Attachment 8c_Sample Mock Project_Vinyl Tile.docx
DOCX document 17 KB Posted
- Attached to
- Tinker AFB Flooring Blanket Purchase Agreement Federal contract opportunity
- Solicitation number
- FA8136-25-Q-0003
About this file
This is a sample mock project scope of work for replacing approximately 500 square feet of vinyl tile flooring in Building 1's Customer Service Office at Tinker Air Force Base, Oklahoma. The work requires removing existing vinyl tile, preparing the concrete substrate, installing new 24" x 24" Tier I authorized vinyl tile, and installing new 4" rubber cove base. The contractor must provide all tools, labor, equipment, instruments, demolition, transportation, and materials necessary for the project.
The scope includes specific requirements for floor preparation (scraping, brooming, vacuuming), proper substrate preparation including repair of defects, installation according to manufacturer specifications with precise tile alignment and fitting requirements, and proper disposal of removed materials off-base. The work must be phased and can be performed during and after normal duty hours. This mock project is part of a larger Blanket Purchase Agreement solicitation (FA8136-25-Q-0003) for flooring services at Tinker AFB, intended to help vendors demonstrate pricing methodology for small projects.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001_30Jan25.pdf | ||
| Attachment 2_TAFB Facility Standard.pdf | ||
| Attachment 5_TAFB Map.pdf | ||
| Attachment 7_Performance Work Statement_7Jan25.pdf | ||
| Attachment 8a_Sample Mock Project_Carpet.docx | DOCX document | |
| Attachment 4_General Safety Requirements.pdf | ||
| Attachment 3_TAFB Electrical Standard.pdf | ||
| Attachment 8b_Sample Mock Project_Ceramic Tile.docx | DOCX document | |
| Attachment 6_USAF Carpet II Program Ordering Guide.pdf | ||
| Attachment 9_Vendor Pricing List.xlsx | XLSX spreadsheet | |
| Attachment 1_Provisions and Clauses.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Replace Vinyl Tile Building 1
(WT #121757)
XX XXX 20XX
1. DESCRIPTION OF SERVICES:
1.1 The Contractor shall furnish all tools, labor, equipment, instruments, demolition, transportation and all materials necessary to replace flooring materials in the Customer Service Office at building 1 at Tinker AFB Oklahoma. All work shall be in accordance with (IAW) the Performance Work Statement dated XX XXX 20XX, The USAF Mandatory Carpet Program, Industry Standards, and TAFB Standards.
1.2 The work shall mean to remove approximately 500 square feet (SF) of vinyl tile and replace with Tier I authorized 24” x 24” vinyl tile for the workspace. The Contractor shall be responsible for field verification to verify measurements IAW PWS 1.3.1
1.3 The work shall include delivery, storage, handling, freight, installation, adhesives, mortar, and grout.
1.4 There is a phasing requirement for this work.
1.5 Work shall be accomplished during and after normal duty hours.
2. DESCRIPTION OF WORK:
2.1 Contractor Shall:
(a) Remove existing vinyl tile and dispose of off base in accordance with all applicable Federal and State laws and regulations. Existing concrete floor shall be scraped, broomed and vacuumed clean of any debris prior to installing new vinyl IAW PWS 1.3.2.
(b) Install flooring over properly prepared substrates that are suitable for the specific product and installation method selected. All defects such as cracks, holes and flooring irregularities shall be adequately repaired to ensure a smooth, finished appearance and prevent accelerated wear IAW PWS 1.3.3.
(c) Install flooring with adhesive in accordance with the manufacturer’s installation instructions. Tile lines and joints shall be kept square, symmetrical, tight, and even. Edge width shall vary as necessary to maintain full-size tile in the field, but not edge tile shall be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Contractor shall cut flooring and neatly fit around, all permanent fixtures, built-in furniture and cabinets, pipes and outlets. Edge tile shall be cut, fitted, and scribed to walls and partitions after field flooring has been applied IAW PWS 1.6.1.
(d) Install new 4” rubber cove base IAW PWS 1.3.3.1. and 1.3.3.2.
3. POC: XXXX XXXXX, XXX-3301
File details come from the government source that posted it. Updated .