Attachment 7 Recovered Materials Determination.pdf
PDF 162 KB Posted
- Attached to
- Repair Base Roads on Grissom Air Reserve Base
- Solicitation number
- FA465425Q0010
About this file
The document is a Recovered Materials Determination Form for the Repair Base Roads project (Project Number CTGB252003) at Grissom Air Reserve Base. The form is part of the base's Affirmative Procurement Program for Recovered Materials, which requires procurement originators to identify and certify the use of recycled or recovered materials in procurement requests. On this specific form, the procurement originator (Bryan Jaworski) has checked "Cement and Concrete Containing Fly Ash or Ground Granulated Blast Furnace Slag" as the recovered material to be used, and signed the form on 21 March 2025, certifying compliance with applicable recycled/recovered material standards.
This form is associated with a broader solicitation (FA465425Q0010) for repairing base roads at Grissom Air Reserve Base, with a project cost range between $25,000 and $100,000. The road repair project includes multiple sections such as crack sealant application, pavement markings, joint sealing, full depth patching, spall repair, curb repair, sidewalk work, and traffic maintenance. A mandatory site visit is scheduled for 17 June 2025 at 0900 hrs, with potential bidders required to complete a specific process and submit a DBIDS QR Code by 16 June 2025 to attend.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA465425Q0010 Site Visit 17 June 2025.docx | DOCX document | |
| Attachment 6 - Section L.docx | DOCX document | |
| Attachment 3 Financial Institution Reference Sheet.docx | DOCX document | |
| Attachment 5 Grissom DBIDS - How to Request Base Access.pdf | ||
| Attachment 4 Grissom ARB Environmental Requirements.docx | DOCX document | |
| Attachment 1 Drawings and Specifications.pdf | ||
| Attachment 2 Davis-Bacon Act WD IN20250006 Rev 12.pdf | ||
| Solicitation - FA465425Q0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recovered Materials Determination Form Instructions
Project Name:
Project Number:
This form is to be completed by the procurement originator where the items or deliverables subject to Grissom ARB’s Affirmative Procurement Program for Recovered Materials are being procured from outside vendors. This form is not required for items requisitioned from established Federal supply sources.
1. The procurement originator checks off which items(s) apply to the procurement request, and signs and dates the bottom of the form.
2. The completed form becomes part of the contracting office contract file.
The Statement of Work/Specifications covering this procurement request is subject to Grissom ARB’s Affirmative Procurement Program for Recovered materials. The items being procured are:
Paper and Paper Products Transportation Products (Traffic Barricades or Traffic Cones, _____ Lubricating Oils Containing Parking stops, Delineators, Re-Refined Oil Flexible Delineators and
Channelizers Retread Tires
Landscaping Products _____ Shower and Restroom Dividers (Hydraulic Mulch or Compost, Garden and Soaker Hoses, and _____ Latex Paint Lawn and Garden Edging)
Plastic Fencing Office Recycling Containers or Office Waste Receptacles
Reclaimed Engine Coolants _____ Plastic Desktop Accessories
Building Insulation _____ Printer Ribbons
Structural Fiberboard Plastic Envelopes
_____ Laminated Paperboard Remanufactured or Recycled
_____ Pallets Toner Cartridges for Laser Printers, Photocopiers, Facsimile Machines, Cement and Concrete Containing or Micrographic Printers Fly Ash or Ground Granulated Blast Furnace Slag Plastic Trash Bags
Carpet Other Recycled-Content Items Not in EPA Guidelines, but Included in Grissom ARB’s Affirmative
Patio Blocks Procurement Plan _____ Floor Tiles (Describe item on reverse of form)
Binders Other
I hereby certify the Statement of Work/Specifications for the requisition of materials/services listed above complies with applicable Grissom ARB preference standards for recycled/recovered materials.
Procurement Originator's Signature Date
| Text27: Repair Base Roads | |
| Text28: CTGB252003 | |
| Check Box29: Off | |
| Check Box30: Off | |
| Check Box31: Off | |
| Check Box32: Off | |
| Check Box33: Off | |
| Check Box34: Off | |
| Check Box35: Off | |
| Check Box36: Off | |
| Check Box37: Off | |
| Check Box38: Off | |
| Check Box39: Off | |
| Check Box40: Yes | |
| Check Box41: Off | |
| Check Box42: Off | |
| Check Box43: Off | |
| Check Box44: Off | |
| Check Box45: Off | |
| Check Box46: Off | |
| Check Box47: Off | |
| Check Box48: Off | |
| Check Box49: Off | |
| Check Box50: Off | |
| Check Box51: Off | |
| Check Box52: Off | |
| Text53: | |
| 2025-03-21T11:42:59-0400 | |
| JAWORSKI.BRYAN.W.1097540949 |
Text55: 21 March 2025
File details come from the government source that posted it. Updated .