Attachment 4 Drawings Cover Page Site Controls Bldg 1-11.pdf

PDF 54 MB Posted

Attached to
K059--626A4-18-204 Upgrade Energy Management System
Solicitation number
36C24924B0009
Issued by

About this file

This statement of work outlines requirements for upgrading an energy management system and building automation system at a Veterans Affairs medical center. The contractor will provide construction services to replace outdated direct digital controls with a new native BACnet system using a Desigo CC or equivalent front-end. Key requirements include installing a fiber optic backbone to all control panels, replacing control panels and integrating existing field devices, converting non-BACnet devices to BACnet, and programming the new system. The contractor must complete all work within 365 calendar days of the notice to proceed. The bid includes a base item for all work and an alternate deduct for excluding some future panels, fiber optic cable, and cabling.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .