Attachment 8- PERFORMANCE QUESTIONNAIRE.docx

DOCX document 17 KB Posted

Attached to
Y1PC--Ft. Sam Houston Phase 3 Expansion Federal contract opportunity
Solicitation number
36C10F21R0017
Issued by
Department of Veterans Affairs Office of Construction and Facilities Management

About this file

This document contains a federal contract opportunity notice and a past performance evaluation questionnaire template. The contract opportunity is for the Phase 3 Expansion project at Fort Sam Houston National Cemetery in San Antonio, Texas. The Department of Veterans Affairs seeks to develop approximately 50 acres for an additional 10 years of full burial capacity, including over 35,000 gravesites. The contract scope includes interment areas, access roads, parking, grading, drainage, landscaping, signage, buildings such as an honor guard building and storage facilities, irrigation, security upgrades, and habitat preservation. The estimated value is between $50-100 million. The North American Industry Classification System code is 237990. The solicitation number is 36C10F21R0017 and responses are due in late 2021 with an anticipated award date of August/September 2021. The opportunity is 100% set aside for Service-Disabled Veteran Owned Small Businesses. The past performance questionnaire template is to collect performance ratings and feedback on previous contracts from references for evaluation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1PC--Ft. Sam Houston Phase 3 Expansion, newest first.
File Type Posted
Solicitation Amendment - 36C10F21R0017 0002.docx DOCX document
Amendment Attachment 1 -- Columbaria Repair foundation.pdf PDF
Amendment Attachment 2 -- Waste Remediation Area.pdf PDF
Pre-Proposal Conference slides Ft Sam Houston NC - April 2021.pdf PDF
EXHIBIT 2.pdf PDF
Consolidated - Ft Sam Houston PPI RFP 36C10F21R0017 (Responses).pdf PDF
Amendment Attachment 3 -- Soils Report.pdf PDF
EXHIBIT 1.pdf PDF
Amendment Attachment 4 -- Mx Trailer temp IT Requirements.pdf PDF
S06 - 36C10F21R0017 0001.docx DOCX document
Amendment Attachment 5 - Wage Determination - TX20210231 - 03.12.2021.docx DOCX document
Pre-Proposal Conference Sign-In - 4.21.2021.pdf PDF
Attachment 1.2 - 01_PLANS - 08 - 13 - 04.12.2021.zip ZIP file
Attachment 4 - 04_EA FONSI - 04.12.2021.zip ZIP file
Attachment 1.1 - 01_PLANS - 01 - 07 - 04.12.2021.zip ZIP file
Attachment 1.3 - 01_PLANS - 14 - 22 - 04.12.2021.zip ZIP file
Attachment 6 - Wage Determination - TX20210007 - 01.01.2021.docx DOCX document
S02 - 36C10F21R0017 - 4.12.2021.docx DOCX document
Attachment 2 - 02_SPEC - 04.12.2021.zip ZIP file
Attachment 5 - 05_SWPPP - 04.21.2021.zip ZIP file
Attachment 7 - PRE-PROPOSAL INQUIRY (PPI) FORM.docx DOCX document
Attachment 3 - 03_Cx Draft Plan - 04.12.2021.zip ZIP file
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE COVER LETTER

AND

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

You’re Company Letterhead

Date: _________________

To: ______________________________________

We have listed your firm as a reference for the work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the Department of Veterans Affairs, Office of Construction & Facilities Management. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306(e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.

Please email your completed questionnaire to the following email address to arrive NOT LATER THAN <Add Due Date>.

Email response to: Alea.Barnes@va.gov

If you have questions regarding the attached questionnaire, or require assistance, please contact Alea Barnes, Contracting Officer at alea.barnes@va.gov.

Thank you for your assistance.

Signature and Title

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection.

Please complete this Questionnaire and return it via email to: Alea Barnes (Alea.Barnes@va.gov)

Desired Response Date: <Add Due Date>.

When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.

TO BE COMPLETED BY OFFEROR

1a. CONTRACTOR NAME & ADDRESS:

2. CONTRACT NO.:

3. CONTRACT AWARD DATE:

4. COMPLETION DATE:

5. CONTRACT VALUE (with options): $

1b. NAME OF PRIME CONTRACTOR (If this questionnaire is for a team member)

6. TYPE OF CONTRACT:

7. PROJECT TITLE, LOCATION, AND DESCRIPTION (AND TOTAL CONSTRUCTION VALUE AT PROJECT COMPLETION):

Please add a continuation page if additional space necessary.

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

E = Exceptional
S = Satisfactory
U = Unacceptable
G = Very Good
M = Marginal
N/O = Not Observed

A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

E G S M U N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

E G S M U N/O

C. Schedule – Assess the timeliness of contractor against the schedule of activities.

E G S M U N/O

D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

E G S M U N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

E G S M U N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.

E G S M U N/O

G. Overall Assessment.

E G S M U N/O

Comments (for any ratings of E, G, M, or U, please provide some brief comments about strengths & weaknesses you observed in this contractor that help us understand your rating. Feel free to provide additional pages if necessary):

File details come from the government source that posted it. Updated .