Attachment 11 RFI Form.docx
DOCX document 16 KB Posted
- Solicitation number
- 36C24924B0009
About this file
This statement of work outlines requirements for an energy management system upgrade project at the Tennessee Valley Healthcare System Alvin C. York Campus. The selected contractor will replace the existing direct digital control system with a new native BACnet system using a Desigo CC or equivalent front-end. Key requirements include installing a fiber optic backbone to all control panels, replacing outdated control panels and components, integrating existing non-BACnet devices, and providing programming and graphics. The contractor must complete all work within 365 calendar days of the notice to proceed. The bid includes two items, with the second being an alternate deduct that removes certain future panels, fiber optic cable, and cabling from the scope of work. The contractor will be responsible for supervision, coordination, materials, testing, training, warranties, documentation and ensuring the new system is fully functional when completed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24924B0009 0004.pdf | ||
| 36C24924B0009 0003.pdf | ||
| 36C24924B0009 0002.pdf | ||
| 36C24924B0009 0001.pdf | ||
| Attachment 12 WD Rutherford County Building TN20230187 dated 01052024.pdf | ||
| Attachment 6 Contractor Safety and Environmental Record Evaluation Form.docx | DOCX document | |
| 36C24924B0009_1.docx | DOCX document | |
| Attachment 8 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Attachment 5 Drawings Bldg 15-120 and Fisher House.pdf | ||
| Attachment 2 Bid Item Panel Upgrade List.xlsx | XLSX spreadsheet | |
| Attachment 1 Panel Upgrade List.xlsx | XLSX spreadsheet | |
| Attachment 3 Specification 2020-10-02 FINAL.pdf | ||
| Attachment 4 Drawings Cover Page Site Controls Bldg 1-11.pdf | ||
| Attachment 7 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 10 TAX ID UEI Document.docx | DOCX document | |
| Attachment 9 General Conditions Breakout.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
PROJECT NUMBER:
Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE:
PROJECT LOCATION:
SUBMITTED BY:
City/State:
PHONE NO.:
TO:
Jeannette Morphew, Contracting Officer jeannette.morphew@va.gov and
Jen Jamieson, Contract Specialist jen.jamieson@va.gov
| RFI NO.: |
| DATE: |
| SPEC/DWG. REFERENCE: |
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
REPLY FROM:
DATE:
ATTACHMENTS:
COPY TO:
File details come from the government source that posted it. Updated .