Attachment 9_Vendor Pricing List.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- Tinker AFB Flooring Blanket Purchase Agreement Federal contract opportunity
- Solicitation number
- FA8136-25-Q-0003
About this file
This is a vendor pricing template spreadsheet for a flooring services BPA at Tinker Air Force Base, accompanied by a basic Statement of Work template. The pricing sheet breaks down costs into three main CLINs: CLIN 0001 for flooring materials (including carpet, vinyl tile, ceramic/porcelain tile, and accessory items), CLIN 0002 for adhesive costs, and CLIN 0003 for installation labor costs including furniture moving, floor removal, and miscellaneous services.
The template includes standard unit pricing fields for various flooring types measured in square yards or linear feet, with specific line items for accessories like edge stripping, base molding, stair treads, and installation services for both regular work hours (WH) and after hours (AH). The accompanying SOW template is a basic framework that includes standard sections for job description, work included, hours of work, coordination requirements, and cleanup specifications, but contains no specific project details as it is meant to be customized for individual task orders.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001_30Jan25.pdf | ||
| Attachment 8c_Sample Mock Project_Vinyl Tile.docx | DOCX document | |
| Attachment 6_USAF Carpet II Program Ordering Guide.pdf | ||
| Attachment 1_Provisions and Clauses.pdf | ||
| Attachment 2_TAFB Facility Standard.pdf | ||
| Attachment 5_TAFB Map.pdf | ||
| Attachment 7_Performance Work Statement_7Jan25.pdf | ||
| Attachment 8a_Sample Mock Project_Carpet.docx | DOCX document | |
| Attachment 4_General Safety Requirements.pdf | ||
| Attachment 3_TAFB Electrical Standard.pdf | ||
| Attachment 8b_Sample Mock Project_Ceramic Tile.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Template
Worksheet
| Floor Pricing Sheet | ||||||
| CLIN 0001 | Flooring Cost | Estimated Measure | Unit | Price | Estimated Total | |
| Carpet *Refer to the Carpet Homepage for pricing input in column E https://usaf.dps.mil/sites/aficc/afcc/aficc/affcc/sitecollectiondocuments/carpet/carpethomepage.aspx | SY | $0.00 | ||||
| Vinyl Tile | SY | $0.00 | Not to Exceed Pricing | |||
| Sheet Vinyl | SY | $0.00 | Not to Exceed Pricing | |||
| Luxury Vinyl Tile | SY | $0.00 | Not to Exceed Pricing | |||
| Ceramic/Porcelain | SY | $0.00 | Not to Exceed Pricing | |||
| Accessory Items-Furnish and install | ||||||
| 0001-AA | a) Metal edge stripping/reducer/transition strip: | LF | $0.00 | |||
| 0001-AB | b) Vinyl edge stripping/reducer/transition strip: | LF | $0.00 | |||
| Base Molding Items-Furnish and install | ||||||
| 0001-AC | c) Rubber cove base, 4 in: | LF | $0.00 | |||
| 0001-AD | d) Rubber cove base, 6 in: | LF | $0.00 | |||
| 0001-AE | e) Remove base molding any size, rubber, vinyl: | LF | $0.00 | |||
| 0001-AF | f) Remove base molding any size, wood: | LF | $0.00 | |||
| 0001-AG | g) Self Coving (Flash Coving) | LF | ||||
| 0001-AH | h) Flash cap | LF | $0.00 | |||
| 0001-AI | i) Filet strip | LF | $0.00 | |||
| Stair Tread and Riser Items-Furnish and install | ||||||
| 0001-AJ | j) Riser 6 or 7 inch high | LF | $0.00 | |||
| 0001-AK | k) Rubber stair nosing: | LF | $0.00 | |||
| 0001-AL | l) Metal stair nosing: | LF | $0.00 | |||
| 0001-AM | m) Rubber stair treads | LF | $0.00 | Not to Exceed Pricing | ||
| 0001-AN | n) Remove risers, nosings any size, rubber, vinyl, wood | LF | $0.00 | |||
| 0001-AO | o) Remove stair treads any size, rubber, vinyl, wood | LF | $0.00 | |||
| CLIN 1 SUBTOTAL | $0.00 | |||||
| CLIN 0002 | Adhesive Cost | |||||
| 0002-AA | a) Low VOC wet adhesive 4 gallon pail | 4 gal | $0.00 | |||
| 0002-AB | b) Low VOC releasable wet adhesive 4 gallon pail | 4 gal | $0.00 | |||
| 0002-AC | c) Other Adhesive (Specify if needed) | $0.00 | Not to Exceed Pricing | |||
| CLIN 2 SUBTOTAL | $0.00 | |||||
| CLIN 0003 | Installer Cost | |||||
| Install Flooring: Note Installation amount paid shall be for the actual | ||||||
| amount of flooring installed not the amount handled | ||||||
| 0003-AA | a) Carpet - Glue down method (WH) | SY | $0.00 | |||
| 0003-AB | b) Carpet - Glue down method (AH) | SY | $0.00 | |||
| 0003-AC | c) Carpet - Tiles/squares (WH) | SY | $0.00 | |||
| 0003-AD | d) Carpet - Tiles/squares (AH) | SY | $0.00 | |||
| 0003-AE | e) Carpet - Install single border (two borders double cost) | LF | ||||
| 0003-AF | f) Vinyl Tile (WH) | SF | $0.00 | |||
| 0003-AG | g) Vinyl Tile (AH) | SF | $0.00 | |||
| 0003-AH | h) LVT (Floating/Locking) (WH) | SY | $0.00 | |||
| 0003-AI | i) LVT (Floating/Locking) (AH) | SY | $0.00 | |||
| 0003-AJ | j) LVT (glue down) (WH) | SY | $0.00 | |||
| 0003-AK | k) LVT (glue down) (AH) | SY | $0.00 | |||
| 0003-AL | l) Cereamic/Porcelain (Floors) (WH) | SY | $0.00 | |||
| 0003-AM | m) Cereamic/Porcelain (Floors) (AH) | SY | $0.00 | |||
| 0003-AN | n) Sheet vinyl (WH) | SY | $0.00 | |||
| 0003-AO | o) Sheet vinyl (AH) | SY | $0.00 | |||
| Removing existing flooring: | ||||||
| 0003-AP | p) Broadloom carpet glued down | SY | $0.00 | |||
| 0003-AQ | q) Broadloom carpet and pad | SY | $0.00 | |||
| 0003-AR | r) Carpet tiles/squares | SY | $0.00 | |||
| 0003-AS | s) Rubber backed carpet | SY | $0.00 | |||
| 0003-AT | t) Vinyl Tile | SF | $0.00 | |||
| 0003-AU | u) Sheet Vinyl | SF | $0.00 | |||
| 0003-AV | v) Luxury Vinyl Tile | SF | $0.00 | |||
| 0003-AW | w) Ceramic/Porcelain Tile | SF | $0.00 | |||
| Furniture Moving Items | ||||||
| Furniture removal and replacement: | ||||||
| 0003-AX | x) Free standing | SY | $0.00 | |||
| 0003-AY | y) Systems furniture moving, lift method | SY | $0.00 | |||
| 0003-AZ | z) Safes and/or Refrigerators | EA | $0.00 | |||
| 0003-AAA | aa) Move carpet to upper level, per floor. Not to be paid when elevator is available | SY | $0.00 | |||
| Installation on Landings, Stages and Stairs | ||||||
| 0003-AAB | ab) Installation of carpet on landings, stages and stairs includes wrapping | LF | $0.00 | |||
| Miscellaneous Labor Items to Be Negotiated Per Call | ||||||
| 0003-AAC | ac) Cut off wood doors, maximum width 4'6" | EA | $0.00 | |||
| 0003-AAD | ad) Patchwork/repair (as needed) | SY | $0.00 | |||
| Delivery, Storage and Handeling of Materials | ||||||
| 003-AAE | ae) Handeling & Storage of Carpet | SY | ||||
| 003-AAF | af) Transport and Delivery | SY | ||||
| 004-AAG | ag) Freight | EA | ||||
| 004-AAH | ah) Overhead | |||||
| 004-AAI | ai) Profit | |||||
| CLIN 3 SUBTOTAL | $0.00 | |||||
| TOTAL | $0.00 |
Microsoft_Word_Document.docx image1.emf
Microsoft_Word_Document1.docx
STATEMENT OF WORK TEMPLATE
STATEMENT OF WORK FOR INSTALLING CARPET
INTERIOR OF BLDG (Work Order: )
1.0 JOB DESCRIPTION
The contractor shall furnish all labor, equipment and materials, and perform all operations in connection with (brief job description) in Bldg. .
2.0 WORK INCLUDED
2.1 The work to be performed includes but is not limited to the following: Removal of old material, clean, prep area as needed to install new materials in Bldg. . All work shall be accomplished in accordance with industry standards and in a safe manner.
2.2 The following rooms are included in this project:
-X
-X
-X
**Work does/does not include move/lift of furniture.
3.0 HOURS OF WORK
Normal hours of work shall be from 7:00 AM to 4:30 PM, Monday through Friday, except Federal Holidays. Work outside normal hours may be approved on a case-by-case basis, with prior approval by the Contracting Officer when requested in advance in writing by the contractor to complete work that can’t be accomplished within normal duty hours.
4.0 ESTIMATED JOB COMPLETION
Period of performance shall be XX Days after NTP, receipt of order and coordination with the Government.
5.0 COORDINATION OF WORK
5.1 The contractor shall coordinate all work through the requesting agencies Point of Contact (POC), Contracting Officer and Inspector.
5.2 Contractor shall protect Government property from any possible damage at all times during the accomplishment of the work described for this project.
6.0 CLEANUP AND DISPOSAL
All equipment, and tools, shall be secured and stored in a predetermined location so that there is no interference with the movement or operation of military equipment. All debris shall be picked up and removed daily from job site.
7.0 REGULATORY WORK REQUIREMENTS
Preparatory work is required on all jobs to include scraping, grinding, sanding, proper grading, and leveling of surfaces to bring the finished product to satisfactory and desired end result as determined by the Government.
8.0 UTILITIES
The Government will provide all necessary utilities needed to complete this project.
9.0 MATERIALS
All required materials will be provided by the contractor.
10.0 WORK PERFORMANCE
Job site shall be clean and free of all debris after installation of materials.
11.0 FINAL ACCEPTANCE
The contractor shall request a final inspection from the Inspector after all work has been completed, work site and lay-down areas have been cleaned and restored to original condition and all contractor equipment has been removed from the installation. The Inspector will submit a 100% work acceptance letter to the Contracting Officer.
END OF STATEMENT OF WORK
image2.emf
File details come from the government source that posted it. Updated .