Attachment 10 - Davis-Bacon Act WD TX20240230.pdf

PDF 2 MB Posted

Attached to
Handrail Replacement Waco VAMC Federal contract opportunity
Solicitation number
36C25725B0009
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This is a Davis-Bacon Act Wage Determination (TX20240230) dated 11/22/2024 for building construction projects in Bell County, Texas, excluding single-family homes and apartments up to 4 stories. The wage determination establishes minimum wage rates and fringe benefits for various construction trades, with two key Executive Order wage requirements: workers on contracts entered/renewed after January 30, 2022 must be paid at least $17.20 per hour, while contracts awarded between January 1, 2015 and January 29, 2022 (not renewed) require minimum $12.90 per hour.

The document lists detailed wage rates and fringe benefits for numerous construction trades, including boilermakers ($37.00 + $24.64), power equipment operators ($28.75-$32.85 + $10.60-$13.10), ironworkers ($28.26 + $8.13), pipefitters ($36.15 + $15.92), and various other specialized workers. The determination includes provisions for paid sick leave under EO 13706 for covered contracts awarded after January 1, 2017, requiring 1 hour of paid sick leave for every 30 hours worked up to 56 hours annually. The document also outlines the wage determination appeals process and provides contact information for the Department of Labor's Wage and Hour Division for questions or appeals.

View the file

Other files for this federal contract opportunity

Other files attached to Handrail Replacement Waco VAMC, newest first.
File Type Posted
Attachment 15 R1 RFIs and Responses Handrail Waco.pdf PDF
Amendment 36C25725B0009 0004.pdf PDF
Amendment 36C25725B0009 0003.pdf PDF
Attachment 15 RFIs and Responses Handrail Waco.pdf PDF
Amendment 36C25725B0009 0002.pdf PDF
Attachment 14 Site Visit Sign-In.pdf PDF
Solicitation (1) 36C25725B0009 Handrail.pdf PDF
Attachment 10 Wate Determination McLennan.pdf PDF
Attachment 13 - FEB 2025 Deviations.pdf PDF
Amendment 36C25725B0009 0001.pdf PDF
S02 Solicitation 36C25725B0009 Handrail Waco.pdf PDF
Attachment 2 - Combined Drawings.pdf PDF
Attachment 5 - door-and-wall-protection-systems_warranty.pdf PDF
Attachment 7a PCRA 4-7-11-91.pdf PDF
Attachment 8 Self Performed Work Calc.docx DOCX document
Attachment 9 - Special Standard of Responsibility.pdf PDF
Attachment 11 - Site Visit Map.pdf PDF
Attachment 12 - ADA Standards.pdf PDF
Attachment 1 SOW Handrail 2.20.2025.pdf PDF
Attachment 4 - 1000bh_g2-1000bh-ligature-resistant-handrail_installation-instructions.pdf PDF
Attachment 6 - ipc-clean-up-instructions.pdf PDF
Attachment 7b PCRA Bldg. 94.pdf PDF
Attachment 7c ICRA Bldg. 94.pdf PDF
Attachment 3 - 1000bh_1055bh-ligature-resistant-handrail_technical-data.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .