Amendment Attachment 4 -- Mx Trailer temp IT Requirements.pdf
PDF 1 MB Posted
- Attached to
- Y1PC--Ft. Sam Houston Phase 3 Expansion Federal contract opportunity
- Solicitation number
- 36C10F21R0017
About this file
This pre-solicitation notice seeks proposals for a design-build-construction project to expand Fort Sam Houston National Cemetery in San Antonio, Texas. The Department of Veterans Affairs requires contractors to develop approximately 50 acres for 10 years of additional burial capacity, including over 23,000 full casket gravesites, nearly 10,000 cremation sites, and almost 9,000 columbarium niches. Additional requirements include access roads, parking, grading, drainage, landscaping, buildings such as an honor guard building and storage facilities, communications infrastructure, security systems, and repairs. The project duration is 810 calendar days with early turnover of a section by 365 days. The estimated value is between $50-100 million. The solicitation targets Service-Disabled Veteran Owned Small Businesses and will use best value tradeoff source selection. The point of contact is Alea Barnes and proposals are due in late FY2021.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G V
G V
G V
.1
Honor Guard
A d m in
B u il d in g
M a te ri a l S to ra g e
Equipment Storage
SD
SD SD SDSDSDSD SDSD
G
G
G
T
T
T
N O
T E
D A
S A
B A
N D
O N
E D
U G
T ( N
O V
I S A
B L E
E V
ID
E
N C
E
T
T
GATE
PAVED PARKING
OHE / OT
(F
IE
L D
V E R
IF
IE
D
4"
GAS
G A S
G A S
G A S
G A S
8"
GAS
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
SECTION 73SECTION 72SECTION 71
SECTION 55SECTION 54
SECTION 53
SECT I ON 46
SECT I ON 47
SECT I ON 48
SECTION 75
SECTION 66SECTION 65
SECTION 64SECTION 63
SECTION 62
SECTION 57
SECTION 56
SECTION 52SECTION 51
SECTION 50
SECT I ON 49
BURI AL
SECT I ON 4 9
BURI AL
SECT I ON 50
BURI AL
SECT I ON 14A
BURI AL
SECT I ON MA3
BURI AL
SECT I ON AI
BURI AL
SECT I ON 4 6
BURI AL
SECT I ON 4 7
BURI AL
SECT I ON 4 8
BURI AL
SECT I ON 45
BURI AL
SECT I ON 44
BURI AL
SECT I ON 43
BURI AL
SECT I ON 42
BURI AL
SECT I ON 32
BURI AL
SECT I ON 35
BURI AL
SECT I ON 38
BURI AL
SECT I ON 41
BURI AL
SECT I ON 40
BURI AL
SECT I ON 37
BURI AL
SECT I ON 34
BURI AL
SECT I ON 31
BURI AL
SECT I ON 29
BURI AL
SECT I ON 30
BURI AL
SECT I ON 28
BURI AL
SECT I ON 26
BURI AL
SECT I ON 25
BURI AL
SECT I ON 39
BURI AL
SECT I ON 36
BURI AL
SECT I ON 33
BURI AL
SECT I ON 27
BURI AL
SECT I ON 23
BURI AL
SECT I ON 24
BURI AL
SECT I ON 15
BURI AL
SECT I ON 17
BURI AL
SECT I ON 12
BURI AL
SECT I ON 11
BURI AL
SECT I ON 12A
BURI AL
SECT I ON 11A
BURI AL
SECT I ON 16
BURI AL
SECT I ON 14A
BURI AL
SECT I ON 10
BURI AL
SECT I ON 9
BURI AL
SECT I ON 14
BURI AL
SECT I ON 1 3A
BURI AL
SECT I ON 13
BURI AL
SECT I ON 8A
BURI AL
SECT I ON 8
BURI AL
SECT I ON U
BURI AL
SECT I ON T
BURI AL
SECT I ON S
BURI AL
SECT I ON R
BURI AL
SECT I ON Q
BURI AL
SECT I ON M
BURI AL
SECT I ON L
BURI AL
SECT I ON K
BURI AL
SECT I ON N
BURI AL
SECT I ON O
BURI AL
SECT I ON H
BURI AL
SECT I ON I
BURI AL
SECT I ON PG
BURI AL
SECT I ON PH
BURI AL
SECT I ON PI
BURI AL
SECT I ON PD
BURI AL
SECT I ON PE
BURI AL
SECT I ON PF
BURI AL
SECT I ON 2D
BURI AL
SECT I ON Z A
BURI AL
SECT I ON E
BURI AL
SECT I ON F
BURI AL
SECT I ON P
BURI AL
SECT I ON J
BURI AL
SECT I ON G
BURI AL
SECT I ON D
BURI AL
SECT I ON A
BURI AL
SECT I ON B
BURI AL
SECT I ON C
BURI AL
SECT I ON MA
BURI AL
SECT I ON Y
BURI AL
SECT I ON 2C
BURI AL
SECT I ON 2B
BURI AL
SECT I ON X
BURI AL
SECT I ON Z
BURI AL
SECT I ON 2A
BURI AL
SECT I ON W
BURI AL
SECT I ON V
BURI AL
SECT I ON 7
BURI AL
SECT I ON 5
BURI AL
SECT I ON 3
BURI AL
SECT I ON 2
BURI AL
SECT I ON 1
BURI AL
SECT I ON 22
BURI AL
SECT I ON AJ
BURI AL
SECT I ON AJBURI AL
SECT I ON AH
BURI AL
SECT I ON AH
BURI AL
SECT I ON AG
BURI AL
SECT I ON AD
BURI AL
SECT I ON PC
BURI AL
SECT I ON PA
BURI AL
SECT I ON AC
BURI AL
SECT I ON PB
BURI AL
SECT I ON AB
BURI AL
SECT I ON AA
BURI AL
SECT I ON 2S
S
S
S
S
MH
MH
S
MH
MH
MH
MH
LP
S
MH
MH
MH
MH
S
S
S
M H
M H
M H
S
S
SSS
M H M H
S
MH
MH
LP
LP
LP
LP
LP S
MH
LP
LP
LPL PL P
S
L P
L P
L P
L P
M H
T L
S
L P
L P
DI
DI
L O
L OL O
L O
L O
L O
L O
L O
DI
DI
DI
DI
L O L O
L O
L O
L O
L O
L O
L O
L O
L OL O
L O
DIDI
L O
L O
L O
L OL O
L OL O L OL O L O
L O
D I
D I
L O L O
L O
L O
D I D I
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
DI
LO
LO
L O
L O
L O
L O
L O
TREE LINE
TREE LINE
T R
E E
L
IN
E
T R
E E
L
IN
E
T R
E E
L
IN
E
TR
E
E LIN
E
T R
E
E LIN
E
TREE LINE
M O
W
LI N
E
G R A V E L
MAINTENANCE
BUILDING
MATERIAL
STORAGE
BUILDING
MAINTENANCE
BUILDING
CONSTRUCT ION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCTION FENCE
CONSTRUCTION FENCE
CONSTRUCTION FENCE
CONSTRUCT
ION FE
NCE
CONSTRUCT ION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCTION FENCE
C O
N
ST
R U
CT
IO
N F
E
NC
E
CONSTRUCTION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCTION FENCE
CONSTRUCTION FENCE
TREE LINE
TREE LINE TREE LINE
T
PBX
CO
CO
CO
CO
CO
CO
CO
CO CO
CO CO
CO
COCO CO
CO
CO
CO
CO
CO
COCO
CO
CO
CO
CO
NEW RESTROOM
BUILDING
FF=675.60
SECTION 58
SECTION 58
SECTION 59
SECTION 59
SECTION 60
SECTION 60
SECTION 61
SECTION 61
SECTION 67 SECTION 68 SECTION 69 SECTION 70
PPC
PPC
PPC
PPC
PPC
PPC
PPC
PPC
PPC PPC PPC PPC
H A
R R
Y W
U R
Z B
A C
H R
D
WINANS RD
SAM HOUSTON
BLVD
S A
M H
O U
S T
O N
C
IR
C L E
FFE = 720.7
Honor Guard
G V
G V
G V
.1
Honor Guard
A d m in
B u il d in g
M a te ri a l S to ra g e
Equipment Storage
SD
SD SD SDSDSDSD SDSD
G
G
G
T
T
T
N O
T E
D A
S A
B A
N D
O N
E D
U G
T ( N
O V
I S A
B L E
E V
ID
E
N C
E
T
T
GATE
PAVED PARKING
OHE / OT
(F
IE
L D
V E R
IF
IE
D
4"
GAS
G A S
G A S
G A S
G A S
8"
GAS
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
SECTION 73SECTION 72SECTION 71
SECTION 55SECTION 54
SECTION 53
SECT I ON 46
SECT I ON 47
SECT I ON 48
SECTION 75
SECTION 66SECTION 65
SECTION 64SECTION 63
SECTION 62
SECTION 57
SECTION 56
SECTION 52SECTION 51
SECTION 50
SECT I ON 49
BURI AL
SECT I ON 4 9
BURI AL
SECT I ON 50
BURI AL
SECT I ON 14A
BURI AL
SECT I ON MA3
BURI AL
SECT I ON AI
BURI AL
SECT I ON 4 6
BURI AL
SECT I ON 4 7
BURI AL
SECT I ON 4 8
BURI AL
SECT I ON 45
BURI AL
SECT I ON 44
BURI AL
SECT I ON 43
BURI AL
SECT I ON 42
BURI AL
SECT I ON 32
BURI AL
SECT I ON 35
BURI AL
SECT I ON 38
BURI AL
SECT I ON 41
BURI AL
SECT I ON 40
BURI AL
SECT I ON 37
BURI AL
SECT I ON 34
BURI AL
SECT I ON 31
BURI AL
SECT I ON 29
BURI AL
SECT I ON 30
BURI AL
SECT I ON 28
BURI AL
SECT I ON 26
BURI AL
SECT I ON 25
BURI AL
SECT I ON 39
BURI AL
SECT I ON 36
BURI AL
SECT I ON 33
BURI AL
SECT I ON 27
BURI AL
SECT I ON 23
BURI AL
SECT I ON 24
BURI AL
SECT I ON 15
BURI AL
SECT I ON 17
BURI AL
SECT I ON 12
BURI AL
SECT I ON 11
BURI AL
SECT I ON 12A
BURI AL
SECT I ON 11A
BURI AL
SECT I ON 16
BURI AL
SECT I ON 14A
BURI AL
SECT I ON 10
BURI AL
SECT I ON 9
BURI AL
SECT I ON 14
BURI AL
SECT I ON 1 3A
BURI AL
SECT I ON 13
BURI AL
SECT I ON 8A
BURI AL
SECT I ON 8
BURI AL
SECT I ON U
BURI AL
SECT I ON T
BURI AL
SECT I ON S
BURI AL
SECT I ON R
BURI AL
SECT I ON Q
BURI AL
SECT I ON M
BURI AL
SECT I ON L
BURI AL
SECT I ON K
BURI AL
SECT I ON N
BURI AL
SECT I ON O
BURI AL
SECT I ON H
BURI AL
SECT I ON I
BURI AL
SECT I ON PG
BURI AL
SECT I ON PH
BURI AL
SECT I ON PI
BURI AL
SECT I ON PD
BURI AL
SECT I ON PE
BURI AL
SECT I ON PF
BURI AL
SECT I ON 2D
BURI AL
SECT I ON Z A
BURI AL
SECT I ON E
BURI AL
SECT I ON F
BURI AL
SECT I ON P
BURI AL
SECT I ON J
BURI AL
SECT I ON G
BURI AL
SECT I ON D
BURI AL
SECT I ON A
BURI AL
SECT I ON B
BURI AL
SECT I ON C
BURI AL
SECT I ON MA
BURI AL
SECT I ON Y
BURI AL
SECT I ON 2C
BURI AL
SECT I ON 2B
BURI AL
SECT I ON X
BURI AL
SECT I ON Z
BURI AL
SECT I ON 2A
BURI AL
SECT I ON W
BURI AL
SECT I ON V
BURI AL
SECT I ON 7
BURI AL
SECT I ON 5
BURI AL
SECT I ON 3
BURI AL
SECT I ON 2
BURI AL
SECT I ON 1
BURI AL
SECT I ON 22
BURI AL
SECT I ON AJ
BURI AL
SECT I ON AJBURI AL
SECT I ON AH
BURI AL
SECT I ON AH
BURI AL
SECT I ON AG
BURI AL
SECT I ON AD
BURI AL
SECT I ON PC
BURI AL
SECT I ON PA
BURI AL
SECT I ON AC
BURI AL
SECT I ON PB
BURI AL
SECT I ON AB
BURI AL
SECT I ON AA
BURI AL
SECT I ON 2S
S
S
S
S
MH
MH
S
MH
MH
MH
MH
LP
S
MH
MH
MH
MH
S
S
S
M H
M H
M H
S
S
SSS
M H M H
S
MH
MH
LP
LP
LP
LP
LP S
MH
LP
LP
LPL PL P
S
L P
L P
L P
L P
M H
T L
S
L P
L P
DI
DI
L O
L OL O
L O
L O
L O
L O
L O
DI
DI
DI
DI
L O L O
L O
L O
L O
L O
L O
L O
L O
L OL O
L O
DIDI
L O
L O
L O
L OL O
L OL O L OL O L O
L O
D I
D I
L O L O
L O
L O
D I D I
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
LO
DI
LO
LO
L O
L O
L O
L O
L O
TREE LINE
TREE LINE
T R
E E
L
IN
E
T R
E E
L
IN
E
T R
E E
L
IN
E
TR
E
E LIN
E
T R
E
E LIN
E
TREE LINE
M O
W
LI N
E
G R A V E L
MAINTENANCE
BUILDING
MATERIAL
STORAGE
BUILDING
MAINTENANCE
BUILDING
CONSTRUCT ION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCTION FENCE
CONSTRUCT ION FENCE
CONSTRUCT ION FENCE
CONSTRUCT
ION FE
NCE
CONSTRUCT ION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCT ION FENCE
C O
N
ST
R U
CT
IO
N F
E
NC
E
CONSTRUCTION FENCE
C O
N S
T R
U
CT
IO
N
F E
N C
E
CONSTRUCT ION FENCE
CONSTRUCT ION FENCE
TREE LINE
TREE LINE TREE LINE
T
PBX
CO
CO
CO
CO
CO
CO
CO
CO CO
CO CO
CO
COCO CO
CO
CO
CO
CO
CO
COCO
CO
CO
CO
CO
NEW RESTROOM
BUILDING
FF=675.60
SECTION 58
SECTION 58
SECTION 59
SECTION 59
SECTION 60
SECTION 60
SECTION 61
SECTION 61
SECTION 67 SECTION 68 SECTION 69 SECTION 70
PPC
PPC
PPC
PPC
PPC
PPC
PPC
PPC
PPC PPC PPC PPC
H A
R R
Y W
U R
Z B
A C
H R
D
WINANS RD
SAM HOUSTON
BLVD
S A
M H
O U
S T
O N
C
IR
C L E
FFE = 720.7
Honor Guard
MAINTENANCE
BUILDING
MD
MD
CSS
CSS
CSS
IKP
CR1
CSS
SIR
LP
CSS
IK
P
MD
S
IR
PW-HH-1
PW-HH-1
PW-HH-1
PW-HH-1
PW-HH-1
PW-HH-1
PW-HH-1
PUBLIC INFORMATION
CENTER (PIC)
HONOR
GUARD
STORAGE BUILDING
EXISTING UNDERGROUND
CONDUIT PATHWAY
(2) 2" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(1) 2" UNDERGROUND
CONDUITS 2
PUMP HOUSE
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
(2) 4" UNDERGROUND
CONDUITS 2
ADMINISTRATION
BUILDING
MAINTENANCE
BUILDING
(2) 4" UNDERGROUND
CONDUITS 2
EXISTING UNDERGROUND
PATHWAY, FIBER, AND COPPER.
(B)
(A)
(C)
(S)
(U)
(R)
(Q)
TEMP TRAILER
EQUIPMENT STORAGE
E3007.30
E1003.30
E3010.10
E1002.30
1 E1001.30
ES-101
ES-101
PW-HH-1(D)1
PW-HH-1(E)1 PW-HH-1(F) 1 PW-HH-1(G) 1
PW-HH-1
PW-HH-1 PW-HH-1
PW-HH-1
PW-HH-1(N) 1
(M)
(L)1(K)
1(H)
PW-HH-1(P)1
(2) 4" UNDERGROUND
CONDUITS 2
PW-HH-11 (I) PW-HH-1 1(J)
PW-HH-1(O)1
PW-HH-11 (T)
CONTRACTOR SHALL FIELD VERIFY
ROUTING BETWEEN HANDHOLE (I)
AND HANDHOLE (J). CONDUITS WILL
ROUTE ABOVE GROUND ALONG THE
WALL OF THE BRIDGE IN CONDUIT.
REFER TO THE SPECIFICATIONS
FOR TRANSITION REQUIREMENTS
(UNDERGROUND TO ABOVE
GROUND) AND ADDITIONAL
MOUNTING REQUIREMENTS.
(1) 2" UNDERGROUND
CONDUIT TO
TEMPORARY TRAILER.
TEMP TRAILER
SECURITY PANEL
NOTES:
1. ALL SECURITY CABLING FOR THIS BUILDING WILL ROUTE TO THE SECURITY PANEL.
2. ALL SECURITY CABLING WILL ROUTE IN CONDUIT FROM THE EDGE DEVICE BACK TO THE
SECURITY PANEL. MAINTAIN CONDUIT FILLS NO MORE THAN 40% WHEN CHAINING DEVICES
TOGETHER. NETWORK CABLING (CATEGORY 6) SHALL NOT ROUTE WITH MULTI-CONDUCTOR
CABLING.
KEYNOTES:
1. COORDINATE WITH THE LOCAL RE FOR THE FINAL LOCATION OF THE SECURITY PANEL PRIOR
TO THE PURCHASE AND INSTALLATION OF THE SECURITY PANEL. SECURITY PANEL WILL BE
SIZED TO SUPPORT ALL ACCESS CONTROL, INTRUSION, AND VIDEO SURVEILLANCE
EQUIPMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. (1) 2" CONDUIT FROM THE SECURITY PANEL TO THE HANDHOLE OUTSIDE THE BUILDING TO
PW-HH-1 (A) LOCATED OUTSIDE THE MAINTENANCE BUILDING. REFER TO 1/ES-001 FOR
LOCATION OF THE HANDHOLE. CONDUIT IS RESERVED FOR BACKBONE CABLING ONLY. REFER
TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. REFER TO 3/ES-101 FOR THE ELEVATION AND ADDITIONAL INFORMATION FOR THE SECURITY
PANEL.
4. CONTRACTOR TO PROVIDE HARDWARE GROUP HW8 PER DOOR HARDWARE SECTION 08 71 00
FOR CARD READER LOCATION AT EXISTING DOOR. MODIFY DOOR AND FRAME AS REQUIRED
TO INSTALL.
3+48"
CM-3
SB-1
+96"
NOTES:
1. THE ABOVE LAYOUT FOR THE SECURITY PANEL IS DIAGRAMMATIC AND DOES NOT REPRESENT THE FINAL LAYOUT.
THE SECURITY CONTRACTOR SHALL PROVIDE A FINAL LAYOUT OF THE PANEL DURING THE SHOP DRAWING
PROCESS TO VERIFY THE SIZE OF THE SECURITY PANEL.
2. THE SECURITY CABINET AND SC-CPP-1 SHALL BE GROUNDED PER THE NEC AS REQUIRED. REFER TO THE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES:
1. CONDUIT TO THE HH-1 (A). REFER TO 2/ES-001 FOR ADDITIONAL INFORMATION.
2. FIBER WILL EXTEND THROUGH THE 2" CONDUIT WITH THE COPPER BACKBONE CABLE. REFER TO 1/E-400 FOR
ADDITIONAL INFORMATION.
3. VIDEO SURVEILLANCE IS SERVED OUT OF THE DATA ROOM IN THE P.I.C. BUILDING AND EXTENDED OVER FIBER.
CONTRACTOR SHALL PROVIDE A MEDIA CONVERTER TO EXTEND THE NETWORK CONNECTIVITY FROM THE MAINTENANCE BUILDING TO THE P.I.C. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
FLOOR
SC-FDC-3
SECURITY PANEL
ACCESS CONTROL &
INTRUSION PANEL(S)
POWER SUPPLIES
VIDEO SURVEILLANCE
FIBER EXTENDERS
SC-CPP-1
2" CONDUIT
2" CONDUIT
NOTES:
1. THE ABOVE LAYOUT FOR THE SECURITY PANEL IS DIAGRAMMATIC AND DOES NOT
REPRESENT THE FINAL LAYOUT. THE SECURITY CONTRACTOR SHALL PROVIDE A
FINAL LAYOUT OF THE PANEL DURING THE SHOP DRAWING PROCESS TO VERIFY
THE SIZE OF THE SECURITY PANEL.
2. THE SECURITY CABINET AND SC-CPP-1 SHALL BE GROUNDED PER THE NEC AS
REQUIRED. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES:
1. CONDUIT TO THE HH-1 (A). REFER TO 2/ES-001 FOR ADDITIONAL INFORMATION.
2. FIBER WILL EXTEND THROUGH THE 2" CONDUIT WITH THE COPPER BACKBONE
CABLE. REFER TO 1/E-400 FOR ADDITIONAL INFORMATION.
3. VIDEO SURVEILLANCE IS SERVED OUT OF THE DATA ROOM IN THE P.I.C. BUILDING
AND EXTENDED OVER FIBER. CONTRACTOR SHALL PROVIDE A MEDIA CONVERTER
TO EXTEND THE NETWORK CONNECTIVITY FROM THE MAINTENANCE BUILDING TO
THE P.I.C. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
FLOOR
SC-FDC-3
SECURITY PANEL
ACCESS CONTROL &
INTRUSION PANEL(S)
POWER SUPPLIES
VIDEO SURVEILLANCE
FIBER EXTENDERS
SC-CPP-1
2" CONDUIT
2" CONDUIT
+48"
SECURITY PANEL
CM-1
PH-1
10'-0"
+96"
KEY MAP N.T.S.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
846CM2045
Project Director
12-18-2020Revisions: Date:
VA FORM 08 - 6231
F ile
P a th
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
B
C
D
E
F
CONSULTANTS
12.18.2020
12/18/2020
BID DOCUMENTS
GEOTECHNICAL:
TERRACON
6911 BLANCO ROAD
SAN ANTONIO, TX 78216
210-641-2112
MICHAEL GHAZAWI
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
CPMI
3265 NORTHWOOD CIR
EAGAN, MN 55121
515-697-1048
BRYAN BERTRAND
LAND SURVEY:
PAPE-DAWSON
2000 NW LOOP 410
SAN ANTONIO, TX 78213
210-326-6141
DAVID CASANOVA
STRUCTURAL/MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
WADE ROSS 15274
TECHNOLOGY SITE PLAN
ES-101
JAYDAVLAR
N O R
HT
1" = 200'-0"
SITE PLAN - TECHNOLOGY
SHEET NOTES:
1. REFER TO 1/E-400 FOR FIBER AND COPPER BACKBONE
CONNECTIVITY AND INSTALLATION REQUIREMENTS.
2. PROVIDE A MINIMUM OF 20' COPPER/FIBER SERVICE LOOP IN
EVERY HANDHOLE PW-HH-1 AS SHOWN ON THIS PLAN.
3. THE CONTRACTOR SHALL SUBMIT A FINALIZED ROUTING PLAN
FOR REVIEW DURING THE SUBMITTAL PROCESS. THE
FINALIZED ROUTING SHALL INCLUDE TRANSITIONS (ABOVE
GROUND/UNDERGROUND), EARTHWORK REQUIREMENTS (I.E
TRENCHING, DIRECTIONAL BORING, ETC.), FINALIZED ROUTING
AND HANDHOLE LOCATIONS.
KEYNOTES:
1. HANDHOLE WILL BE SIZED TO SUPPORT THE FIBER AND
COPPER BACKBONE CABLING. REFER TO THE SPECIFICATIONS
FOR ADDITIONAL INFORMATION AND INSTALLATION
REQUIREMENTS.
2. PROVIDE (2) 3-CELL MAXCELL INNERDUCT IN EACH CONDUIT TO
SUPPORT UP TO 6-CELLS WORTH OF BACKBONE CABLING IN
EACH CONDUIT FOR NEW AND FUTURE CABLING. EACH
BACKBONE CABLE (FIBER AND COPPER) WILL UTILIZE A
DEDICATED CELL.
3. CONTRACTOR SHALL INTERCEPT THE EXISTING PATHWAY
BETWEEN THE ADMINISTRATION BUILDING TO THE
MAINTENANCE BUILDING. COORDINATE WITH THE RESIDENT
ENGINEER (RE) ON THIS CONNECTION AND ANY DOWNTIME AS A
RESULT OF THIS INTERCEPTION PRIOR TO INSTALLATION.
4. CONTRACTOR SHALL BRING THE UNDERGROUND CONDUITS TO
THE TEMPORARY TRAILER TO CONNECT TEMPORARY FIBER TO
THE TRAILERS. ONCE THE TRAILERS HAVE BEEN REMOVED,
CONTRACTOR SHALL EXTEND THE CONDUITS TO THE
EQUIPMENT STORAGE AND PULL IN NEW FIBER. REFER TO
1/E-400 FOR ADDITIONAL INFORMATION.
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.
14755 PRESTON ROAD, SUITE 845
DALLAS, TX 75254
972.239.6100 FAX: 972.239.6102
www.imegcorp.com
TBPE# F-18632
17001048.07
N O R
HT
1/8" = 1'-0"
MAINTENANCE BUILDING - SECURITY
NO SCALE
MAINTENANCE BUILDING - PANEL ELEVATION
NO SCALE
PUMP HOUSE - PANEL ELEVATION
N O R
HT
1/8" = 1'-0"
PUMP HOUSE - SECURITY
NOTES:
1. ALL SECURITY CABLING FOR THIS BUILDING WILL ROUTE TO
THE SECURITY PANEL.
2. ALL SECURITY CABLING WILL ROUTE IN CONDUIT FROM THE
EDGE DEVICE BACK TO THE SECURITY PANEL. MAINTAIN
CONDUIT FILLS NO MORE THAN 40% WHEN CHAINING DEVICES
TOGETHER. NETWORK CABLING (CATEGORY 6) SHALL NOT
ROUTE WITH MULTI-CONDUCTOR CABLING.
KEYNOTES:
1. COORDINATE WITH THE LOCAL RE FOR THE FINAL LOCATION
OF THE SECURITY PANEL PRIOR TO THE PURCHASE AND
INSTALLATION OF THE SECURITY PANEL. SECURITY PANEL
WILL BE SIZED TO SUPPORT ALL ACCESS CONTROL,
INTRUSION, AND VIDEO SURVEILLANCE EQUIPMENT. REFER TO
XXX FOR ADDITIONAL INFORMATION.
2. (1) 2" CONDUIT FROM THE SECURITY PANEL TO THE HANDHOLE
OUTSIDE THE BUILDING TO PW-HH-1 (K) LOCATED OUTSIDE THE
MAINTENANCE BUILDING. REFER TO 1/ES-001 FOR LOCATION
OF THE HANDHOLE. CONDUIT IS RESERVED FOR BACKBONE
CABLING ONLY. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
3. REFER TO 5/ES-101 FOR THE ELEVATION AND ADDITIONAL
INFORMATION FOR THE SECURITY PANEL.
4. DOOR CONTACT CONNECTS TO THE INTRUSION SYSTEM ONLY.
REFER TOSPECIFICATIONS FOR ADDITIONAL INFORMATION
AND CONNECTIVITY REQUIREMENTS.
Dwg. 301 of 339
1 Addendum #1 4/26/2021
SC-CPP-1
SC-VPP-1
OWNER
PROVIDED
EQUIPMENT
SC-FDC-1
SC-CPP-1
SC-FDC-3
SC-CPP-1
SC-VPP-1
OWNER
PROVIDED
EQUIPMENT
SC-FDC-2
SC-CPP-1
OWNER
PROVIDED
EQUIPMENT
SC-FDC-3
SC-CPP-1
SC-FDC-3
SC-CSC-1
SC-FSC-1
SC-CPP-1
SC-VPP-1
OWNER
PROVIDED
EQUIPMENT
SC-FDC-2
SC-CPP-1
SC-VPP-1
OWNER
PROVIDED
EQUIPMENT
SC-FDC-2
SC-CSC-1
SC-FSC-1
SC-CPP-1
SECURITY
EQUIPMENT
SC-FDC-3
SECURITY
EQUIPMENT
SECURITY
EQUIPMENT
SC-CSC-1
SC-FSC-1
SC-CSC-1
SC-FSC-1
SC-CSC-1
SC-FSC-1
SC-CPP-1
SC-FDC-3
OWNER
PROVIDED
EQUIPMENT
SC-MPP-1
OWNER
PROVIDED
NETWORK
EQUIPMENT
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR
CLARIFICATION OF CONNECTION(S), LOCATIONS AND CABLE TYPE. ALL INFORMATION OUTLETS ARE TYPICAL OF THE OUTLETS IN THE AREA SHOWN. REFER TO FLOOR PLANS FOR MORE SPECIFIC ROUTING INFORMATION. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. REFER TO FLOOR PLANS FOR QUANTITY OF CABLES AND JACKS TO BE INSTALLED AT EACH INFORMATION OUTLET.
3. VIDEO SURVEILLANCE CAMERAS WILL BE CONNECTED TO RESIDENT ENGINEER/COR PROVIDED NETWORK SWITCHES. CONTRACTOR IS
RESPONSIBLE TO PROVIDE RESIDENT ENGINEER/COR LIST OF IP ADDRESSES AND ASSIST WITH PROGRAMING OF CAMERAS.
4. ALL FIBER OPTIC CABLES SHALL TERMINATE ON LC CONNECTORS. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES:
1. PROVIDE A MINIMUM OF 15' COIL SLACK LOOP FOR BOTH FIBER AND COPPER IN THE HANDHOLE.
2. 100-PAIR, CATEGORY 3, OSP, COPPER BACKBONE CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3. 50-PAIR, CATEGORY 3, OSP, COPPER BACKBONE CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. 25-PAIR, CATEGORY 3, OSP, COPPER BACKBONE CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. 24-STRAND, SINGLE MODE, OS2, OUTDOOR RATED, ARMORED, FIBER OPTIC CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
6. 12-STRAND, SINGLE MODE, OS2, OUTDOOR RATED, ARMORED, FIBER OPTIC CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
7. 6-STRAND, SINGLE MODE, OS2, OUTDOOR RATED, ARMORED, FIBER OPTIC CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
8. CONTRACTOR PROVIDED AND INSTALLED 25-PAIR COPPER PATCH CORD FROM THE LIGHTING PROTECTION PANEL TO THE 110-BLOCK.
9. CONTRACTOR PROVIDED AND INSTALLED FIBER PATCH CABLE.
10. REFER TO 2/E-400 FOR VOICE AND DATA HORIZONTAL CABLING REQUIREMENTS.
11. COPPER PROTECTION PANEL IS TYPICAL OF THE CONNECTIONS TO THIS POINT. PROVIDE AND INSTALL ADDITIONAL COPPER PROTECTION
PANELS AS REQUIRED.
12. COORDINATE WITH THE RESIDENT ENGINEER (RE) FOR CONNECTION AND PHASING REQUIREMENTS TO THE TEMPORARY TRAILERS PRIOR TO
INSTALLATION.
ADMINISTRATION BUILDING
SECURITY PANEL IN EQUIPMENT
STORAGE. REFER TO 4/E3010.10
FOR ADDITIONAL INFORMATION.
MAINTENANCE BUILDING
TEMP TRAILER
PW-HH-1(R)
PUBLIC INFORMATION
CENTER (PIC)
HONOR GUARD
PW-HH-1(B) 1
SECURITY PANEL IN MAINTENANCE
BUILDING. REFER TO 2/ES-101 FOR
ADDITIONAL INFORMATION.
(STORAGE BUILDING)
PW-HH-1(A)
PW-HH-1(H)
PW-HH-1(J)
PW-HH-1(I)
PW-HH-1(D)
7 7
EXISTING FIBER
OPTIC CABLE
EXISTING COPPER BACKBONE
PW-HH-1(U)
SECURITY PANEL IN PUMP HOUSE.
REFER TO 4/ES-101 FOR ADDITIONAL
INFORMATION.
PW-HH-1(N)
PW-HH-1(M)
PW-HH-1(L)
PW-HH-1(K)
PW-HH-1(G)
PW-HH-1(F)
PW-HH-1(E)
PW-HH-1(O)
PW-HH-1(P)
PW-HH-1(B) 1
PW-HH-1(T)
EXISTING COPPER
BACKBONE
EXISTING FIBER
OPTIC CABLE
PW-HH-1(S)
TEMP TRAILER
TYPICAL DATA CLOSET
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS
SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CABLE TYPE. ALL INFORMATION OUTLETS ARE TYPICAL OF THE OUTLETS IN THE AREA SHOWN. REFER TO FLOOR PLANS FOR MORE SPECIFIC ROUTING AND QUANTITY INFORMATION.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
KEYNOTES:
1. CATEGORY 6A PLENUM RATED HORIZONTAL CABLE. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REFER TO THE INFORMATION OUT SCHEDULE ON E403 AND THE FLOOR PLANS FOR THE QUANTITY OF CABLES AND JACKS
TO BE INSTALLED AT EACH LOCATION.
3. OWNER PROVIDED AND INSTALLED COPPER PATCH CABLE.
4. OWNER PROVIDED AND INSTALLED FIBER PATCH CABLE.
5. REFER TO 1/E-400 FOR THE FIBER CABINET TO BE INSTALLED AT EACH CABLE ROOM.
6. REFER TO 1/E-400 FOR THE FIBER CABINET REQUIREMENTS.
C#
C#
FIBER CABINET
KEY MAP N.T.S.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
846CM2045
Project Director
12-18-2020Revisions: Date:
VA FORM 08 - 6231
F ile
P a th
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
B
C
D
E
F
CONSULTANTS
12.18.2020
12/18/2020
BID DOCUMENTS
GEOTECHNICAL:
TERRACON
6911 BLANCO ROAD
SAN ANTONIO, TX 78216
210-641-2112
MICHAEL GHAZAWI
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
CPMI
3265 NORTHWOOD CIR
EAGAN, MN 55121
515-697-1048
BRYAN BERTRAND
LAND SURVEY:
PAPE-DAWSON
2000 NW LOOP 410
SAN ANTONIO, TX 78213
210-326-6141
DAVID CASANOVA
STRUCTURAL/MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
WADE ROSS 15274
TECHNOLOGY & SECURITY
DIAGRAMS
E-400
JAYDAVLAR
REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2020 IMEG CORP.
14755 PRESTON ROAD, SUITE 845
DALLAS, TX 75254
972.239.6100 FAX: 972.239.6102
www.imegcorp.com
TBPE# F-18632
17001048.07
NO SCALE
BACKBONE FIBER AND COPPER CONNECTIVITY DIAGRAM
1 NO SCALE
TYPICAL VOICE AND NETWORK CABLING DIAGRAM
Dwg. 293 of 339
1 Addendum #1 4/26/2021
| ES-101 - TECHNOLOGY SITE PLAN |
| E-400 - TECHNOLOGY & SECURITY DIAGRAMS |
File details come from the government source that posted it. Updated .