Attachment 9 Contractors Daily Log of Construction.pdf

PDF 165 KB Posted

Attached to
Danville National Cemetery – National Shrine Project 809-NSP25-006
Solicitation number
36C78626B0009
Issued by

About this file

This document is a template for a Contractor's Daily Log of Construction with an Inspector Quality Assurance Report (Q.A.R.) used to track construction project activities and progress. The form is designated as Attachment 9 and is designed for use by contractors to document daily construction operations.

The template captures essential project identification information including contract number, project title, location, contractor details, site manager information, and contracting officer/Contracting Officer Representative (COR) contact information. The form requires daily documentation of weather conditions (temperature, precipitation, visibility, wind speed), weather-related delays affecting critical path activities, and workforce composition across various trades and management positions. The contractor must record equipment on site, materials delivered, project comments, deficiencies, potential causes for delay, and testing/observation results. Work accomplished is organized by Construction Specifications Institute (CSI) divisions including Division 1 (General Conditions—shop drawings and testing laboratory services), Division 2 (Existing Conditions—site surveying), Division 31 (Earthwork), and Division 32 (Exterior Improvements—flat marker support systems, headstone setting, turf renovation). The form includes sections for weekly progress meetings requiring site manager signature and supervisor initials with dates, and a space for project photographs. This is a blank template requiring completion by contractor personnel during daily construction operations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

CONTRACTOR’S DAILY LOG OF CONSTRUCTION

INSPECTOR QUALITY

ASSURANCE REPORT (Q.A.R.)

DAILY LOG OF CONSTRUCTION

REPORT NUMBER: 01

Project Completion at 00 %

DATE:

CONTRACT NUMBER:

Project Title:

Location:

Contractor:

Name:

Address:

Phone:

Contractor’s Site Manager:

Name:

Address:

Phone:

Contracting Officer:

COR:

Midwest District Project Managers:

WEATHER CONDITIONS:

Temperature:

Max: ° Min: °

Precipitation:

(24hour total)

Visibility:

Miles:

Wind Speed:

mph

WEATHER RELATED DELAYS:

(Affected 50% or more of critical path?)

YES OR NO

OFFICIAL WEATHER DELAY DATES:

WORK FORCE-CONTRACTORS & SUB-CONTRACTORS:

TRADE: # TRADE: # TRADE: #

Project Manager Site Manager QC manager PM assistant Field Admin- Misc. Laborers Field Engineer Construction Mgr.

VISITORS: COMPANY:

EQUIPMENT ON SITE:

1.

2.

3.

4.

5.

6.

MATERIALS DELIVERED TO JOB SITE:

PROJECT COMMENTS:

DEFICIENCIES:

POTENTIAL CAUSES FOR DELAY:

TESTS AND OBSERVATION:

WORK ACCOMPLISHED / PREP. MEETINGS CONDUCTED TODAY:

DIVISION 1: GENERAL CONDITIONS

01 33 23 - Shop Drawings, Product Data, and Samples

01 45 29 - Testing Laboratory Services

DIVISION 2: EXISTING CONDITIONS

02 21 00 – Site Surveying

DIVISION 31: EARTHWORK

31 00 00 - Earthwork

DIVISION 32: EXTERIOR

IMPROVEMENTS

32 39 20 - Flat Marker Support System, Headstone Setting, Alignment, Backfilling, and Headstone Cleaning

32 92 24 – Turf Renovation

WEEKLY PROGRESS MEETINGS:

Site Manager’s Signature: Date Supervisors Initials: Date

PHOTOS:

File details come from the government source that posted it. Updated .