Attachment 9 Work Activity Report.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- CBP San Diego Sector Maintenance Federal contract opportunity
- Solicitation number
- 70B01C24R00002429
About this file
The document provided is an Inspection Report Form for a Work Activity (WA) under a federal contract. The report details the inspection and maintenance work required for various tactical infrastructure (TI) assets within the CBP San Diego Sector, including roads, bridges, fencing, gates, lighting, and drainage systems. The work will be performed under an Indefinite Delivery Indefinite Quantity (IDIQ) contract with two execution tiers: Scheduled Maintenance and Unscheduled Maintenance. The contract is a small business (8(a) set-aside) with a $750,000 threshold for unscheduled work. The report captures information such as the work description, location, performance standards, costs, and approvals. The related federal contract opportunity is for CBP San Diego Sector Maintenance, solicitation number 70B01C24R00002429.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 TI Design Standards.pdf | ||
| Attachment 1 SOW 01292024.docx | DOCX document | |
| Attachment 8b WD CA20240001 04-05-2024.pdf | ||
| 70B01C24R00002429 SDC TI Maint RFP.pdf | ||
| Attachment 6 Work Plan Development Process.pptx | PPTX presentation | |
| Attachment 5 Work Estimate Form.xlsx | XLSX spreadsheet | |
| Attachment 3 Materials-Equipment-Unit_Pricing_Sheet 02022024.xlsx | XLSX spreadsheet | |
| Attachment 4 Notional_Plan 2023_01_30.xlsx | XLSX spreadsheet | |
| Attachment 8a WD 2015-5635 rev-23 12-26-2023.pdf | ||
| Attachment 6 Work Plan Development Process.pdf | ||
| 70B01C24R00002429 SDC TI Maint - cover.pdf | ||
| Attachment 2 Line Item Summary 01222024.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Report Form
| Work Activity (WA) Number: | Date(s): | REV: | 0 |
| WORK DESCRIPTION | |||
| TI Asset Description: |
| Asset Objective(s): | ||||||
| Work Category: | Location: | |||||
| Work Classification: | Sector: | |||||
| Work Subdivisions: | GPS: | BEG | N: | |||
| W: | END | N: |
W:
| Prime Lead Contact: | Name: | Ph: | Email: | |
| SUB Lead Contact: | Name: | Ph: | Email: | |
| GOV Lead Contact: | Name: | Ph: | Email: | |
| WORK PERFORMANCE | ||||
| Inspection: | Frequency: | |||
| Scope of Work: |
Work Standards/ QC Metrics:
| Work Duration: | Days: ## | WAR STATUS: | Initial | |
| ACCESS | ||||
| Access Issues (including any expiration dates): | Access Stakeholder(s): |
| Stakeholder Type: | ||||||
| ENVIRONMENTAL | ||||||
| Applicable | ||||||
| Environmental Regulations and Sources (_): | Applicable Environmental BMPs: | BMP’s reviewed and implemented? | Yes | |||
| Survey by Biologist if required? | No |
| COST | ||
| Est. Labor Costs: | Act. Labor Costs: | Other Notes |
| Est. Travel Costs: | Act. Travel Costs: | |
| Est. Equip Costs | Act. Equip Costs | |
| Est. Material Costs: | Act. Material Costs: | |
| Est. Mobilization: | Act. Mobilization: | |
| Est. Other Costs: | Act. Other Costs: | |
| Est. Total Costs: | Act. Total Costs: |
| Prime Representative: | Date: | ||
| Name, Signature | DD/MM/YYYY | ||
| Subcontractor: | Date: | ||
| Name, Signature | DD/MM/YYYY |
| Photographs |
| Before: |
After:
&"Times New Roman,Bold"&24Work Activity Report
&"Times New Roman,Regular"&10 Contract # xxxxx &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 01/22/2024
File details come from the government source that posted it. Updated .