Attachment 7 Calculation of Contractor Self Performed Work.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
K059--626A4-18-204 Upgrade Energy Management System
Solicitation number
36C24924B0009
Issued by

About this file

This statement of work outlines requirements for upgrading an energy management system and building automation system at a Veterans Affairs medical center. The contractor will provide construction services to convert direct digital controls systems to an open, native BACnet system using a Desigo CC or equivalent front-end. Key requirements include installing a fiber optic backbone to all control panels, replacing non-compliant devices with BACnet-compatible models, integrating existing field devices, and programming the systems to function as a unified control network. The contractor must complete all work within 365 calendar days of the notice to proceed. The bid includes a base item for the full scope and an alternate deduct for excluding some future panels, fiber, and cabling. The contractor must schedule shutdowns in advance, perform much of the work after hours to minimize disruption, and coordinate all activities with the contracting officer's representative.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for Contractors (NAICS code 238210) must provide
at least 25 percent (Special Trade) of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .