This document contains a pre-solicitation notice and questions and answers related to solicitation number 36C10F21R0017 for the Ft. Sam Houston National Cemetery Phase 3 Expansion project. The Department of Veterans Affairs seeks to develop approximately 50 acres for an additional 10 years of full-option burial capacity at the cemetery in San Antonio, Texas. The project scope includes developing over 35,000 gravesites, access roads, parking, grading, drainage, landscaping, buildings such as an honor guard building and storage facilities, irrigation and communication infrastructure upgrades, and security improvements. The estimated value is between $50-100 million. The solicitation is 100% set aside for Service-Disabled Veteran Owned Small Businesses. The response deadline was 24 April 2021 and award is anticipated in late FY21. The document also includes responses to questions clarifying requirements around earthwork quantities, site features, and receptacle models.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10F21R0017 A0002
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
05/03/2021
846-045 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 1425 Tri State Parkway, Suite 140 Gurnee IL 60031
101F Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 1425 Tri State Parkway, Suite 140 Gurnee IL 60031 To all Offerors/Bidders
36C10F21R0017 04-21-2021
X
TBD
Amendment 0002 contains the following:
1. Responses to PPI/RFQs
Alea Barnes Contracting Officer
VA-CFM-2019-579C284F
RFI SUBMISSSION LOG
SOLICITATION NUMBER 36C10F21R0017
PRE- PROPOSAL INQUIRY (PPI) FORM
FT SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION
| Question No. |
| Reference (Sect/Para/Page) |
| QUESTION |
| GOVERNMENT RESPONSE |
| 1 |
| Plans CG-112 and CG-113 |
| Based on our earthwork analysis on this project, we are showing a shortage of earthen material to construct the project to the lines and grades as shown. If there is in fact a shortage of earthen material, must earthen material be imported to construct the Future Expansion Area to the lines and grades shown, or may the lines and grades in this area be adjusted to make the overall site balance? |
| CAD files or earthwork calculations will not be provided. Responsibility for determining earthwork quantities lies solely with the offeror and there is no requirement to have earthwork calculations completed prior to the question deadline. Grading elevations were provided in the solicitation on 12 April 2021. The deadline for questions was 24 April 2021. Proposal submission is not due for another 13 days. With respect to CG-112 and CG-113, the intent of the future expansion area grading is to show that cut from the project area can be spread (if approved as suitable material by the geotech) at the Future Expansion Area up to the lines and grades shown. If there is a shortage of material, then additional fill will need to be brought in. The lines and grades of the Future Expansion Area cannot be adjusted to make the overall site balance as those are determined based on floodplain compliance with the site’s associated Letter of Map Revision application and eventual permit with FEMA/Floodplain Administrator. |
| In the Schedule for Finishes, the RB-36, https://victorstanley.com/product/rb-36, is called out for both the trash receptacle and for the flower vases but in the details on LF-501, the drawing look closer to the S-42, https://victorstanley.com/product/s-42/ and S-424, https://victorstanley.com/product/s-424/ models. I believe the receptacle are going to be matching existing items to other Sam Houston receptacles so I wanted to double check that the correct models were quoted for this portion of the project. Can you please confirm the correct models? |
| Trash and flower vase receptable models are as specified in the plans and specifications. If during the construction RFI and submittal process there is a need to change, those changes will be addressed during construction. |