Attachment A-15 Mechanical Services-Custom CEB.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
Mechanical Systems Structural Analysis Support Services
Solicitation number
ARG-2664-05232024
Issued by

About this file

This document contains attachments related to a Request for Proposal (RFP) from the Jet Propulsion Laboratory (JPL) for Mechanical Systems Structural Analysis Support Services. The RFP seeks proposals from small businesses for technical services including design, development, and implementation of testing methods and equipment. Key details include:

The solicitation number is ARG-2664-05232024, with a NAICS code of 541330 Engineering Services. Proposals are due by July 12, 2024. The government fiscal year runs from October through September, and the RFP includes labor rate ranges, indirect rates, and sample fee calculations for the proposed work. Mandatory qualification criteria are identified, and evidence of an adequate accounting system is required. The RFP attachments provide detailed cost proposal templates for direct labor, indirect rates, travel, material, subcontracts, and other direct costs. This is a Small Business Set-Aside acquisition.

View the file

Other files

File Type Posted
RFP Addenda 3.doc DOC document
RFP Addenda 2.doc DOC document
RFP Addenda 1.doc DOC document
RFP Addenda 4.doc DOC document
4.23 Ex 1 SWO Procedure.docx DOCX document
Attachment B10.doc DOC document
Attachment A20.doc DOC document
Attachment A-17 Proposer Acct Sys and CAS info 5-17-24.xlsx XLSX spreadsheet
Attachment B-21.xlsx XLSX spreadsheet
Attachment A2.docx DOCX document
Attachment A-22 RWO 3.docx DOCX document
Attachment B5.doc DOC document
Subk ARG-2664-05232024.docx DOCX document
Attachment A-22 RWO 1.docx DOCX document
Attachment B12.docx DOCX document
Attachment A1.docx DOCX document
Attachment A14.docx DOCX document
Attachment B13.doc DOC document
2.02 rfp-ARG-2664-05232024.docx DOCX document
Attachment A21.doc DOC document
Attachment A6.doc DOC document
Attachment A-22 RWO 2.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - Labor Rate Ranges & Esc JPL RFP ARG-2664-05232024 Attachment A-15 Tab 1

Mechanical Systems Structural Analysis Support Services
Proposed Direct Labor Rate Ranges & Annual Escalation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 1 and paragraph 3.1.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Labor Categories
#Labor
CategoryCode or
Number (if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance
None or LevelFY'25 Labor Rate Range
MinimumMaximum
1$0.00$0.00
2$0.00$0.00
3$0.00$0.00
4$0.00$0.00
5$0.00$0.00
6$0.00$0.00
7$0.00$0.00
8$0.00$0.00
9$0.00$0.00
10$0.00$0.00
11$0.00$0.00
12$0.00$0.00
Proposed Annual Labor Escalation
FY'26FY'27FY'28FY'29
0.00%0.00%0.00%0.00%
SAMPLE
#TitleCode or
Number (if any)Description of Roles and ResponsibilitiesTypical Education
& ExperienceClearance
None or LevelLabor Rate Range
MinimumMaximum
1Test Engineer IIITE3Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsNone$38.00$50.00
2Test Engineer IIITE3SCHolds Security Clearance. Designs, develops, and implements testing methods and equipment. Plans and arranges the labor, schedules, and equipment required for testing and evaluating standard and special devices. Provides test area with parameters for sample testing and specifies tests to be performed. Compiles data and defines changes required in testing equipment, testing procedures, manufacturing processes, or new testing requirements. Responsible for testing all customer samples and for special tests that cannot be performed in the test area.BS + 6 yearsTop Secret$42.00$54.00
Sample Annual Labor Escalation
Subcontract Year
2345
FY'26FY'27FY'28FY'29
3.10%2.50%2.75%2.75%

Page &P of &N

Tab 2 - Indirect Rates JPL RFP ARG-2664-05232024 Attachment A-15, Tab 2

Mechanical Systems Structural Analysis Support Services
Indirect Rates for Fee Calculation
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 2 and paragraph 3.6.
2The Government fiscal year runs from October through September.
3Insert or delete rows as needed.
Indirect Rates - For use in SWO fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'25FY'26FY'27FY'28FY'29
1
2
3
4
5
6
7
8
9
SAMPLE
Indirect Rates - For use in SWO fee calculationProposed Rate
#Indirect Rate DescriptionApplication BaseFY'25FY'26FY'27FY'28FY'29
1Fringe BenefitsDirect labor54.2%55.0%53.7%55.2%55.7%
2Labor OverheadDirect labor + fringe benefits34.7%35.2%35.0%35.2%35.5%
3Material OverheadRaw material cost7.5%7.7%7.2%6.9%7.1%
4Subcontract OverheadSubcontract cost3.0%2.7%3.1%2.9%3.2%
5IT ServicesLabor hours$ 0.25$ 0.24$ 0.29$ 0.27$ 0.23
6General & AdministrativeSubtotal direct cost43.7%41.0%42.2%44.0%42.7%

Tab 3 - SWO Fee Calculation JPL RFP ARG-2664-05232024 Attachment A-15, Tab 3

Mechanical Systems Structural Analysis Support Services
SWO Fee Calculation
Sample for Information Purposes Only
Note -
Tab 3 is for information purposes. Reference RFP Volume III Cost Instructions Section 2.1 Tab 3 for required acknowledgement of compliance.
Cost ElementSWO Cost - Current RatesSWO Cost for Fee CalculationTotal Negotiated SWO
Hours/CurrentHours/Neg IndirectCost Est @Hours/Current
LaborBaseRateTotalBaseRateCurrent RatesBaseRateTotal
Data System Architect10$ 70.00$ 70010$ 70.00$ 70010$ 70.00$ 700
Data Management & Archive10$ 45.00$ 45010$ 45.00$ 45010$ 45.00$ 450
Technical Writing and Editing10$ 40.00$ 40010$ 40.00$ 40010$ 40.00$ 400
Mission & Flight System Plan10$ 65.00$ 65010$ 65.00$ 65010$ 65.00$ 650
Mission Operations10$ 55.00$ 55010$ 55.00$ 55010$ 55.00$ 550
Total Labor50$ 2,75050$ 2,75050$ 2,750

Overhead/Fringe $ 2,750 92.0% $ 2,530 $ 2,750 87.0% $ 2,393 92.0% $ 2,530

Material$ 5,000$ 5,000$ 5,000
Material Overhead$ 5,0004.3%$ 215$ 5,0004.0%$ 2004.3%$ 215
Subcontract$ 2,000$ 2,000$ 2,000
Subtotal Cost / G&A Base$ 12,495$ 12,343$ 12,495
G&A$ 12,49539.0%$ 4,873$ 12,34335.0%$ 4,32039.0%$ 4,873
Total Cost$ 17,368$ 16,663$ 17,368
FCCM - Labor$ 2,7500.68%$ 19$ 2,7500.68%$ 190.68%$ 19
FCCM - Material$ 5,0000.07%$ 4$ 5,0000.07%$ 40.07%$ 4
FCCM - G&A$ 12,4950.42%$ 52$ 12,3430.42%$ 520.42%$ 52
Total Cost + FCCM$ 17,443$ 16,738Cost at Current Rates$ 17,443
Fixed FeeN/A4.0%$ 667$ 667
Total Price**N/AN/A$ 18,110
Notes -
1 The SWO cost base for fee calculation is developed using the negotiated indirect rates. The negotiated fee percentage is applied to the total cost (excluding FCCM) resulting from the application of the negotiated indirect rates, to calculate the fee amount.

2 The current direct labor rates are assumed to fall within the negotiated direct labor rate ranges.

3 The Total Price includes the total cost based on current rates plus the fee amount that results from applying the negotiated fee percentage to the total cost (excluding FCCM) as based on the negotiated indirect rates. Note that all direct labor & FCCM cost within the fee calculation cost base reflect current rates.

Tab 4 - RWO Cost Breakdown JPL RFP ARG-2664-05232024 Attachment A-15, Tab 4

Mechanical Systems Structural Analysis Support Services
RWO Cost Element Breakdown
enter company name
Notes -
1. Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 2.1 Tab 4.
2. The rates used below shall be consistent with the FY'25 labor rate ranges proposed within Tab 1 and the FY'25 indirect rates proposed within Tab 2.
3. Insert or delete rows as needed.
Cost ElementRWO 1RWO 2RWO 3Total
Hours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmountHours/BaseRateAmount
Direct Labor
Category 10$0.00$00$0.00$00$0.00$00$0.00$0
Category 20$0.00$00$0.00$00$0.00$00$0.00$0
Category 30$0.00$00$0.00$00$0.00$00$0.00$0
Category 40$0.00$00$0.00$00$0.00$00$0.00$0
Category 50$0.00$00$0.00$00$0.00$00$0.00$0
Category 60$0.00$00$0.00$00$0.00$00$0.00$0
Category 70$0.00$00$0.00$00$0.00$00$0.00$0
Total Direct Labor0$00$00$00$0
Overhead$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Fringe Benefits$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Material$0$0$0$0
Subcontract$0$0$0$0
Travel$0$0$0$0
Other Direct Cost$0$0$0$0
Subtotal Cost$0$0$0$0
G&A$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Cost$0$0$0$0
COM - Labor$0$0$0$0
COM - Non-labor$0$0$0$0
COM - G&A$0$0$0$0
Total COM$0$0$0$0

Total Cost + COM $0 $0 $0 $0

Fee$00.0%$0$00.0%$0$00.0%$0$00.0%$0
Total Price$0$0$0$0

Tab 4-1 Travel JPL RFP ARG-2664-05232024 Attachment A-15, Tab 4-1

Mechanical Systems Structural Analysis Support Services
RWO Travel Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.2.
2Insert or delete rows as needed.
Travel Cost Detail
TripDateOriginDestinationNumber of -AirfareMileage @ $0.xx/mileLodgingM&IERental CarOther (define)Other (define)Total $

/Trip

#TravelersNightsRental CarsUnit $Total $# MilesTotal $Unit $Total $Unit $Total $Unit $Total $Unit $Total $Unit $Total $
1$0.00
2$0.00
3$0.00
4$0.00
5$0.00
6$0.00
7$0.00
8$0.00
9$0.00
10$0.00
11$0.00
12$0.00
Grand Total$0.00
TripPurpose of Travel
#
1
2
3
4
5
6
7
8
9
10
11
12

Tab 4-2 Material JPL RFP ARG-2664-05232024 Attachment A-15, Tab 4-2

Mechanical Systems Structural Analysis Support Services
RWO Material Cost Detail
enter company name
Notes:
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.3.
2"Raw Mat'l Mark-up" shall include only those mark-up amounts unique to raw material cost, e.g. material handling, freight-in, scrap, etc.
3Basis of Estimate "Source Document" includes (but is not limited to); Purchase Order (current or historical), catalog price, engineering estimate.
4Basis of Estimate "Reference" shall cite the specific Source Document, e.g. P.O. # and date, catalog publication & date, engineering estimate back-up, etc.
5Insert or delete rows as needed
Item
#Part
NumberPart
DescriptionUnit of
MeasureQuantity
RequiredMinimum
Buy/LotPurchase
QuantityCost/
UnitTotal Raw
Mat'l CostRaw Mat'lTotalLead Time
in WeeksSupplierBasis of Estimate
Mark-upMaterialSource DocumentReference
1
2
3
4
5
6
7
8
9
10
11
12
Total$ - 0$ - 0$ - 0

Tab 4-3 Subcontracts JPL RFP ARG-2664-05232024 Attachment A-15, Tab 4-3

Mechanical Systems Structural Analysis Support Services
RWO Subcontract Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.4.
2Insert or delete rows as needed.
Row
#Subcontractor
NameSubcontract
DescriptionBasis of
EstimateProposed Amount
NameDivision/LocationDescriptionTypeYear 1Year 2Year 3Total
1$0$0$0$0
2$0$0$0$0
3$0$0$0$0
4$0$0$0$0
5$0$0$0$0
6$0$0$0$0
7$0$0$0$0
Total$0$0$0$0

Tab 4-4 Other Direct Cost JPL RFP ARG-2664-05232024 Attachment A-15, Tab 4-4

Mechanical Systems Structural Analysis Support Services
RWO Other Direct Cost Detail
enter company name
Notes -
1Provide the following information in accordance with RFP Volume III Cost Instructions paragraph 3.5.
2Insert or delete rows as needed.
#ODC ItemDescriptionBasis of Estimate
1
2
3
4
5
6
7
8
9
10
11
12
RWO 1RWO 2RWO 3RWO 1
#ODC ItemQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
1$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total$0.00TotalTotalTotal$0.00
Base Period
#ODC ItemQuantityFY'25FY'26FY'27Total
1$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00
Total ODC - Base Period$0.00$0.00$0.00$0.00
Option Periods
#ODC ItemQuantityFY'28FY'29FY'30FY'31FY'32FY'33
1$0.00$0.00$0.00$0.00$0.00$0.00
2$0.00$0.00$0.00$0.00$0.00$0.00
3$0.00$0.00$0.00$0.00$0.00$0.00
4$0.00$0.00$0.00$0.00$0.00$0.00
5$0.00$0.00$0.00$0.00$0.00$0.00
6$0.00$0.00$0.00$0.00$0.00$0.00
7$0.00$0.00$0.00$0.00$0.00$0.00
8$0.00$0.00$0.00$0.00$0.00$0.00
9$0.00$0.00$0.00$0.00$0.00$0.00
10$0.00$0.00$0.00$0.00$0.00$0.00
11$0.00$0.00$0.00$0.00$0.00$0.00
12$0.00$0.00$0.00$0.00$0.00$0.00
Total ODC - Option Periods$0.00$0.00$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .