environment (PIEE) system. A mandatory site visit is scheduled for 22 July 2026 at 0830 AM at Naval Health Clinic, Naval Station Newport; base access forms are due by 15 July 2026 at noon. Award will be made to the responsible offeror submitting the lowest evaluated price based on a total lump-sum price evaluation. Performance and payment bonds are required within 10 calendar days of award at a minimum of 20 percent of proposed price not to exceed $3 million. Pre-proposal inquiries must be submitted no later than 10 calendar days prior to proposal due date using the provided PPI form. The contract is subject to Davis-Bacon wage requirements (General Decision Number RI20260001 05/18/2026) and applies to seven MACC contract holders: Benaka Inc., CCI Utility and Construction Services LLC, Kunj Construction Corporation, Ocean Construction Services, PEM-Harkins Joint Venture, Tantara Corporation, and J&J Contractors Inc.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL FACILITIES ENGINEERING SYSTEM COMMAND, MID-ATLANTIC
9324 VIRGINIA AVE, BLDG Z-140, ROOM 216
NAVAL STATION NORFOLK, NORFOLK, VA 23511
POC: Stefan Nassaney, 401-841-4443, stefan.e.nassaney.civ@us.navy.mil
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE
QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR
FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE
CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW
JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
MACC GROUP: ML-C00068
SOLICITATION NUMBER: N4008526R0219
Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI
DATE OF SOLICITATION:
07 JULY 2026
NORTH AOR MACC CONTRACT HOLDERS:
N40085-21-D-0052 Benaka Inc.
7 Lawrence Street New Brunswick, New Jersey 08901 POC: C.N. Manjunath Phone: (732) 246-7060 Email: benaka@benakainc.com
N40085-21-D-0053 CCI Utility and Construction Services, LLC 111 W. 16th Avenue, Suite 402 Anchorage, AK 99501 POC: Jim Henebury Jeffrey Eaton Tim Nichols Phone: (207) 485-6701 Email: jhenebury@bbch-llc.com jeaton@bbch-llc.com Const-estimating@bbch-llc.com Const-proposals@bbch-llc.com
N40085-21-D-0054 Kunj Construction Corporation 163 B Paris Avenue Northvale, NJ 07647 POC: Neekunj Bhanderi Yatin Gajera Raghav Krish Phone: (201) 694-7617 Email: neekunjb@gmail.com Yatin@kunjcc.com Krish@kunjcc.com
N40085-21-D-0055 Ocean Construction Services 104 Aragona Boulevard, Suite 101 Virginia Beach, VA 23462 POC: Kara Laskowski Phone: (757) 200-9590 Email: bids@ocsinc.us
N40085-21-D-0056 PEM-Harkins Joint Venture 6161 Busch Boulevard, Suite 255 Columbus, OH 43229 POC: Radagodage Sumanaweera Phone: (614) 573-7299 Email: tsumanaweera@peminc.biz
N40085-21-D-0057 Tantara Corporation 54 Mason Street Worcester, MA 01610 POC: Dawn Dearborn Phone: (508) 752-5599 Email: DDearborn@tantaracorp.com mailto:stefan.e.nassaney.civ@us.navy.mil mailto:benaka@benakainc.com mailto:jhenebury@bbch-llc.com mailto:jeaton@bbch-llc.com mailto:Const-estimating@bbch-llc.com mailto:Const-proposals@bbch-llc.com mailto:neekunjb@gmail.com mailto:Yatin@kunjcc.com mailto:Krish@kunjcc.com mailto:bids@ocsinc.us mailto:tsumanaweera@peminc.biz mailto:DDearborn@tantaracorp.com
Decentralize Steam NHCNE Solicitation No.: N4008526R0219 Naval Station Newport, Newport, RI Work Order No.: 1929728
N40085-21-D-0066 J&J Contractors, Inc.
101 Billerica Avenue, Building 5, Suite 205 North Billerica, MA 01862 POC: Kamlesh Patel Phone: (978) 259-2454 Email: kamp@jjcontractor.com
GENERAL REQUIREMENTS
All terms and conditions of N4008521D0052/0053/0054/0055/0056/0057/0066 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Stefan Nassaney at stefan.e.nassaney.civ@us.navy.mil.
Amendments will be posted directly to PIEE, Sam.gov, and sent directly via email to MACC Holders. It is ultimately the responsibility of the MACC Holders to monitor SAM.gov for any updates.
NAVFAC Solicitation No.: N4008526R0219
NAVFAC Specification/Drawing: Work Order No. 1929728
Title: Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI (eProjects#1929728)
Location of the work: Naval Station Newport, Newport, Rhode Island
Description of the work:
The work includes removal of (4) facilities from the building A6 steam supply system. The (4) buildings being taken off of steam service (23A, 43, 44, and 49) shall have their steam to heating hotwater exchangers removed and natural gas boilers provided in their place. Building B23A shall also have its domestic hot water heaters replaced.
Work includes the trenching and backfilling for the installation of gas piping to each of four buildings, restoration of paving due to gas piping installation, The contractor shall be responsible for connecting to the utility meter and provide gas distribution to the installed boilers.
NATURAL GAS LINE WORK:
Summary: Provision of natural gas to the buildings getting new boilers shall be accomplished as follows:
The construction contractor to whom this specification applies shall provide all site work (excavation, trench preparation, backfill, paving,site restoration, etc.) and Rhode Island Energy (RIE) will provide the gas line/piping installation up to and including the gas meters in the prepared trenches under a separate contract with the Navy. (Note 'National Grid' shall be interpreted as 'Rhode Island Energy' in all instances in this specification and on the drawings). As such, for bidding purposes, the construction contractor shall include costs for site work required for gas line installation, but shall not include costs related to the actual pipe installation. The trench shall be prepared in accordance with specifications provided by RIE.
mailto:kamp@jjcontractor.com mailto:stefan.e.nassaney.civ@us.navy.mil
NAVFAC will assist in coordination between the construction contractor and RIE, however the construction contractor shall establish working level communication with RIE to ensure proper site coordination and scheduling. The construction contractor shall not direct RIE to perform or not perform any work. The construction contractor shall immediately bring to the attention of the Contracting Officer any and all issues with gas line installation.
The construction contractor shall be responsible for providing all natural gas piping and appurtenances from the exterior meter through the exterior wall into the building up to the boilers.
Controls for each facility shall tie into the existing BACnet through the existing Johnson Controls MetaSYS controllers. Each boiler shall have its own factory furnished controller to manage internal functions. The MetaSYS shall perform supervisory control and accept all alarms from the boilers.
Work also includes pouring concrete housekeeping pads for new equipment along with removal of some interior building trenches no longer needed. They shall be filled in and have a new concrete slab poured.
Holes in foundations where pipes are removed shall be filled in with concrete. Additionally penetrations through roofs for piping shall be reinforced and flashing and roofing repairs shall be made along with incidental related work.
Estimated Budget Amount or Price Range: In accordance with FAR 36.204(f) Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000.
Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the deadline for completion of this task order (including Bid Options, if applicable) shall be 365 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance). Consistent with FAR 52.211-10, completion of the entire work ready for use must occur prior to the aforementioned date. The time stated for completion shall include final cleanup of the premises.
Wage Determination: Department of Labor (DoL) General Decision Number: RI20260001 05/18/2026 (Attachment E) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award.
Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government for each calendar day of delay until the work is completed or accepted. See associated liquidated damages below:
Estimate Number of Days Liquidated Damages 365 calendar days from date of award $576.25
Utilities: The Contractor shall be responsible for obtaining all utilities required for construction and testing.
The Contractor shall provide these utilities at his/her expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.
Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are not required.
Government Furnished Property: There is no Government Furnished Property.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
Definitization Of Equitable Adjustments For Change Orders Under Construction Contracts: No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. The REA definitization information referenced in Navy Marine Corps Acquisition Regulation Supplement (NMCARS) 5236.211(b)(2), should not be utilized. There are no agency-specific policies and procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. This Contract contains rated order quantities certified for national defense use, and you are required to follow all the provisions of the DPAS regulation (DPAS Regulation - 15 CFR Part 700.12) only as it pertains to the rated quantities.
Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Stefan Nassaney at stefan.e.nassaney.civ@us.navy.mil no later than, ten (10) calendar days prior to proposal due date.
Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment F).
Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment by email to MACC holders.
Site Visit: All MACC holders are invited to attend the Site Visit for this project. Firms participating in the site visit will not be directly compensated for their participation.
Date: 22 July 2026 Time: 0830 AM Meeting Location: Naval Health Clinic Front Entrance on Naval Station Newport, Newport, RI
**** PLEASE BRING A HARD HAT ****
After following the necessary steps for obtaining base access, all attendees should meet at the Naval Health Clinic on base. Please refer to Attachments H, I, and J for more detailed site visit information.
Base Access Instructions: Refer to Attachments H, I, and J for Base Access.
***ALL BASE ACCESS FORMS ARE DUE NO LATER THAN NOON 15 JULY 2026.***
Site Visit Attachments:
ATTACHMENT H: NSN NHCNE SITE VISIT PROCEDURES
ATTACHMENT I: SECNAV 5512 FORM
mailto:stefan.e.nassaney.civ@us.navy.mil
ATTACHMENT J: SITE VISIT MAP
Site Visit POCs:
Stefan Nassaney, Contract Specialist, Office: 401-841-4443 Raymond Cournoyer, Project Manager, Office: 401-841-7625
Proposal Due Date: THURSDAY, 14 AUGUST 2026 AT 02:00PM EST. LATE PROPOSALS WILL BE HANDLED IN ACCORDANCE WITH FAR 15.208(b).
Proposal Submission Instructions: In response to this request for proposal, the complete proposal shall include the Price Proposal, submitted in accordance with the Basis of Evaluation and Submittal Requirements. The Offeror shall submit an electronic copy of the proposal in accordance with the instructions below by the proposal due date.
Electronic Copies: Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment E. Emailed, mailed, and hand-delivered submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
The PIEE system will record the date and time of package submittal. Upon successful receipt of the proposal through PIEE, the Offeror should receive an email confirmation. Please keep this for your records. The date and time of package receipt recorded in PIEE shall govern the timeliness of any proposal submission. Late responses will be handled in accordance with FAR 15.208(b).
Evaluation Factors for Award:
The proposed task order will be awarded to the responsible Offeror offering the best value to the Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price.
To make a determination of best value, the Government shall evaluate each Offeror on price only.
Basis of Evaluation and Submittal Requirements.
Price:
i. Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy via The Procurement Integrated Enterprise Environment (PIEE), with the solicitation submittal requirements identified below:
a. Cover page with solicitation number, solicitation title, offeror name, address, phone number, Employer Identification Number (EIN), Unique Entity Identifier (UEI) in SAM, CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and
POC email address;
b. All amendments acknowledged;
c. Price Proposal Form (Attachment D);
d. Copy of Representation and Certifications and proof of registration in System for Award
Management (SAM);
e. Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2024/2025 filing cycle; and
f. Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least twenty percent (20%) of the proposed price, but shall not exceed $3 million
The Offeror is required to submit a complete Price Proposal Form that includes completion of all line-item numbers. All required proposal documents shall be submitted in accordance with FAR 15.208.
ii. Basis of Evaluation:
The Government will evaluate price based on the total lump sum price. Analysis will be performed by one or more of the following tecniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of the proposed prices with the Independent Government Cost Estimate
(IGCE).
c. Comparison of proposed prices with available historical information.
d. Comparison of market survey results.
Evaluation:
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
ATTACHMENTS:
Attachment A - 26R0219 - Steam Decentralization General Requirements Attachment B - Decentralization_SPECIFICATION Attachment C - Decentralization_DRAWINGS Attachment D - Bid Schedule Attachment E - Wage Determination RI20260001 Attachment F - Pre-Proposal Inquiry (PPI) form Attachment G - PIEE Vendor Access Instructions Attachment H - NSN NHCNE SITE VISIT PROCEDURES Attachment I - SECNAV 5512 FORM Attachment J - SITE VISIT MAP
Attachment B - C
Specifications and Drawings
See separately attached PDF Files labeled as follows:
Specifications:
Attachment B - Decentralization_SPECIFICATION
Drawings:
Attachment C - Decentralization_DRAWINGS
Attachment D
Price Proposal Form
ATTACHMENT D: Price Proposal Form (PPF)
Attachment E
Wage Determination
"General Decision Number: RI20260001 05/18/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of Bristol, Kent, Newport, Providence and Washington
Includes Marine Construction Projects
Modification Number Publication Date 2 01/30/2026 3 05/18/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
Rates Fringes
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
Rates Fringes
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
Rates Fringes
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
Rates Fringes
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 01/01/2023
Rates Fringes
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP0330-001 06/02/2025
Rates Fringes
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP1121-002 04/21/2025
Rates Fringes
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
Rates Fringes
TELEDATA SYSTEM INSTALLER FOOTNOTES: WORK OF
A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30
FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING
OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL.
WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED
SEWER OUTFALL: 20% PER HOUR ADDITIONAL..............$ 42.09 19.71
ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.................................$ 56.11 24.74
ELEV0039-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS:
NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE
FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.
B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR
5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE
FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY
CREDIT..............................................$ 64.52 38.44
ENGI0057-001 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9 BOAT & TUG OPERATOR.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210
FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00
270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $
8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER
+ $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR.
A. BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER
+ $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND
OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET
AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS
A.
BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 6 WELL-POINT INSTALLATION CREW.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND
OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET
AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270
FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00
350 FEET AND OVER + $ 9.00 400 FEET AND OVER +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP).
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.35 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 4 OILER ON CRAWLER BACKHOE.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER
+ $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 3 OILERS ON CRANES.
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS.
A. BOOM LENGTHS, INCLUDING
JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND
OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET
AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300
FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00
400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A:
ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A.
FOOTNOTES: HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS
A. BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180
FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00
240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $
7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER
+ $ 9.00 400 FEET AND OVER + $10.00 A. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 51.30 29.95
ENGI0057-003 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 44.54 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7 WELL POINT INSTALLATION CREW
A. BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180
FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00
240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $
7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER:
+ $ 9.00 400 FT. AND OVER: + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP)
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 47.65 29.95
GROUP 5 OILER ON CRAWLER BACKHOE
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND
OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT.
AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270
FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00
350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 41.50 29.95
GROUP 4 FIREMAN & OILER ON CRANES
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE,
HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER
BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER
(3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM
TRUCK
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS.
A. BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 50.57 29.95
ENGI0057-005 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS
AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT
PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS
A. FOOTNOTE: A. ANY
EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 38.70 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6
OILERS ON CRANES AND DECKHANDS
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5
SIGNAL PERSONS
A.
FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4
UTILITY ENGINEERS
A. FOOTNOTE:
A. ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT
A. FOOTNOTE: A.
ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 46.45 29.95
IRON0037-001 09/16/2025
Rates Fringes
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
Rates Fringes
LABORER GROUP 5 (BUILDING CONSTRUCTION).............$ 39.00 26.90
LABORER GROUP 4 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 3 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 2 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 1 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABO0271-002 11/27/2022
Rates Fringes
LABORER TEST BORING LABORER.........................$ 41.95 24.15
LABORER TEST BORING DRILLER.........................$ 41.95 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW TOP MAN & LABORER...................$ 35.60 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW BOTTOM MAN..............................$ 41.50 24.15
LABORER FREE AIR GROUP 3............................$ 42.45 24.15
LABORER FREE AIR GROUP 2............................$ 45.00 24.15
LABORER FREE AIR GROUP 1............................$ 46.00 24.15
LABORER COMPRESSED AIR GROUP 3......................$ 42.45 24.15
LABORER COMPRESSED AIR GROUP 2......................$ 52.93 24.15
LABORER COMPRESSED AIR GROUP 1......................$ 55.40 24.15
PAIN0011-005 06/01/2025
Rates Fringes
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAIN0011-006 06/01/2024
Rates Fringes
GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER
HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY &
CHRISTMAS DAY.......................................$ 41.63 26.15
PAIN0011-011 06/01/2024
Rates Fringes
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
Rates Fringes
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON
FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND
WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY
OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL..........$ 44.75 29.10
PLAS0040-002 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 44.75 29.10
PLAS0040-003 01/01/2025
Rates Fringes
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
Rates Fringes
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
Rates Fringes
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
Rates Fringes
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
Rates Fringes
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
Rates Fringes
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5 FOUR- AND FIVE-AXLE EQUIPMENT
FOOTNOTES:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A
PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.
........................................$ 32.21 34.51
10 TRACTOR TRAILER
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.36 34.51
9 SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.56 34.51
8 SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS
FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A…
This is the start of the file's text. The full file is on GovTribe.