Attachment 8 Price Breakout Schedule.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- 36C24924B0009
About this file
This statement of work outlines requirements for an energy management system upgrade project at the Tennessee Valley Healthcare System Alvin C. York Campus. The contractor will upgrade the existing building automation system from V-LAN to a fiber optic backbone, replace legacy control panels with native BACnet panels, integrate non-BACnet devices, and provide a new front-end system to operate as a unified and open system. Key requirements include installing new fiber optic cabling to all fan rooms, replacing listed control panels, providing programming to convert existing objects and services to BACnet, developing custom graphics, and certifying the fully functional system within 365 calendar days of notice to proceed. The bid items consist of all work as indicated in the documents under Item 1, and all work minus future panels, fiber, and cabling under Alternate Deduct 1.
The contractor must have qualified personnel, coordinate all work, and follow safety and infection control protocols. Submittals are required within five days of notice to proceed, and the contractor will provide daily reports and coordinate any necessary shutdowns. Payment will be based on installed equipment counts. The statement of work establishes project objectives, specific tasks, and reporting requirements for the energy management system upgrade at the Tennessee Valley Healthcare System campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24924B0009 0004.pdf | ||
| 36C24924B0009 0003.pdf | ||
| 36C24924B0009 0002.pdf | ||
| 36C24924B0009 0001.pdf | ||
| Attachment 12 WD Rutherford County Building TN20230187 dated 01052024.pdf | ||
| Attachment 6 Contractor Safety and Environmental Record Evaluation Form.docx | DOCX document | |
| 36C24924B0009_1.docx | DOCX document | |
| Attachment 5 Drawings Bldg 15-120 and Fisher House.pdf | ||
| Attachment 2 Bid Item Panel Upgrade List.xlsx | XLSX spreadsheet | |
| Attachment 1 Panel Upgrade List.xlsx | XLSX spreadsheet | |
| Attachment 3 Specification 2020-10-02 FINAL.pdf | ||
| Attachment 4 Drawings Cover Page Site Controls Bldg 1-11.pdf | ||
| Attachment 7 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 11 RFI Form.docx | DOCX document | |
| Attachment 10 TAX ID UEI Document.docx | DOCX document | |
| Attachment 9 General Conditions Breakout.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer-Breakdown
| JOB NAME: Location: | Solicitation Number | Project Number - | Proposal Date - | |||
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| 01 00 00 | GENERAL REQUIREMENTS | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 35 26 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 42 19 | Reference Standards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 45 29 | Testing Laboratory Services | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 58 16 | Temporary Interior Signage | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 74 19 | Construction Waste Mangement | $0.00 | $0.00 | $0.00 | $0.00 | |
| 01 81 13 | Sustainable Construction Requirements | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 5 | METALS | $0.00 | ||||
| 05 40 00 | Cold-Fomred Metal Framing | $0.00 | $0.00 | $ - 0 | $0.00 | |
| DIVISION 6 | WOOD, PLASTICS, AND COMPOSITES | $0.00 | ||||
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants |
| DIVISION 8 | OPENINGS | $0.00 | ||||
| 08 11 13 | Hollow Metal Doors and Frames | $0.00 | $0.00 | $0.00 | $0.00 | |
| 08 14 00 | Interior Wood Doors | $0.00 | $0.00 | $0.00 | $0.00 | |
| 08 41 13 | Aluminum-Framed Entrances and Storefronts | $0.00 | $0.00 | $0.00 | $0.00 | |
| 08 71 00 | Door hardware | $0.00 | $0.00 | $0.00 | $0.00 | |
| 08 71 13 | Automatic Door Operators | $0.00 | $0.00 | $0.00 | $0.00 | |
| 08 80 00 | Glazing | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 05 16 | Subsurface Preparation for Floor Finishes | $0.00 | $0.00 | 0.00 | $0.00 | |
| 09 22 16 | Non-Structural Metal Framing | $0.00 | $0.00 | 0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 30 13 | Ceramic/Porcelain Tiling | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 54 23 | Linear Metal Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 13 | Resilient Base and Accessories | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 66 16 | Terrazzo Floor Tile | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 72 16 | Vinyl Coated Fabric Wall Covering | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 72 31 | Polyporpylene Fabric Wall Covering | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 84 33 | Sound-Absorbing Wall Units | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |||
| DIVISION 10 | SPECIALTIES | $0.00 | ||||
| 10 14 00 | Signage | $0.00 | $0.00 | $0.00 | $0.00 | |
| 10 26 00 | Wall and Door Protection | $0.00 | $0.00 | $0.00 | $0.00 | |
| 10 28 00 | Toilet, Bath and Laundry Accessories | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 12 | FURNISHINGS | $0.00 | ||||
| 12 32 00 | Manufactured Wood Casework | $0.00 | $0.00 | $0.00 | $0.00 | |
| 12 36 00 | Countertops | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |||
| DIVISION 22 | PLUMBING | $0.00 | ||||
| 22 05 11 | Common Work Results for Plumbing | |||||
| 22 40 00 | Plumbing Fixtures |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | ERROR:#REF! |
| 23 37 00 | Air Outlets and Inlets | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirements for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway and Boxes for Electrical Systems | |
| 26 27 26 | Wiring Devices | |
| 26 51 00 | interior Lighting | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 33 | Raceways and Boxes for Communications Systems | |
| 27 15 00 | Communications Structured Cabling | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 |
| 28 05 00 | Common Work Results for Electroinc Safety and Security | |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | |
| 28 05 28.33 | Conduits and Backboxes for Electronic Safety and Security | |
| 28 31 00 | Fire Detection and Alarms | |
| $0.00 |
$0.00
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $0
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. |
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
Deduct Alternate 1
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $0.00 | ||||
| 10 14 00 | Signage | $0.00 | $0.00 | 0.00 | $0.00 | |
| 10 26 00 | Wall and Door Protection | $0.00 | $0.00 | 0.00 | $0.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | Electric Traction Passenger Elevators P1-P4 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 20 | Electric Traction Passenger Elevators P7-P9 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 30 | Electric Traction Service Elevators S5-S6 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 90 | Passenger Elevators Data Connection P10-P12 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $0.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $0.00
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
| TOTAL EQUIPMENT | $0.00 | |
| $0.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $0 |
| TAX FOR MATERIALS | $0 |
SUBTOTAL $0
| OVERHEAD | 0% | $0 |
| PROFIT | 0% | $0 |
SUBTOTAL $0
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $0
| Deduct Alternate 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. |
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold" &"-,Bold"
FFP Per Item
| Base Bid Item 1 | Description | Firm Fixed Price |
| $0.00 |
Alt Ded 1 $0.00
File details come from the government source that posted it. Updated .