Attachment 9 General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
K059--626A4-18-204 Upgrade Energy Management System
Solicitation number
36C24924B0009
Issued by

About this file

This statement of work outlines requirements for an energy management system and building automation system controls upgrade project at the Tennessee Valley Healthcare System Alvin C. York Campus. The scope of work includes replacing existing Siemens and Alerton controls panels with new native BACnet panels, upgrading the direct digital control system to a Desigo CC or equivalent system, installing a new fiber optic backbone network, and integrating all new and existing control points and systems onto the upgraded platform. The contractor must complete all work within 365 calendar days of notice to proceed, including submittals, material lead times, inspection, and closeout. The solicitation will result in a single award contract. The statement of work specifies tasks, deliverables, reporting requirements, experience qualifications for contractor personnel, and other contractual provisions for the controls upgrade project at the medical center facility.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage.
General Condition DescriptionValue
Superintendent$ - 0
Project Manager$ - 0
Field Office Engineer$ - 0
Builder's Risk Insurance$ - 0
Other Project Specific Liability Insurance$ - 0
Site Maintenance and Protection$ - 0
Progress Photos (per contract specifications)$ - 0
Dumpsters$ - 0
Office Trailer$ - 0
Storage Trailer/POD/CONEX$ - 0
Telephone (Cell and/or Landline)$ - 0
Signage (per contract specifications and/or drawings)$ - 0
Travel (must comply with Federal Travel Regulations)$ - 0
Lodging (must comply with Federal Travel Regulations)$ - 0
Record Document Preparation$ - 0
As-builts (per contract specifications)$ - 0
Weather Protection (per contract specifications)$ - 0
Infection Control (per contract specifications)$ - 0
Information Technology (Internet, etc.)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0

File details come from the government source that posted it. Updated .