Attachment 8 Self Performed Work Calc.docx

DOCX document 28 KB Posted

Attached to
Handrail Replacement Waco VAMC Federal contract opportunity
Solicitation number
36C25725B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This appears to be a blank or inaccessible template document titled "Self Performed Work Calc" that was included as Attachment 8 to a VA solicitation for handrail replacement work at the Waco VA Medical Center. Without access to the actual content of the file, I cannot provide details about specific calculations or requirements contained within it.

View the file

Other files for this federal contract opportunity

Other files attached to Handrail Replacement Waco VAMC, newest first.
File Type Posted
Attachment 15 R1 RFIs and Responses Handrail Waco.pdf PDF
Amendment 36C25725B0009 0004.pdf PDF
Amendment 36C25725B0009 0003.pdf PDF
Attachment 15 RFIs and Responses Handrail Waco.pdf PDF
Amendment 36C25725B0009 0002.pdf PDF
Attachment 14 Site Visit Sign-In.pdf PDF
Solicitation (1) 36C25725B0009 Handrail.pdf PDF
Attachment 10 Wate Determination McLennan.pdf PDF
Attachment 13 - FEB 2025 Deviations.pdf PDF
Amendment 36C25725B0009 0001.pdf PDF
S02 Solicitation 36C25725B0009 Handrail Waco.pdf PDF
Attachment 2 - Combined Drawings.pdf PDF
Attachment 5 - door-and-wall-protection-systems_warranty.pdf PDF
Attachment 7a PCRA 4-7-11-91.pdf PDF
Attachment 9 - Special Standard of Responsibility.pdf PDF
Attachment 11 - Site Visit Map.pdf PDF
Attachment 12 - ADA Standards.pdf PDF
Attachment 1 SOW Handrail 2.20.2025.pdf PDF
Attachment 4 - 1000bh_g2-1000bh-ligature-resistant-handrail_installation-instructions.pdf PDF
Attachment 6 - ipc-clean-up-instructions.pdf PDF
Attachment 7b PCRA Bldg. 94.pdf PDF
Attachment 7c ICRA Bldg. 94.pdf PDF
Attachment 3 - 1000bh_1055bh-ligature-resistant-handrail_technical-data.pdf PDF
Attachment 10 - Davis-Bacon Act WD TX20240230.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.4 OFFEROR’S SELF PERFORMED CALCULATIONS

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Cost of Materials $ __________

c) Total excluding materials (a-b) $ __________

d) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)

e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) __________%

f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________%

A/E-Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified VetCert SDVOSBs.

General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.

Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified VetCert SDVOSBs.

File details come from the government source that posted it. Updated .