Attachment 9 - Total cost breakdown.pdf
PDF 84 KB Posted
- Attached to
- Consular Area Heating and Ventilation Terminal Boxes Improvements Federal contract opportunity
- Solicitation number
- 19SP5025Q0012
- Issued by
- Department of State US Embassy Madrid
About this file
This document is a detailed cost breakdown spreadsheet for the Consular Area Heating and Ventilation Terminal Boxes Improvements project at the US Embassy in Madrid. The itemized list includes multiple HVAC-related tasks across different areas such as the consular area, waiting room, main entrance, and ACS corridor. Specific scope of work involves disconnecting and reconnecting VAV boxes, redistributing conduits and diffusers, installing new VAV systems, upgrading AHU controllers to BACnet, removing and replacing ducts, installing motorized control dampers, and adding return supply grills. The spreadsheet is structured with columns for description, unit, and unit cost, though the actual cost values are not populated. The document also includes line items for waste management, safety and health, and accounts for 21% VAT, indicating this is likely a detailed pricing proposal for the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 - Specifications.pdf | ||
| Attachment 7- VAV boxes specification and equipment cut sheets sample.pdf | ||
| Attachment 5 - Drawings.pdf | ||
| Attachment 8 - BAS DIAGRAM.pdf | ||
| RFQ No. 19SP5025Q0012.pdf | ||
| Invitation letter.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description UNIT UNIT COST Area entrance consular area
PA
Disconnect the Vav boxes for spaces G07, G05 and G03 ( see drawings) from AHU2and connect to AHU3 including all the materiasl conduit, VAV , supply diffuser and test totally installed and working
Area waiting room
PA
Redistribution of new conduit and diffuser including including all the materiasl conduit, VAV , supply diffuser and test totally installed and working 1
Area Main entrance visitor
PA
Disconnect the Vav boxes for spaces G07, G05 and G03 from AHU2and connect to AHU3 including all the materiasl conduit, VAV , supply diffuser and test totally installed and working
Area ACS
PA
Remove VAV serving ACS offices and install 3 new VAVs, connecting VAVs to existing duct including all the materiasl conduit, VAV , supply diffuser and test totally installed and working 1
Main conduit ACS CORRIDOR
PA
Remove conduit parallel to ACS windows and replace the 3 conduits diameter 350mm to one 600-500-400-350 INCLUDING DISSASEMBLY MATERIAL AND NEW MATERIAL. Connection to existing VAV must be include per attachment and drawings
BAS SYSTEM
PA
upgrade the existing AHU controllers to BACnet controllers to manage designated VAV box controllers and modification including pogramming 1
Return duct
PA
Removal of all return duct to install a bell mount with MD connected top DP sensor. 1
Supply duct
PA Removal of all supply duct to install new conduit 1
Dampers
PA
Install two motorized control dampers connected to 1 differential pressure sensor DP sensor to maintain pressurization between PAA and
GWA. 1
CAP
PA Remove and cap the return 1
Grills PA Install return supply grills for plenum 1
PA WASTE MANAGEMENT 1
PA SAFETY AND HEALTH 1
21% VAT
TOTAL COST VAT INCLUDED
EXTENDED
COST
Sheet1
File details come from the government source that posted it. Updated .