Attachment 8b_Sample Mock Project_Ceramic Tile.docx
DOCX document 17 KB Posted
- Attached to
- Tinker AFB Flooring Blanket Purchase Agreement
- Solicitation number
- FA8136-25-Q-0003
About this file
This is a sample mock project scope of work for ceramic tile flooring replacement at Building 280 at Tinker Air Force Base. The work involves removing approximately 500 square feet of existing ceramic tile and installing new 24" x 24" Tier I authorized ceramic tile in the lobby entrance. The contractor must provide all labor, materials, tools, equipment, and transportation needed for demolition and installation.
Specific requirements include removing and disposing of existing tile, repairing/leveling damaged areas, removing moldings/baseboards as needed, following manufacturer recommendations for adhesives and mortar application, cutting/trimming tiles around obstacles, installing new 4" rubber cove base, and following all industry standards and TAFB requirements. Work is to be performed during normal duty hours with phasing requirements. This appears to be one of three mock projects included as part of a larger Blanket Purchase Agreement solicitation (FA8136-25-Q-0003) for flooring services at Tinker AFB.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Replace Ceramic Tile Building 280
(WT #121756)
XX XXX 20XX
1. DESCRIPTION OF SERVICES:
1.1 The Contractor shall furnish all tools, labor, equipment, instruments, demolition, transportation and all materials necessary to replace flooring materials in the lobby entrance at building 280 at Tinker AFB Oklahoma. All work shall be in accordance with (IAW) the Performance Work Statement dated XX XXX 20XX, the USAF Mandatory Carpet Program, Industry Standards, and TAFB Standards.
1.2 The work shall mean to remove approximately 500 square feet (SF) of ceramic tile carpet and replace with Tier I authorized 24” x 24” ceramic tile for the workspace. The Contractor shall be responsible for field verification to verify measurements IAW PWS 1.3.1.
1.3 The work shall include delivery, storage, handling, freight, installation, adhesives, mortar, and grout.
1.4 There is a phasing requirement for this work.
1.5 Work shall be accomplished during normal duty hours.
2. DESCRIPTION OF WORK:
2.1 Contractor Shall:
(a) Remove dispose of existing ceramic tile IAW PWS 1.7.1.
(b) Remove dispose existing ceramic tile Repair, patch and level any damaged or uneven areas. Remove moldings, base boards and/or trim that may interfere with tile application. Contractor shall check all doorjambs and slabs to ensure that floor tile has clearance when installed IAW PWS 1.7.1.
(c) Efficiently layout starting with marking the center point of each of the walls in the room, chalk lines between the center points of opposite walls to pinpoint the center of the room, pre-lay out tile to get a visual of the breaking lines and make any necessary adjustments to ensure that the intersection creates perfect squares IAW PWS 1.7.2.
(d) Follow manufacturer’s recommendations for adhesives and mortar. Contractor shall spread a ¼” coat to comb adhesive/mortar into standing ridges and remove the excess adhesive/mortar to leave a uniform ridged setting to determine the perfect adhesive application IAW PWS 1.7.3.
(e) Mark and cut and trim tiles as needed around cabinets, doorways, walls and other flooring stops. IAW PWS 1.7.5
(f) Follow all manufacture instructions and recommendations. Any special sealers or polishes that are recommended by the manufacture should be included in the price provided to the Government IAW PWS 1.7.6.
(g) Install new 4” rubber cove base IAW PWS 1.3.3.1. and 1.3.3.2
3. POC: XXXX XXXXX, XXX-3301
File details come from the government source that posted it. Updated .