Attachment 8 Self Performed Work Calc.docx
DOCX document 28 KB Posted
- Attached to
- Handrail Replacement Waco VAMC Federal contract opportunity
- Solicitation number
- 36C25725B0009
About this file
This appears to be a blank or inaccessible template document titled "Self Performed Work Calc" that was included as Attachment 8 to a VA solicitation for handrail replacement work at the Waco VA Medical Center. Without access to the actual content of the file, I cannot provide details about specific calculations or requirements contained within it.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.4 OFFEROR’S SELF PERFORMED CALCULATIONS
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Cost of Materials $ __________
c) Total excluding materials (a-b) $ __________
d) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)
e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) __________%
f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________%
A/E-Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified VetCert SDVOSBs.
General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.
Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified VetCert SDVOSBs.
File details come from the government source that posted it. Updated .