Attachment 8 Geothermal Drawings Project MTZ.pdf
PDF 14 MB Posted
- Attached to
- Y1LZ--36C26124R0004 | Project 612-23-003 | Design Build, Create Martinez Parking Lot and Access
- Solicitation number
- RFP36C26124R0004
About this file
This document provides details on a federal contract opportunity for design-build services. The solicitation is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 to design and construct a new parking lot and access road at the Martinez VA Medical Center in California. Offerors are to submit proposals in response to RFP number 36C26124R0004 by the deadline of April 15, 2023. The contract resulting from this solicitation will have a period of performance from the date of award through project completion anticipated for January 2025. The estimated value of this design-build contract is between $5-10 million. The opportunity is open to all responsible sources and has no set-aside provisions. An attachment with relevant geothermal drawings for the project is provided to assist offerors in preparation of their proposals.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
meline
P.O. Box 276665 Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958 email: lisa@meline.com
Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958
NOTES :
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958 email: lisa@meline.com
°F WATER
FROM DHW
BOILERS.
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
Sacramento, CA 95827 ph: 916.366.3458
DEVICE MOUNTING SCHEDULE
LA
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779
ELECTRICAL CONSULTANTS
OVERALL POWER PLAN
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
PARTIAL ROOF DEMO PLANPARTIAL ROOF DEMO PLAN
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
PARTIAL ROOF POWER PLANPARTIAL ROOF POWER PLAN
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779
ELECTRICAL CONSULTANTS
ITEM NO. QTY DESCRIPTION MANUFACTURER / MODEL VOLTS PH LOAD (FLA) LOAD (VA)
CIRCUIT
DESIGNATION
CONDUCTORS CONDUIT
AHU-1 1 ROOF TOP AIR HANDLING UNIT 460 3 61.0 50714 EDPA 3#4, #8G (E) 3"C
AHU-2 1 ROOF TOP AIR HANDLING UNIT 460 3 61.0 50714 EDPA 3#4, #8G (E) 3"C
AHU-3 1 ROOF TOP AIR HANDLING UNIT 460 3 55.0 45726 EDPA 3#4, #8G (E) 2"C
AHU-4 1 ROOF TOP AIR HANDLING UNIT 460 3 92.0 76487 MSB 3#2/0, #6G (E) 4"C
WHP-1 1 ROOF TOP HEAT RECOVERY 460 3 52.0 43232 EDPA 3#6, #8G 1"
P-6 1 ROOF TOP PUMP 460 3 4.8 3991 EDPA 3#12, #12G 3/4"
NOTES:
1. PROVIDE WEATHER PROOF, NEMA-3R ENCLOSURES FOR ALL DISCONNECT SWITCHES.
2. PROVIDED W/ FACTORY WIRED AND INSTALLED VFDS FOR RETURN AND SUPPLY FANS.
BUILDING 20 - MECHANICAL EQUIPMENT SCHEDULE
MECHANICAL BLDG LIGHTING PLAN
B U
I L
D I
N G
B U
I L
D I
N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B
LD
G
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Fence
Fence
Area Under Construction
Fe nc e
C on cr et e V al le y G ut te r
Concrete Curb, Gutter & Sidewalk
AC Paving
C oncrete C urb, G utter & Sidew alk
Wall
Wall
Fence w\Concrete
Wall
Wall
AC
Paving
Campus Drive
C am pus D rive
E-Cab
E-Cab
E-C ab
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
SHED
B U I L D I N G
B U
I L
D I
N G
BUILDING
Dock
Trash
Concrete
Overhang w\Columns
Stairs
C on cr et e
AC Parking Lot
Concrete
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
B U I L D I N G
Shed
AC Parking Lot
AC Parking Lot
AC Parking Lot
AC Parking Lot
AC Parking Lot
AC Parking Lot
AC Parking Lot
AC Parking Lot
W ood Ram p W ood Ram p
W ood Ram p
Is la nd
Is la nd
Is la nd
Is la nd
Is la nd
So la r P an el C ol um n( Ty pi ca l)
So la r P an el C ol um n( Ty pi ca l)
So la r P an el C ol um n( Ty pi ca l)
Con cr et e
Concrete
Bridge
Concrete Ditch
Wall
Wall
Wall
W all
AC Paving
Shed
A C
P atch
AC Patch
Fen ce
Fe nc e
OVERALL KEY PLAN
MECHANICAL BLDG POWER PLAN
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
PARTIAL ONE LINE DIAGRAM - MECHANICAL BLDG
DISTRIBUTION PANEL "DPM"
600A DIST. SECTION
FEEDER SCHEDULE(E) SWBD - BLDG 12
(E) SWBD -"MSBA"
LA
A
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
N
I OS N
K.Y
EP R O F S
M
Y
IC
LAE L E
No. E 15980 Exp. 06-30-15
EL L E
A
NEER
G I
N
ILF CO A F O RE NTC R I
E R I
RE
G
S
TS
E D
K E
AT
T
L
ENGINEERINGKM
9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779
ELECTRICAL CONSULTANTS
PANELBOARD NO: "LM"
SECTION: ONE VOLTAGE: 120/208 BUS 225 AMP
MOUNTING: RECESSED PHASE: 3 MAIN 125 MCB
LINE TO LINE VOLTAGE 208 (208 OR 480) WIRE: 4 A.I.C.
TYPE: LIGHTING AND APPLIANCE
LOAD CIRCUIT CIRCUIT LOAD
CKT DESCRIPTION (VA) BREAKER BREAKER (VA) DESCRIPTION CKT
NO. LTS REC M/A MISC AMPS POLES AMPS POLES LTS REC M/A MISC NO
1 MECHANICAL BLDG - LTG 472 20 1 A 20 1 MECHANICAL BLDG - RECEPS 2
3 SPARE 20 1 B 20 1 SPARE 4
5 SPACE C SPARE 6
7 SPACE A SPARE 8
9 SPACE B SPARE 10
11 SPACE C SPARE 12
13 SPACE A SPARE 14
15 SPACE B SPARE 16
17 SPACE C SPARE 18
19 SPACE A SPARE 20
21 SPACE B SPARE 22
23 SPACE C SPARE 24
TOTAL 472 0 0 0 0 0 0 0 TOTAL
2 (1 for hospital, 2 for normal TOTAL (VA) DEMAND FACTOR MIN NEC (VA)
LIGHTING LOAD 472 1.25 590 FEEDER OC PROTECTION 100
RECEPTACLE LOAD 0 CODE 0 FEEDER (CODE NUMBER) 12
MECH/APPL LOAD 0 1 0 LINE AMPS 2.0 ( MINIMUM NEC AMPS)
MISC LOAD 0 1.25 0
CKT LNGH 20
SUB TOTAL 590 VOLTAGE DROP 0.0
% VOLTAGE DROP 0.01
SPARE 148 1 148
TOTAL 620 738
NORMAL POWER LOAD CALCULATIONS
NAME: Dist. Panel "DPM" MOUNTING: Floor AMPS: 600A MAIN
LINE TO LINE VOLTAGE: 480 PHASE: 3
TYPE: MCB WIRE: 3
LOADS
CKT DESCRIPTION LTS REC MOTORS &
NO. (LABEL) APPLIANCES
1 PUMP "P-1" (50hp) 54.0
2 PUMP "P-2" (50hp,redundant) 54.0
3 PUMP "P-3"(25hp) 28.3 4 PUMP "P-4" (25hp, redundant) 28.3
5 PUMP "P-5" (1hp) 1.5
6 FLUID COOLER "FC-1" FAN (15hp) 17.5
7 FLUID COOLER "FC-1" FAN (15hp) 17.5
8 FLUID COOLER "FC-1" PUMP (17.5hp) 19.9
9 PANEL "LM" VIA XFMR "TM" 0.5
10 CHILLER "CH-1" 148.0
11 CHILLER "CH-2" 148.0
TOTAL CONNECTED LOAD 0.5 0.0 517.0
DEMAND FACTOR 1.25 CODE 0.80
TOTAL EMD (KVA) 0.6 0.0 413.6
SUMMARY
TOTAL CONNECTED LOAD KVA 517.5
TOTAL EMD KVA 414.2
TOTAL EMD AMPS 498.4
CONNECTED LOAD (KVA)
GENERATOR POWER LOAD CALCULATIONS
NAME: Dist. Panel "DPM" MOUNTING: Floor AMPS: 600A MAIN
LINE TO LINE VOLTAGE: 480 PHASE: 3
TYPE: MCB WIRE: 3
LOADS
CKT DESCRIPTION LTS REC MOTORS &
NO. (LABEL) APPLIANCES
1 PUMP "P-1" (50hp) 54.0
2 PUMP "P-2" (50hp,redundant) 0.0
3 PUMP "P-3"(25hp) 28.3
4 PUMP "P-4" (25hp, redundant) 0.0
5 PUMP "P-5" (1hp) 1.5
6 FLUID COOLER "FC-1" FAN (15hp) 17.5
7 FLUID COOLER "FC-1" FAN (15hp) 17.5
8 FLUID COOLER "FC-1" PUMP (17.5hp) 19.9
9 PANEL "LM" VIA XFMR "TM" 0.5
10 CHILLER "CH-1" 148.0
11 CHILLER "CH-2" 0.0
TOTAL CONNECTED LOAD 0.5 0.0 286.7
DEMAND FACTOR 1.25 CODE 1.00
TOTAL EMD (KVA) 0.6 0.0 286.7
SUMMARY
TOTAL CONNECTED LOAD KVA 287.2
TOTAL EMD KVA 287.3
TOTAL EMD AMPS 345.7
CONNECTED LOAD (KVA)
STANDBY GENERATOR LOAD SUMMARY
NAME: 750KW/937.5KVA GENERATOR LOAD CALCULATIONS
LINE TO LINE VOLTAGE: 480
LOAD DESCRIPTION Total
NO. (LABEL) KVA
1 (E) GENERATOR LOADS (325 KVA X 125%) 406.3
2 (N) PANEL "DPM" GENERATOR LOADS 287.3
TOTAL LOAD 693.5
DEMAND FACTOR 1.0
TOTAL EMD (KVA) 693.5
TOTAL EMD AMPS 835
| 5123-010F 100% Design Dwgs 1 of 2 Transmitttal DESIGN 3-21-2014.pdf 1-10 |
| Submittal transmittal |
| 5123-010F 100% Design Dwgs 1 of 2 Transmitttal DESIGN 3-21-2014.pdf 11-20 |
| 5123-010F 100% Design Dwgs 2 of 2 Transmitttal DESIGN 3-21-2014 |
| Submittal transmittal |
File details come from the government source that posted it. Updated .