Attachment A-22 RWO 3.docx
DOCX document 94 KB Posted
- Solicitation number
- ARG-2664-05232024
About this file
This document is a Representative Work Order (RWO) for a subcontract under a federal contract opportunity. The subcontract is for a structural and thermal analysis of the optical bench assembly for an orbiting spectrometer. The key tasks include modifying the structural finite element model (FEM) to support STOP (Structural Thermal Optical Performance) analysis and jitter analysis, mapping provided thermal predictions to the FEM, performing thermoelastic and jitter analyses, and delivering the final FEMs and analysis results.
The related federal contract opportunity is for Mechanical Systems Structural Analysis Support Services, issued as a small business set-aside solicitation by the Jet Propulsion Laboratory (JPL) under contract with the National Aeronautics and Space Administration (NASA). Proposals are due by July 12, 2024, with past performance information due by June 26, 2024. The contract will be a cost-type subcontract. JPL is seeking a subcontractor to provide the required structural and thermal analysis services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Addenda 3.doc | DOC document | |
| RFP Addenda 2.doc | DOC document | |
| RFP Addenda 1.doc | DOC document | |
| RFP Addenda 4.doc | DOC document | |
| 4.23 Ex 1 SWO Procedure.docx | DOCX document | |
| Attachment B10.doc | DOC document | |
| Attachment A20.doc | DOC document | |
| Attachment A-17 Proposer Acct Sys and CAS info 5-17-24.xlsx | XLSX spreadsheet | |
| Attachment B-21.xlsx | XLSX spreadsheet | |
| Attachment A2.docx | DOCX document | |
| Attachment B5.doc | DOC document | |
| Subk ARG-2664-05232024.docx | DOCX document | |
| Attachment A-22 RWO 1.docx | DOCX document | |
| Attachment A-15 Mechanical Services-Custom CEB.xlsx | XLSX spreadsheet | |
| Attachment B12.docx | DOCX document | |
| Attachment A1.docx | DOCX document | |
| Attachment A14.docx | DOCX document | |
| Attachment B13.doc | DOC document | |
| 2.02 rfp-ARG-2664-05232024.docx | DOCX document | |
| Attachment A21.doc | DOC document | |
| Attachment A6.doc | DOC document | |
| Attachment A-22 RWO 2.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPRESENTATIVE WORK ORDER (RWO) 3
SWO INFORMATION
| Subcontract Number: |
| Action Type: |
| Choose an item. |
| Subcontract Type: |
| Cost Type |
| Proj/Task #: |
| SWO Number - Mod Number |
| Effort Type: |
| Choose an item. * |
| APO Number: |
| Labor Type: |
| Choose an item. |
| SUBCONTRACTOR INFORMATION |
| Subcontractor Name: |
| Subcontractor Address: |
| Other: |
WORK DESCRIPTION
| Work Title: |
| Orbiting Spectrometer |
| Start Date: | |
| At time of execution | End Date: |
| Click or tap to enter a date. | |
| Refer To: | |
| ☐ Below Description | |
| ☐ Attachment(s) | |
| ☐ Incremental Funding |
Work Description:
Pursuant to the Provisions of the above Subcontract, the Subcontractor is authorized to proceed with the work as follows:
Statement of Work: See below for SOW.
| Other: |
* Please fill out this section only if you chose “Level of Effort” under Effort Type.
| Previous Hours |
| Change Hours |
| New Total Hours |
| Estimated Work Hours: |
FINANCIAL SUMMARY
| Financial Categories |
| Previous Amount |
| Change Amount |
| New Amount |
| Estimated Cost |
| Fixed Fee: |
| Total Value: |
| Total Amount Allotted: |
SIGNATURE BLOCKS
| JPL Subcontracts Manager’s Name |
| JPL Subcontracts Manager’s Signature |
| Signature Date |
| Authorized Subcontractor’s Name |
| Authorized Subcontractor’s Signature |
| Signature Date |
The subject hardware is the optical bench assembly of an orbiting spectrometer. The optical bench assembly consists of an optical bench enclosure which supports a spectrometer and a cryocooler.
A high-quality CDR-level structural/thermoelastic FEM (NASTRAN format) and maps of thermal predictions (nodes and temperatures) from Thermal Desktop will be provided by JPL to the subcontractor performing this work.
A. STOP (Structural Thermal Optical Performance) analysis task:
1. Modify the structural FEM to have appropriate nodes and elements on mirror surfaces M1, M2, and M3, and LoS (line of sight) pointing error MPC (multipoint constraint) equations, to support STOP analysis and boresight tracking.
2. Map provided temperatures (from a coarsely meshed model) to FEM.
3. Perform thermoelastic analysis. Export appropriate mirror surface deformations to support SigFit and optical analysis of performance parameter effects and boresight shift. SigFit and optical analysis will be performed by JPL.
B. Jitter analysis task:
1. Modify the structural FEM to have appropriate CBE (current best estimate) basic mass (mass properties will be provided by JPL), nodes and elements on mirror surfaces, and LoS pointing error MPC equations, to support jitter analysis.
2. For the provided cryocooler exported force vs. frequency input disturbances, compare M1, M2, and M3 mirror rigid body motions and deformations, in addition to LoS pointing errors, to provided jitter budgets. Export force/moment vs. frequency data (for random analysis PSD vs. frequency and RMS values) at the optical bench support points SC1 through SC4.
C. Deliverables from the subcontractor to JPL:
1. Provide final results in Powerpoint form
2. STOP and jitter FEMs
3. Raw results data and calculations (Excel file(s), .csv file(s), or .mat MATLAB file(s))
D. Work Status
1. Subcontractor will be required to support weekly status meetings (remote participation).