Attachment 8a_Sample Mock Project_Carpet.docx

DOCX document 16 KB Posted

Attached to
Tinker AFB Flooring Blanket Purchase Agreement
Solicitation number
FA8136-25-Q-0003
Issued by

About this file

This is a mock project scope of work for carpet replacement in Building 3001, Room 109 at Tinker Air Force Base, which appears to be a sample project related to the larger Tinker AFB Flooring Blanket Purchase Agreement solicitation (FA8136-25-Q-0003).

The project requires removal and replacement of approximately 500 square yards of rolled carpet with Tier I authorized 24" x 24" carpet tiles in accordance with the USAF Mandatory Carpet Program. The contractor must provide all labor, tools, equipment, and materials, including delivery, storage, handling, freight, installation, and adhesives. Work includes removing/relocating systems furniture, removing existing carpet and rubber cove base, preparing the floor by filling cracks, installing new carpet tiles and 4" rubber cove base, and returning furniture to its original location. Work is to be performed during normal duty hours with no phasing requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Replace Carpeting Building 3001

(WT #121755)

XX XXX 20XX

1. DESCRIPTION OF SERVICES:

1.1 The Contractor shall furnish all tools, labor, equipment, instruments, demolition, transportation and all materials necessary to replace flooring materials in room 109 at building 3001 at Tinker AFB Oklahoma. All work shall be in accordance with (IAW) the Performance Work Statement dated XX XXX 20XX, the USAF Mandatory Carpet Program, Industry Standards, and TAFB Standards.

1.2 The work shall mean to remove approximately 500 square yards (SY) of rolled carpet and replace with Tier I authorized 24” x 24” carpet tiles/squares for the workspace. The Contractor shall be responsible for field verification to verify measurements IAW PWS 1.3.1.

1.3 The work shall include delivery, storage, handling, freight, installation, and adhesives.

1.4 There is no phasing requirement for this work.

1.5 Work shall be accomplished during normal duty hours.

2. DESCRIPTION OF WORK:

2.1 Contractor Shall:

(a) Remove/relocate systems furniture to prepare the work site IAW PWS 1.4.1 – 1.4.3.

(b) Remove and dispose existing carpeting IAW PWS 1.3.2. and 1.8.2.

(c) Remove and dispose of the 4” rubber cove base IAW PWS 1.8.2.

(d) Prepare floor to include filling in all cracks IAW PWS 1.3.1 – 1.3.3.

(e) Install Tier I authorized carpet tiles IAW PWS 1.5.5. – 1.5.5.7.

(f) Install new 4” rubber cove base IAW PWS 1.3.3.1. and 1.3.3.2.

(g) Relocate systems furniture to complete the work site IAW PWS 1.4.1 – 1.4.3.

3. POC: XXXX XXXXX, XXX-3301

File details come from the government source that posted it. Updated .