The document provided is an Inspection Report Form for a Work Activity (WA) under a federal contract. The report details the inspection and maintenance work required for various tactical infrastructure (TI) assets within the CBP San Diego Sector, including roads, bridges, fencing, gates, lighting, and drainage systems. The work will be performed under an Indefinite Delivery Indefinite Quantity (IDIQ) contract with two execution tiers: Scheduled Maintenance and Unscheduled Maintenance. The contract is a small business (8(a) set-aside) with a $750,000 threshold for unscheduled work. The report captures information such as the work description, location, performance standards, costs, and approvals. The related federal contract opportunity is for CBP San Diego Sector Maintenance, solicitation number 70B01C24R00002429.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspection Report Form

Work Activity (WA) Number:Date(s):REV:0
WORK DESCRIPTION
TI Asset Description:
Asset Objective(s):
Work Category:Location:
Work Classification:Sector:
Work Subdivisions:GPS:BEGN:
W:ENDN:

W:

Prime Lead Contact:Name:Ph:Email:
SUB Lead Contact:Name:Ph:Email:
GOV Lead Contact:Name:Ph:Email:
WORK PERFORMANCE
Inspection:Frequency:
Scope of Work:

Work Standards/ QC Metrics:

Work Duration:Days: ##WAR STATUS:Initial
ACCESS
Access Issues (including any expiration dates):Access Stakeholder(s):
Stakeholder Type:
ENVIRONMENTAL
Applicable
Environmental Regulations and Sources (_):Applicable Environmental BMPs:BMP’s reviewed and implemented?Yes
Survey by Biologist if required?No
COST
Est. Labor Costs:Act. Labor Costs:Other Notes
Est. Travel Costs:Act. Travel Costs:
Est. Equip CostsAct. Equip Costs
Est. Material Costs:Act. Material Costs:
Est. Mobilization:Act. Mobilization:
Est. Other Costs:Act. Other Costs:
Est. Total Costs:Act. Total Costs:
Prime Representative:Date:
Name, SignatureDD/MM/YYYY
Subcontractor:Date:
Name, SignatureDD/MM/YYYY
Photographs
Before:

After:

&"Times New Roman,Bold"&24Work Activity Report

&"Times New Roman,Regular"&10 Contract # xxxxx &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 01/22/2024

File details come from the government source that posted it. Updated .