This is a Relevant Experience Project Template attachment for RFP 75A50226R00024 for Emergency Response Wraparound Services issued by the Department of Health and Human Services Administration for Strategic Preparedness and Response (ASPR).
Offerors must submit a minimum of 2 projects and a maximum of 4 projects demonstrating relevant experience. Each project submission requires identification of the prime contractor, contract or task order number, contract vehicle type (contract, FSS task order, IDIQ task order, BPA, or BOA), and period of performance within the past 5 years. Primary and alternate government references must be provided for verification purposes, including contracting officers, project managers, or contracting officer representatives with contact information. Projects must demonstrate an annual value of at least $500,000 per year and be substantiated with scanned PDF documentation, with all validating file documentation included in Volume 1 of the proposal. Offerors must identify the NAICS and PSC codes under which projects were solicited, the annual dollar value per year, and all functional areas performed with explanations limited to 125 words each. Additional requirements include documenting federal agency prime performance, subcontracting or teaming involving at least two separate entities, and specific functional areas such as Incident Management, Hazardous Materials Management, and Responder Billeting. All supporting documentation must be highlighted or identified within scanned documents for validation purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6_Qualification and Certification_RFP 75A50226R000024.docx | DOCX document | |
| Attachment 3A_Self Scoring Worksheet SAMPLE_RFP 75A50226R00024.xlsx | XLSX spreadsheet | |
| Attachment 4_Cost Price Template_RFP75A50226R00024.xlsx | XLSX spreadsheet | |
| RFP75A50226R00024.pdf | ||
| Attachment 1_SOW_RFP 75A50226R00024.pdf | ||
| Attachment 2_Offerors Proposal Checklist_RFP 75A50226R00024.docx | DOCX document | |
| Attachment 3_Self Scoring Worksheet_RFP 75A50226R00024.xlsx | XLSX spreadsheet | |
| Attachment 5_ Past Performance Rating Form_RFP 75A50226R00024.docx | DOCX document | |
| Attachment 9_NAICS or PSC Code Change Letter_RFP 75A50226R00024.docx | DOCX document | |
| Attachment 7_ Industry Questions Template_RFP 75A50226R00024.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 75A50226R00024
Attachment (8)
RELEVANT EXPERIENCE PROJECT TEMPLATE
| Offeror: |
| Click here to enter text. |
INSTRUCTIONS:
1. This template provides a section for each of the Relevant Experience (Primary) Projects submitted.
2. The Offeror must submit a Minimum of 2 Projects up to a Maximum of 4 Projects. If the Offeror only chooses to submit 2 Projects, leave PROJECT 3, and PROJECT 4 TEMPLATES blank. If the Offeror chooses to only submit 3 Projects, leave PROJECT 4 TEMPLATE blank.
3. Offerors must respond to all questions and requests, as applicable.
4. All proposal documentation associated with this template must be scanned documents in PDF format.
5. All file documentation for validation must be highlighted/identified within the scanned documents.
6. All file documentation for validation must be included in Volume 1 of the Offeror’s proposal submission.
7. All explanations are limited to no more than 125 words.
RELEVANT EXPERIENCE PROJECT 1 - BACKGROUND INFORMATION:
1. Who is the PRIME CONTRACTOR under the Contract or Task Order?
| Prime Contractor Name: |
| Click here to enter text. |
Note: In order to substantiate the Prime Contractor Name, the Offeror must provide a scan of the award page of the Contract or Task Order in Volume 1, Relevant Experience, of the proposal submission. If the Contract or Task Order was awarded under a different name than the Offeror, then the Offeror must provide a copy of a Meaningful Relationship Commitment Letter or other Agreement (e.g., Novation, etc.) as applicable. Highlight this information in the scanned document(s).
2. What is the CONTRACT OR TASK ORDER NUMBER of the project?
| Contract or Task Order Number: |
| Click here to enter text. |
Note: In order to substantiate the Contract or Task Order number, the Offeror must provide a scan of the award page of Contract or Task Order in Volume 1, Relevant Experience, of the proposal submission.
3. What is the TYPE OF VEHICLE? (Check only one):
☐ CONTRACT (NOT a Task Order)
☐ TASK ORDER UNDER A FEDERAL SUPPLY SCHEDULE (RFO FAR 8.4)
☐ TASK ORDER UNDER A MASTER IDIQ TASK ORDER CONTRACT (RFO FAR 16.504)
☐ TASK ORDER UNDER A BLANKET PURCHASE AGREEMENT (RFO FAR 8.4)
☐ TASK ORDER UNDER A BASIC ORDERING AGREEMENT (FAR 16.703)
4. Provide a PRIMARY Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
5. Provide an ALTERNATE Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
6. Does the project meet the minimum PERIOD OF PERFORMANCE requirement (Ongoing or Completed) within the past 5 years?
☐ Yes
☐ No
If Yes, what is/was the PERIOD OF PERFORMANCE, including Options?
| Period of Performance, including Options |
| Click here to enter text. |
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Period of Performance in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
7. Is the ANNUAL PROJECT VALUE AT LEAST $500,000 PER YEAR?
☐ Yes
☐ No
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Annual Project Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
RELEVANT EXPERIENCE PROJECT 1 – SCORING RELATED INFORMATION
8. Was the project solicited under or reported under a NAICS and PSC CODE that correlates to the NAICS CODE AND PSC CODE in RFP Sections M.2 and M.8, respectively.
☐ Yes
☐ No
If No, what was the predominate NAICS and PSC CODE that this project was solicited under or reported under in FPDS-NG or other documentation? (Provide only one)
| NAICS CODE and PSC CODE: |
| Click here to enter text. |
Note: Offeror must provide the FPDS-NG report, if available. If the FPDS-NG report is unavailable, the Offeror must provide excerpts of the Contract or Task Order solicitation or other documentation that validates the NAICS or PSC Code in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
9. What is/was the ANNUAL DOLLAR VALUE PER YEAR of the project? (Check only one)
☐ < $1M
☐ >$1M < $5M
☐ >$5M < $10M
☐ >$10M
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the Annual Dollar value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
10. Which FUNCTIONAL AREAS/TASKS were performed on the project? (Include all that apply).
For each Functional Area/Task, listed in Section 19, Chart 1, briefly (125 words or less for each Functional Area) explain the rationale supporting your assertion that each Functional Area was performed. (Add lines as required).
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the FUNCTIONAL AREAS performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
11. Does the project involve performance of RELEVANT EXPERIENCE, AS A PRIME, FOR PROJECTS WITH A FEDERAL AGENCY?
☐ Yes
☐ No
If Yes, briefly describe Relevant Experience for Projects with a Federal Agency
Click here to enter text.
12. Does the project involve performance of SUBCONTRACTING or TEAMING of AT LEAST 2 SEPARATE ENTITIES/CONSULTANTS?
☐ No
If Yes, briefly identify who the Subcontractors/Teaming partners were and the work being done by each one of them. Limit explanation to at least 2 but, no more than 6, separate entities/consultants in the space provided below.
Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates the Subcontracting/Teaming performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
13. Which FUNCTIONAL AREAS were performed on the project? (Check all that apply).
For each Functional Area/Task, briefly (125 words or less for each Functional Area) explain the rationale supporting the assertion that each Functional Area was performed. Provide this information next to each Functional Area checked below.
☐ Incident Management: Click here to enter text.
☐ Hazardous Materials (HAZMAT) Management: Click here to enter text.
☐ Responder Billeting: Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the FUNCTIONAL AREAS performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
END OF PROJECT 1
RELEVANT EXPERIENCE PROJECT 2 - BACKGROUND INFORMATION:
14. Who is the PRIME CONTRACTOR under the Contract or Task Order?
| Prime Contractor Name: |
| Click here to enter text. |
Note: In order to substantiate the Prime Contractor Name, the Offeror must provide a scan of the award page of the Contract or Task Order in Volume 1 of the proposal submission. If the Contract or Task Order was awarded under a different name than the Offeror, then the Offeror must provide a copy of a Meaningful Relationship Commitment Letter or other Agreement (e.g., Novation, etc.) as applicable. Highlight this information in the scanned document(s).
15. What is the CONTRACT OR TASK ORDER NUMBER of the project?
| Contract or Task Order Number: |
| Click here to enter text. |
Note: In order to substantiate the Contract or Task Order number, the Offeror must provide a scan of the award page of Contract or Task Order in Volume 1 of the proposal submission.
16. What is the TYPE OF VEHICLE? (Check only one):
☐ CONTRACT (NOT a Task Order)
☐ TASK ORDER UNDER A FEDERAL SUPPLY SCHEDULE (RFO FAR 8.4)
☐ TASK ORDER UNDER A MASTER IDIQ TASK ORDER CONTRACT (RFO FAR 16.504)
☐ TASK ORDER UNDER A BLANKET PURCHASE AGREEMENT (RFO FAR 8.4)
☐ TASK ORDER UNDER A BASIC ORDERING AGREEMENT (FAR 16.703)
17. Provide a PRIMARY Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
18. Provide an ALTERNATE Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
19. Does the project meet the minimum PERIOD OF PERFORMANCE requirement (Ongoing or Completed) within the past 5 years?
☐ No
If Yes, what is/was the PERIOD OF PERFORMANCE, including Options?
| Period of Performance, including Options |
| Click here to enter text. |
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Period of Performance in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
20. Is the ANNUAL PROJECT VALUE AT LEAST $500,000 PER YEAR?
☐ Yes
☐ No
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Annual Project Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
RELEVANT EXPERIENCE PROJECT 1 – SCORING RELATED INFORMATION
21. Was the project solicited under or reported under a NAICS and PSC CODE that correlates to the NAICS CODE AND PSC CODE in RFP Sections M.2 and M.8, respectively.?
☐ Yes
☐ No
If no, what was the predominate NAICS and PSC CODE that this project was solicited under or reported under in FPDS-NG or other documentation? (Provide only one)
| NAICS CODE and PSC CODE: |
| Click here to enter text. |
Note: Offeror must provide the FPDS-NG report, if available. If the FPDS-NG report is unavailable, the Offeror must provide excerpts of the Contract or Task Order solicitation or other documentation that validates the NAICS or PSC Code in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
22. What is/was the ANNUAL DOLLAR VALUE PER YEAR of the project? (Check only one)
☐ < $1M
☐ >$1M < $5M
☐ >$5M < $10M
☐ > $10M
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the Annual Dollar Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
23. Which FUNCTIONAL AREAS were performed on the project? (Include all that apply)
For each Functional Area/Task, listed in Section 19, Chart 1, briefly (125 words or less for each Functional Area) explain the rationale supporting the assertion that each Functional Area was performed. (Add lines as required).
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the FUNCTIONAL AREAS performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
24. Does the project involve performance of RELEVANT EXPERIENCE, AS A PRIME, FOR PROJECTS WITH A FEDERAL AGENCY?
☐ Yes
☐ No
If Yes, briefly describe Relevant Experience for Projects with a Federal Agency.
Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates each location that work was performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
25. Does the project involve performance of SUBCONTRACTING or TEAMING of AT LEAST 2 SEPARATE ENTITIES/CONSULTANTS?
☐ Yes
If Yes, briefly identify who the Subcontractors/Teaming partners were and the work being done by each one of them. Limit explanation to at least 2 but, no more than 6, separate entities/consultants in the space provided below.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates the Subcontracting/Teaming performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
END OF PROJECT 2
RELEVANT EXPERIENCE PROJECT 3 - BACKGROUND INFORMATION:
26. Who is the PRIME CONTRACTOR under the Contract or Task Order?
| Prime Contractor Name: |
| Click here to enter text. |
Note: In order to substantiate the Prime Contractor Name, the Offeror must provide a scan of the award page of the Contract or Task Order in Volume 1 of the proposal submission. If the Contract or Task Order was awarded under a different name than the Offeror, then the Offeror must provide a copy of a Meaningful Relationship Commitment Letter or other Agreement (e.g., Novation, etc.) as applicable. Highlight this information in the scanned document(s).
27. What is the CONTRACT OR TASK ORDER NUMBER of the project?
| Contract or Task Order Number: |
| Click here to enter text. |
Note: In order to substantiate the Contract or Task Order number, the Offeror must provide a scan of the award page of Contract or Task Order in Volume 1 of the proposal submission.
28. What is the TYPE OF VEHICLE? (Check only one):
☐ CONTRACT (NOT a Task Order)
☐ TASK ORDER UNDER A FEDERAL SUPPLY SCHEDULE (RFO FAR 8.4)
☐ TASK ORDER UNDER A MASTER IDIQ TASK ORDER CONTRACT (RFO FAR 16.504)
☐ TASK ORDER UNDER A BLANKET PURCHASE AGREEMENT (RFO FAR 8.4)
☐ TASK ORDER UNDER A BASIC ORDERING AGREEMENT (FAR 16.703)
29. Provide a PRIMARY Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
30. Provide an ALTERNATE Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
31. Does the project meet the minimum PERIOD OF PERFORMANCE requirement (Ongoing or Completed) within the past 5 years?
☐ No
If Yes, what is/was the PERIOD OF PERFORMANCE, including Options?
| Period of Performance, including Options |
| Click here to enter text. |
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Period of Performance in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
32. Is the ANNUAL PROJECT VALUE AT LEAST $500,000 PER YEAR?
☐ Yes
☐ No
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Annual Project Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
RELEVANT EXPERIENCE PROJECT 1 – SCORING RELATED INFORMATION
33. Was the project solicited under or reported under a NAICS and PSC CODE that correlates to the NAICS CODE AND PSC CODE in RFP Sections M.2 and M.8, respectively.?
☐ Yes
☐ No
If No, what was the predominate NAICS and PSC CODE that this project was solicited under or reported under in FPDS-NG or other documentation? (Provide only one)
| NAICS CODE and PSC CODE: |
| Click here to enter text. |
Note: Offeror must provide the FPDS-NG report, if available. If the FPDS-NG report is unavailable, the Offeror must provide excerpts of the Contract or Task Order solicitation or other documentation that validates the NAICS or PSC Code in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
34. What is/was the ANNUAL DOLLAR VALUE PER YEAR of the project? (Check only one)
☐ < $1M
☐ >$1M < $5M
☐ >$5M < $10M
☐ > $10M
Briefly explain how you calculated the Annual Dollar Value Per Year
Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the Annual Dollar value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
35. Which FUNCTIONAL AREAS were performed on the project? (Include all that apply).
For each Functional Area/Task, listed in Section 19, Chart 1, briefly (125 words or less for each Functional Area) explain the rationale supporting the assertion that each Functional Area was performed. (Add lines as required).
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the FUNCTIONAL AREAS performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
36. Does the project involve performance of RELEVANT EXPERIENCE, AS A PRIME, FOR PROJECTS WITH A FEDERAL AGENCY
☐ Yes
If Yes, briefly describe Relevant Experience For Projects with a Federal Agency.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates each location that work was performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
37. Does the project involve performance of SUBCONTRACTING or TEAMING of AT LEAST 2 SEPARATE ENTITIES/CONSULTANTS?
☐ Yes
If Yes, briefly identify who the Subcontractors/Teaming partners were and the work being done by each one of them. Limit explanation to at least 2 but, no more than 6, separate entities/consultants in the space provided below.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates the Subcontracting/Teaming performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
END OF PROJECT 3
RELEVANT EXPERIENCE PROJECT 4 - BACKGROUND INFORMATION:
38. Who is the PRIME CONTRACTOR under the Contract or Task Order?
| Prime Contractor Name: |
| Click here to enter text. |
Note: In order to substantiate the Prime Contractor Name, the Offeror must provide a scan of the award page of the Contract or Task Order in Volume 1 of the proposal submission. If the Contract or Task Order was awarded under a different name than the Offeror, then the Offeror must provide a copy of a Meaningful Relationship Commitment Letter or other Agreement (e.g., Novation, etc.) as applicable. Highlight this information in the scanned document(s).
39. What is the CONTRACT OR TASK ORDER NUMBER of the project?
| Contract or Task Order Number: |
| Click here to enter text. |
Note: In order to substantiate the Contract or Task Order number, the Offeror must provide a scan of the award page of Contract or Task Order in Volume 1 of the proposal submission.
40. What is the TYPE OF VEHICLE? (Check only one):
☐ CONTRACT (NOT a Task Order)
☐ TASK ORDER UNDER A FEDERAL SUPPLY SCHEDULE (RFO FAR 8.4)
☐ TASK ORDER UNDER A MASTER IDIQ TASK ORDER CONTRACT (RFO FAR 16.504)
☐ TASK ORDER UNDER A BLANKET PURCHASE AGREEMENT (RFO FAR 8.4)
☐ TASK ORDER UNDER A BASIC ORDERING AGREEMENT (FAR 16.703)
41. Provide a PRIMARY Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
42. Provide an ALTERNATE Reference: (Person who can verify all the Contract or Task Order data - Government Contracting Officer, Project/Program Manager, or Contracting Officer Representative)
| Name: |
| Click here to enter text. |
| Title: |
| Click here to enter text. |
| Agency or Customer: |
| Click here to enter text. |
| Phone: |
| Click here to enter text. |
| E-Mail: |
| Click here to enter text. |
43. Does the project meet the minimum PERIOD OF PERFORMANCE requirement (Ongoing or Completed) within the past 5 years?
☐ No
If Yes, what is/was the PERIOD OF PERFORMANCE, including Options?
| Period of Performance, including Options |
| Click here to enter text. |
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Period of Performance in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
44. Is the ANNUAL PROJECT VALUE OF AT LEAST $500,000 PER YEAR?
☐ Yes
☐ No
Note: The Offeror must provide excerpt(s) from verifiable documentation to substantiate the Annual Project Value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
RELEVANT EXPERIENCE PROJECT 4 – SCORING RELATED INFORMATION
45. Was the project solicited under or reported under a NAICS and PSC CODE that correlates to the NAICS CODE AND PSC CODE in RFP Sections M.2 and M.8, respectively.
☐ Yes
☐ No
If No, what was the predominate NAICS and PSC CODE that this project was solicited under or reported under in FPDS-NG or other documentation? (Provide only one)
| NAICS CODE and PSC CODE: |
| Click here to enter text. |
Note: Offeror must provide the FPDS-NG report, if available. If the FPDS-NG report is unavailable, the Offeror must provide excerpts of the Contract or Task Order solicitation or other documentation that validates the NAICS or PSC Code in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
46. What is/was the ANNUAL DOLLAR VALUE PER YEAR of the project? (Check only one)
☐ < $1M
☐ >$1M < $5M
☐ >$5M < $10M
☐ > $10M
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the Annual Dollar value in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
47. Which FUNCTIONAL AREAS were performed on the project? (Include all that apply).
For each Functional Area/Task, listed in Section 19, Chart 1, briefly (125 words or less for each Functional Area) explain the rationale supporting assertion that each Functional Area was performed. (Add lines as required).
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
[Insert Functional Area/Task]: Click here to enter text.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiate the FUNCTIONAL AREAS performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
48. Does the project involve performance of RELEVANT EXPERIENCE, AS A PRIME, FOR PROJECTS WITH A FEDERAL AGENCY?
☐ Yes
If Yes, briefly describe Relevant Experience For Projects with a Federal Agency?
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates each location that work was performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
49. Does the project involve performance of SUBCONTRACTING or TEAMING of AT LEAST 2 SEPARATE ENTITIES/CONSULTANTS?
☐ Yes
If Yes, briefly identify who the Subcontractors/Teaming partners were and the work being done by each one of them. Limit explanation to at least 2 but, no more than 6, separate entities/consultants in the space provided below.
Note: Offeror must provide excerpts of Contract or Task Order documentation that substantiates the Subcontracting/Teaming performed in Volume 1 of the proposal submission. Highlight this information in the scanned document(s).
END OF PROJECT 4
Classified as HHS Proprietary - Label applied by: crystal.massey@hhs.gov
Classified as HHS Proprietary - Label applied by: crystal.massey@hhs.gov
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104Classified as HHS Proprietary - Label applied by: crystal.massey@hhs.gov
File details come from the government source that posted it. Updated .