Attachment 2 Work Summary Progress Report Flats.pdf
PDF 242 KB Posted
- Solicitation number
- 36C78626B0009
About this file
This is a Work Summary & Progress Report template for the National Shrine Project, specifically for flat marker raise and realignment services at cemetery locations.
The form is designed for contractors to document completion of work under Options 2, 3, 4, and 5 of the contract. Required reporting elements include: (1) Compaction Testing—total number of tests and cemetery sections; (2) Flat Granite Marker Setting, Alignment & Backfill onto Headstone Support System—total number of markers and locations; (3) Soil Compaction Testing—test quantities and sections; (4) Base Compaction Testing—test quantities and sections; (5) R&R Flat Marker Headstones—total markers and sections; (6) Clean Flat Markers—markers cleaned and sections; (7) Agricultural Soil Testing and Recommendations—test quantities and sections; and (8) Turf Renovation—total square footage and sections. The form explicitly states it is not to be used as an invoice and includes a section for contractors to report circumstances adversely affecting work progress, such as weather, turf conditions, strikes, or government delays. Both the contractor and the Cemetery Director/Contracting Officer Representative (COR) must sign and date the form to confirm service completion and receipt of the progress report, with instructions to duplicate the form as necessary for multiple reporting periods.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
WORK SUMMARY & PROGRESS REPORT
FLAT MARKER RAISE & REALIGNMENT
WORK SUMMARY & PROGRESS REPORT Period Covered:
From: To:
Cemetery Location: Contractor:
Project Title:
National Shrine Project
Flat Marker Raise and Re-alignment
Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—
1. Within a reasonable time after the defect was discovered or should have been discovered; and
2. Before any substantial change occurs in the condition of the item unless the change is due to the defect in the item.
Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)
OPTIONS 2, 3, 4 and 5
1. Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
2.
Flat Granite Marker Setting, Alignment & Backfill onto Headstone Support System
Total # Flat Markers: ► _________/ EA
Cemetery Section(s) ► ____________
3. Soil Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
4. Base Compaction Testing
Total number of compaction tests ► _________/ EA
Cemetery Section(s) ► __________
5. R&R Flat Marker Headstones
Total # Flat Markers: ► _________/ EA
Cemetery Section(s) ► ____________
6. Clean Flat Markers
Markers cleaned ► ___________/ EA
Cemetery Section(s) ► ___________
7. Agricultural Soil Testing and Recommendations
Total number of soil tests ► _________/ EA
Cemetery Section(s) ► __________
8. Turf Renovation
Total Square Feet of Turf Area. ► ___________ SF
Cemetery Section(s): ► ____________
Report below any circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.
Signature of Contractor: Date Signed
Signature of Cemetery Director /
COR
Date Signed
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.
Duplicate Form as Necessary