Attachment 1 Drawings and Specifications.pdf
PDF 5 MB Posted
- Attached to
- Repair Base Roads on Grissom Air Reserve Base Federal contract opportunity
- Solicitation number
- FA465425Q0010
About this file
These documents are construction drawings and specifications for a road repair project at Grissom Air Reserve Base in Indiana. The project, designated CTGB25-2003, involves comprehensive road maintenance including crack sealant application, pavement markings, joint sealing, full depth patching for both concrete and asphalt surfaces, spall repair, curb and sidewalk repairs, and traffic maintenance. The work will be performed across multiple base areas including Warthog Street, Bakalar Lane, Skytrain Street, Doc Evens Area, and Foreman Drive Area.
The project specifications detail precise technical requirements for each repair type, including surface preparation, material specifications, installation methods, and quality control standards. The project is valued between $25,000 and $100,000, with a site visit scheduled for 17 June 2025. The solicitation (FA465425Q0010) is issued by the Department of Air Force Reserve Command, with a North American Industry Classification System (NAICS) code of 237310 for highway, street, and bridge construction. Potential bidders are required to complete a specific process to attend the mandatory site visit, which includes sending a DBIDS QR Code to the contracting officer by 16 June 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA465425Q0010 Site Visit 17 June 2025.docx | DOCX document | |
| Attachment 6 - Section L.docx | DOCX document | |
| Attachment 3 Financial Institution Reference Sheet.docx | DOCX document | |
| Attachment 2 Davis-Bacon Act WD IN20250006 Rev 12.pdf | ||
| Solicitation - FA465425Q0010.pdf | ||
| Attachment 5 Grissom DBIDS - How to Request Base Access.pdf | ||
| Attachment 4 Grissom ARB Environmental Requirements.docx | DOCX document | |
| Attachment 7 Recovered Materials Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SU
BM
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
XX
X
JA
W
OR
SK
I
JA
W
OR
SK
I
AN
D
SI
DE
W
AL
KS
PA
RK
IN
G
LO
TS
MA
IN
TA
IN
R
OA
DS
1FEB 2025
CTGB25-2003
G001
TI
TL
E
SH
EE
T
GR
EE
N
PE
RR
Y
LEGEND:
LAYDOWN YARD
GRISSOM AIR RESERVE BASE
PROJECT TITLE: PROJECT NUMBER:
MAINTAIN ROADS, PARKING LOTS, CTGB252003
AND SIDEWALKS
FACS 901, 904, & 906
##### SCALE: DETAIL SCALE
DETAIL REFERENCE
SHEET REFERENCE
1 - G001 - TITLE SHEET
2 - G002 - GENERAL SPECIFICATIONS
3 - C001 - CIVIL SPECIFICATIONS
4 - C002 - CIVIL SPECIFICATIONS
5 - C003 - CIVIL SPECIFICATIONS
6 - C003 - CIVIL SPECIFICATIONS
7 - CP101 - CIVIL SITE PLAN
8 - CP102 - WARTHOG, BAKALAR, SKYTRAIN
9 - CP103 - FOREMAN, DOC EVENS
10 - C501 - PAVEMENT, CURB, AND SIDEWALK DETAILS
11 - C502 - PERVIOUS PAVEMENT AND DRAINAGE DETAILS
CIVIL ENGINEERING
FACILITY 641
BASE CONTRACTING
FACILITY 448
MAIN GATE
VISITORS
CENTER HOURS
7:30A - 3:30P
CONTRACTOR OFF-SITE
DISPOSAL ROUTE
TRUCK INSPECTION
HOURS 7:30A - 3:30P
ROUTE 218
US 31
HOOSIER AVE.
FOREMAN DRIVE
800 S.
HAUL ROUTE
N
SCALE:SCALE:SCALE: 3/8" = 1'-0"
TITLE SHEET
G001
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, A\
P ro je ct
D es ig n
Fi le s\
-2
Pa ve m en t I
D
IQ
(S us ta in
B as e Pa ve m en ts
)\C
AD
\1 _8
_2
5\
_G en er al
Sh ee ts .d w g, /3
1/
:2 5:
P
M , A ut oC
AD
P
D F
(G en er al
D oc um en ta tio
n) .p c3
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
VERSION
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL NAME
AutoCAD SHX Text
US 41
AutoCAD SHX Text
FORT WAYNE
AutoCAD SHX Text
MICHIGAN
AutoCAD SHX Text
SOUTH BEND
AutoCAD SHX Text
US 31
AutoCAD SHX Text
CHICAGO
AutoCAD SHX Text
INT 65
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
INT 69
AutoCAD SHX Text
INDIANAPOLIS
AutoCAD SHX Text
INT 70
AutoCAD SHX Text
KOKOMO
AutoCAD SHX Text
PERU
AutoCAD SHX Text
GRISSOM ARB
AutoCAD SHX Text
INT 64
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
INT 65
AutoCAD SHX Text
CINCINNATI
AutoCAD SHX Text
INT 74
AutoCAD SHX Text
ILLINOIS
AutoCAD SHX Text
INT 74
AutoCAD SHX Text
US 41
AutoCAD SHX Text
TERRE HAUTE
AutoCAD SHX Text
INT 70
AutoCAD SHX Text
LAFAYETTE
AutoCAD SHX Text
OHIO
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
EVANSVILLE
AutoCAD SHX Text
STATE OF INDIANA
AutoCAD SHX Text
LOUISVILLE
AutoCAD SHX Text
CONTENTS
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Project Coordinations:
AutoCAD SHX Text Safety
AutoCAD SHX Text DoD Security Forces
AutoCAD SHX Text Operational Contracting
AutoCAD SHX Text Fire Chief
AutoCAD SHX Text Airfield Manager
AutoCAD SHX Text Environmental Engineer
AutoCAD SHX Text Approved
AutoCAD SHX Text Commander
AutoCAD SHX Text Approved
AutoCAD SHX Text Base Civil Engineer
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
AutoCAD SHX Text Date
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
XX
X
JA
W
OR
SK
I
JA
W
OR
SK
I
AN
D
SI
DE
W
AL
KS
PA
RK
IN
G
LO
TS
MA
IN
TA
IN
R
OA
DS
1FEB 2025
CTGB25-2003
G002
GE
NE
RA
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
MAINTAIN PAVEMENTS SPECIFICATIONS
SECTION 1 - GENERAL
PROJECT DESCRIPTION
THE WORK INCLUDES PAVEMENT REPLACEMENT AND ALL
INCIDENTAL RELATED WORK AS INDICATED ON THE DRAWINGS
AND THESE SPECIFICATIONS.
WORK SCHEDULING
CONTRACTOR SHALL ALLOW FOR A MAXIMUM OF 5 CALENDAR
DAYS WHERE CONSTRUCTION ACTIVITY IS PROHIBITIVE. NORMAL
DUTY HOURS FOR WORK SHALL BE FROM 7:30 A.M. TO 4:30 P.M.,
MONDAY THROUGH FRIDAY, NOT INCLUDING FEDERAL HOLIDAYS.
REQUESTS FOR ADDITIONAL WORK SHALL REQUIRE WRITTEN
APPROVAL FROM THE CONTRACTING OFFICER 7 DAYS IN ADVANCE
OF THE PROPOSED WORK PERIOD.
OCCUPANCY OF PREMISES
THE PROJECT SHALL BE COORDINATED AND PHASED TO ALLOW
TRAFFIC FOR ALL TRAVELED WAYS.
SUPERVISION
IN ACCORDANCE WITH FAR 52.236-6, SUPERINTENDENCE BY THE
CONTRACTOR, THE CONTRACTOR SHALL HAVE A SITE
SUPERINTENDENT AT THE SITE AT ALL TIMES WHEN THERE ARE
WORKERS ON SITE OR WHEN DELIVERIES ARE TO BE RECEIVED.
UNDER NO CIRCUMSTANCES SHALL A SUBCONTRACTOR BE
AUTHORIZED TO BE SITE SUPERINTENDENT FOR THE PRIME
CONTRACTOR. THE SUPERINTENDENT SHALL BE DESIGNATED AS
SUCH TO THE CONTRACTING OFFICER IN WRITING WITH THE
SIGNATURES OF THE CONTRACTOR AND THE DESIGNATED
SUPERINTENDENT. THE CONTRACTOR SHALL OUTLINE IN THE
DESIGNATION LETTER THE EXTENT OF THE SUPERINTENDENT'S
AUTHORITY.
SITE PLAN
PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL SUBMIT
SITE PLANS TO THE CONTRACTING OFFICER FOR APPROVAL
SHOWING THE LAYOUT AND DETAILS OF ALL TEMPORARY
FACILITIES USED FOR THIS CONTRACT. THE BASE APPROVAL
AUTHORITY, NORMALLY THE BASE CIVIL ENGINEER, MUST
APPROVE THE PLAN. THE PLAN SHALL INCLUDE THE LOCATION OF
THE SAFETY AND/OR CONSTRUCTION FENCES, LOCATION OF ALL
SITE TRAILERS, EQUIPMENT AND MATERIAL STORAGE AREAS,
CONSTRUCTION ENTRANCES, TRASH DUMPSTERS, TEMPORARY
SANITARY FACILITIES AND WORKER PARKING AREAS. SITE
PICTURES PRIOR TO THE START OF WORK MAY BE INCLUDED WITH
THE PLAN. AT COMPLETION OF WORK, THE CONTRACTOR SHALL
REMOVE THE FACILITIES AND RESTORE THE SITE TO ITS ORIGINAL
CONDITION.
DIRT AND DUST CONTROL PLAN
AS PART OF THE TRAFFIC CONTROL PLAN, THE CONTRACTOR
SHALL SUBMIT TRUCK AND MATERIAL HAUL ROUTES FOR
CONTROLLING DIRT, DEBRIS, DUST ON BASE ROADWAYS. AS A
MINIMUM, THE PLANS SHALL IDENTIFY THE SUBCONTRACTOR AND
EQUIPMENT FOR CLEANING ALONG THE HAUL ROUTE AND
MEASURES TO REDUCE DIRT, DUST, AND DEBRIS FROM
ROADWAYS.
SITE PICTURES
PHOTOGRAPHS SHALL NOT BE TAKEN ON THE JOBSITE WITHOUT
PRIOR WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.
SUBMITTALS
PROVIDE SUBMITTALS FOR PRODUCT DATA AND PLANS IDENTIFIED
IN THESE SPECIFCATIONS. FORMATTING AND PROCEDURES FOR
TRANSMITTAL SHALL BE PER THE CONSTRUCTION CONTRACTORS
GUIDE PROVIDED BY THE 434TH/ OPERATIONAL CONTRACTING
OFFICE. ALL SUBMITTALS, REQUESTS FOR INFORMATION AND
TRANSMITTALS SHALL BE ELECTRONICALLY SENT TO THE
CONTRACTING OFFICER.
QUALITY CONTROL
THE CONTRACTOR IS REQUIRED TO PROVIDE QUALITY CONTROL
FOR THE WORK PERFORMED ON THIS CONTRACT. THE
GOVERNMENT WILL PERFORM QUALITY ASSURANCE TO REVIEW
SUBMITTALS, REPORTS, AND INSPECTIONS PERFORMED BY THE
QC MANAGER (QCM). THE CONTRACTOR SHALL IDENTIFY THE QC
MANAGER AT THE PRE-CONSTRUCTION MEETING. CONTRACTOR
SHALL SUBMIT A QUALITY CONTROL PLAN PRIOR TO
CONSTRUCTION INDICATING THE QCM, CHECKLISTS USED FOR
CONTRACT COMPLIANCE, METHODS TO ENSURE COMPLIANCE
WITH THE DRAWINGS AND SPECIFICATIONS AND PROCEDURES
FOR CORRECTING ANY DEFICIENCIES FOUND BY THE QCM OR
GOVERNMENT QA.
DELIVERY, STORAGE, AND HANDLING
INSPECT MATERIALS DELIVERED TO THE SITE FOR VISIBLE
DAMAGE, AND UNLOAD AND STORE WITH A MINIMUM OF HANDLING.
DELIVER MATERIALS IN ORIGINAL SEALED CONTAINERS AND
PROTECT FROM FREEZING OR OVERHEATING. PROVIDE JOBSITE
STORAGE FACILITIES CAPABLE OF MAINTAINING TEMPERATURE
RANGES WITHIN MANUFACTURERS RECOMMENDATIONS.
WEATHER REQUIREMENTS
DO NOT PROCEED WITH WORK WHEN WEATHER CONDITIONS
DETRIMENTALLY AFFECT THE QUALITY OF WORK. PROCEED WITH
WORK ONLY WHEN WEATHER CONDITIONS ARE IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS.
PRE-CONSTRUCTION
THE CONTRACTOR SHALL HOLD A PRE-CONSTRUCTION MEETING
PRIOR TO STARTING WORK TO IDENTIFY THE WORK LOCATIONS,
HOURS OF OPERATION, SCHEDULE, QUALITY CONTROL
PROCEDURES AND ANY PERTINENT DETAILS TO COMPLETING THE
WORK ON THIS PROJECT. ALL SUBMITTALS, PLANNING
DOCUMENTS AND SCHEDULES MUST BE APPROVED BY THE
GOVERNMENT PRIOR TO SCHEDULING THE MEETING DATE. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT
LEAST 14 CALENDAR DAYS PRIOR TO THE MEETING DATE.
PRE-FINAL INSPECTION
THE GOVERNMENT AND QC MANAGER WILL PERFORM THIS
INSPECTION TO VERIFY THAT THE FACILITY IS COMPLETE AND
READY TO BE OCCUPIED. A GOVERNMENT PRE-FINAL PUNCH LIST
MAY BE DEVELOPED AS A RESULT OF THIS INSPECTION. THE QC
MANAGER SHALL ENSURE THAT ALL ITEMS ON THIS LIST ARE
CORRECTED PRIOR TO NOTIFYING THE GOVERNMENT THAT A
"FINAL" INSPECTION WITH THE CUSTOMER CAN BE SCHEDULED.
ANY ITEMS NOTED ON THE "PRE-FINAL" INSPECTION SHALL BE
CORRECTED IN A TIMELY MANNER AND SHALL BE ACCOMPLISHED
BEFORE THE CONTRACT COMPLETION DATE FOR THE WORK OR
ANY PARTICULAR INCREMENT THEREOF IF THE PROJECT IS
DIVIDED INTO INCREMENTS BY SEPARATE COMPLETION DATES.
FINAL ACCEPTANCE INSPECTION
THE QC MANAGER, THE SUPERINTENDENT, OR OTHER
CONTRACTOR MANAGEMENT PERSONNEL AND THE KO WILL BE IN
ATTENDANCE AT THIS INSPECTION. ADDITIONAL GOVERNMENT
PERSONNEL MAY BE IN ATTENDANCE. THE FINAL ACCEPTANCE
INSPECTION WILL BE FORMALLY SCHEDULED BY THE KO BASED
UPON RESULTS OF THE "PRE-FINAL
INSPECTION". NOTICE SHALL BE GIVEN TO THE KO AT LEAST 14
DAYS PRIOR TO THE FINAL INSPECTION. THE NOTICE SHALL STATE
THAT ALL SPECIFIC ITEMS PREVIOUSLY IDENTIFIED TO THE
CONTRACTOR AS BEING UNACCEPTABLE WILL BE
COMPLETE BY THE DATE SCHEDULED FOR THE FINAL
ACCEPTANCE INSPECTION. FAILURE OF THE CONTRACTOR TO
HAVE ALL CONTRACT WORK ACCEPTABLY COMPLETE FOR THIS
INSPECTION WILL BE CAUSE FOR THE KO TO BILL THE
CONTRACTOR FOR THE GOVERNMENT'S ADDITIONAL INSPECTION
COST IN ACCORDANCE WITH THE CONTRACT CLAUSE "INSPECTION
OF CONSTRUCTION".
TRAFFIC CONTROL PLAN
SUBMIT A TRAFFIC CONTROL PLAN FOR ALL WORK ACTIVITIES TO
INCLUDE RIGHT OF WAY, RADIO COMMUNICATION, FOD CHECKS
AND HAUL ROUTES. THE PROJECT SHALL BE COORDINATED AND
PHASED TO ALLOW TRAFFIC FOR ALL TRAVELED WAYS. THE
CONTRACTOR SHALL PROVIDE AND MAINTAIN LOW PROFILE
BARRIERS WITH LIGHTS, WEIGHTED BY WATER FOR THE DURATION
OF CLOSED PERIODS.
ENVIRONMENTAL PROTECTION PLAN
SUBMIT ENVIRONMENTAL PROTECTION PLAN INDICATING BEST
MANAGEMENT PRACTICES FOR STORM WATER PROTECTION, AIR
POLLUTION, NOISE PREVENTION, AND WILDLIFE PROTECTION AS IT
PERTAINS TO THE EQUIPMENT IN MAINTAINING COMPLIANCE WITH
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT. THE
PLAN SHALL BE SUBMITTED PRE-CONSTRUCTION AND APPROVED
BY THE BASE ENVIRONMENTAL OFFICE.
SAFETY DATA SHEETS (SDS)
SUBMIT ALL SDS FOR PRODUCTS AND MATERIALS USED ON THIS
PROJECT. THESE INCLUDE TEMPORARY AND PERMANENT
MATERIALS USED AND STORED IN THE LAYDOWN YARD OR
APPLIED TO THE PROJECT SITE LOCATIONS.
HAZARDOUS WASTE RECORDS
SUBMIT ALL WASTE RECORDS FOR MATERIAL REMOVED OFF-SITE
AS PART OF THE FINAL INSPECTION RECORDS.
SECURITY FREE ZONES
AUTHORIZATIONS ARE REQUIRED FOR THE CONTRACTOR TO
WORK IN RESTRICTED AREAS. FOLLOW CONSTRUCTION PHASING
HAUL ROUTES AND REQUIREMENTS AS INDENTIFIED ON THE
DRAWINGS. PAY ATTENTION TO ANY RED LINES AND RESTRICTED
AREA SIGNAGE.
HAZARDOUS MATERIALS
SUBMIT ALL HAZARDOUS MATERIALS PROPOSED FOR USE ON THE
PROJECT. THIS LIST IS REQUIRED TO BE APPROVED PRIOR TO
BEING BROUGHT ONTO THE INSTALLATION BY CEV. A SDS FOR
EACH HAZARDOUS CHEMICAL AND AN ESTIMATED USAGE AMOUNT
MUST BE INCLUDED IN THE SUBMITTAL.
PROJECT SCHEDULE
PREPARE FOR APPROVAL A PROJECT SCHEDULE, AS SPECIFIED
HEREIN, PURSUANT TO THE FAR 52.236-15 “SCHEDULES FOR
CONSTRUCTION CONTRACTS”. SHOW IN THE SCHEDULE THE
SEQUENCE IN WHICH THE CONTRACTOR PROPOSES TO PERFORM
THE WORK AND DATES ON WHICH THE CONTRACTOR
CONTEMPLATES STARTING AND COMPLETING ALL SCHEDULE
ACTIVITIES. THE SCHEDULING OF CONSTRUCTION IS THE
RESPONSIBILITY OF THE CONTRACTOR. PROVIDE A SCHEDULE
THAT IS A FORWARD PLANNING AS WELL AS A PROJECT
MONITORING TOOL.
CRITICAL PATH METHOD
THE CRITICAL PATH METHOD OF NETWORK CALCULATION SHALL
BE USED TO GENERATE THE PROJECT SCHEDULE.
WARRANTY MANAGEMENT PLAN
THE CONTRACTOR SHALL DEVELOP A WARRANTY MANAGEMENT
PLAN WHICH SHALL CONTAIN INFORMATION RELEVANT TO THE
CLAUSE "WARRANTY OF CONSTRUCTION" IN FAR 52.246-21. AT
LEAST THIRTY (30) CALENDAR DAYS BEFORE THE PLANNED
PRE-WARRANTY CONFERENCE, THE CONTRACTOR SHALL SUBMIT
THE WARRANTY MANAGEMENT PLAN FOR GOVERNMENT
APPROVAL. THE WARRANTY MANAGEMENT PLAN SHALL INCLUDE
ALL REQUIRED ACTIONS AND DOCUMENTS TO ASSURE THAT THE
GOVERNMENT RECEIVES ALL WARRANTIES TO WHICH IT IS
ENTITLED. THE PLAN SHALL BE IN NARRATIVE FORM AND CONTAIN
SUFFICIENT DETAIL TO RENDER IT SUITABLE FOR USE BY FUTURE
MAINTENANCE AND REPAIR PERSONNEL, WHETHER TRADESMEN,
OR OF ENGINEERING BACKGROUND, NOT NECESSARILY FAMILIAR
WITH THIS CONTRACT. THE TERM "STATUS" AS INDICATED BELOW
SHALL INCLUDE DUE DATE AND WHETHER ITEM HAS BEEN
SUBMITTED OR WAS ACCOMPLISHED. WARRANTY INFORMATION
MADE AVAILABLE DURING THE CONSTRUCTION PHASE SHALL BE
SUBMITTED TO THE CO FOR APPROVAL PRIOR TO EACH MONTHLY
PAY ESTIMATE. APPROVED INFORMATION SHALL BE ASSEMBLED IN
A BINDER AND SHALL BE TURNED OVER TO THE GOVERNMENT
UPON ACCEPTANCE OF THE WORK. THE CONSTRUCTION
WARRANTY PERIOD SHALL BEGIN ON THE DATE OF PROJECT
ACCEPTANCE AND SHALL CONTINUE FOR THE FULL PRODUCT
WARRANTY PERIOD. A JOINT 4 MONTH AND 9 MONTH WARRANTY
INSPECTION SHALL BE CONDUCTED, MEASURED FROM TIME OF
ACCEPTANCE, BY THE CONTRACTOR, CO AND THE CUSTOMER
REPRESENTATIVE. INFORMATION CONTAINED IN THE WARRANTY
MANAGEMENT PLAN SHALL INCLUDE, BUT SHALL NOT BE LIMITED
TO, THE FOLLOWING:
(A) ROLES AND RESPONSIBILITIES OF ALL PERSONNEL
ASSOCIATED WITH THE WARRANTY PROCESS, INCLUDING POINTS
OF CONTACT AND TELEPHONE NUMBERS WITHIN THE
ORGANIZATIONS OF THE CONTRACTORS, SUBCONTRACTORS,
MANUFACTURERS OR SUPPLIERS INVOLVED.
(B) LISTING AND STATUS OF DELIVERY OF ALL CERTIFICATES
OF WARRANTY FOR EXTENDED WARRANTY ITEMS, TO INCLUDE
ROOFS, HVAC BALANCING, PUMPS, MOTORS, TRANSFORMERS, AND
FOR ALL COMMISSIONED SYSTEMS SUCH AS FIRE PROTECTION
AND ALARM SYSTEMS, SPRINKLER SYSTEMS, LIGHTNING
PROTECTION SYSTEMS, ETC.
(C) A LIST FOR EACH WARRANTED EQUIPMENT, ITEM, AND
FEATURE OF CONSTRUCTION OR SYSTEM INDICATING:
1. NAME OF ITEM.
2. MODEL AND SERIAL NUMBERS.
3. LOCATION WHERE INSTALLED.
4. NAME AND PHONE NUMBERS OF MANUFACTURERS OR
SUPPLIERS.
5. NAMES, ADDRESSES AND TELEPHONE NUMBERS OF
SOURCES OF SPARE PARTS.
6. WARRANTIES AND TERMS OF WARRANTY. THIS SHALL
INCLUDE ONE-YEAR OVERALL WARRANTY OF CONSTRUCTION.
ITEMS WHICH HAVE EXTENDED WARRANTIES SHALL BE INDICATED
WITH SEPARATE WARRANTY EXPIRATION DATES.
7. CROSS-REFERENCE TO WARRANTY CERTIFICATES AS
APPLICABLE.
8. STARTING POINT AND DURATION OF WARRANTY PERIOD.
9. SUMMARY OF MAINTENANCE PROCEDURES REQUIRED TO
CONTINUE THE WARRANTY IN FORCE.
10. CROSS-REFERENCE TO SPECIFIC PERTINENT OPERATION
AND MAINTENANCE MANUALS.
11. ORGANIZATION, NAMES AND PHONE NUMBERS OF PERSONS
TO CALL FOR WARRANTY SERVICE.
12. TYPICAL RESPONSE TIME AND REPAIR TIME EXPECTED FOR
VARIOUS WARRANTED EQUIPMENT.
(A) THE CONTRACTOR'S PLANS FOR ATTENDANCE AT THE 4
AND 9 MONTH POST-CONSTRUCTION WARRANTY INSPECTIONS
CONDUCTED BY THE GOVERNMENT.
(B) PROCEDURE AND STATUS OF TAGGING OF ALL EQUIPMENT
COVERED BY EXTENDED WARRANTIES.
(C) COPIES OF INSTRUCTIONS TO BE POSTED NEAR SELECTED
PIECES OF EQUIPMENT WHERE OPERATION IS CRITICAL FOR
WARRANTY AND/OR SAFETY REASONS.
SPILLS
ALL PERSONNEL (GOVERNMENT AND CONTRACTOR) ARE
REQUIRED TO FOLLOW THE FACILITY RESPONSE PLAN (FRP) & THE
SPILL PREVENTION, CONTROL, AND COUNTERMEASURES (SPCC)
PLAN. ANY RELEASE A CONTRACTOR OR SUB-CONTRACTOR IS
INVOLVED IN (FUEL, OIL, HAZMAT) THE CONTRACTOR IS
RESPONSIBLE FOR REPORTING AND CLEAN-UP, DISPOSAL OF
SPILT MATERIAL, RESPONSE ITEMS USED, AND SOIL OR OTHER
CONTAMINATED ITEMS. CONTRACTOR IS TO REPORT THE SPILL
(PER SPCC/FRP), SAME DAY, TO CEV AND ANY OTHER PERTINENT
PARTY. TRANSMIT REPORTS AT INTERVALS INDENTIFIED IN TABLE
ON G002
SOLID WASTE/RECYCLING
CONTRACTORS WILL PROVIDE QUARTERLY AND ANNUAL (FY
CALENDAR), AND PROJECT COMPLETION REPORTS TO CEV FOR
MATERIALS DISPOSED AND DIVERTED. REPORTS WILL CONTAIN,
AT A MINIMUM, MATERIAL DISPOSED/RECYCLED, POUNDS/TONS OF
MATERIAL RECYCLED/DISPOSED, LOCATION MATERIAL IS
RECYCLED/DISPOSED (LANDFILL OR COMPANY), DATE MATERIAL
LEFT THE SITE, AND ANY OTHER PERTINENT INFORMATION.
CONTRACTOR SHALL PROVIDE, WITH REPORTS, WEIGHT TICKETS
FOR MATERIAL RECYCLED/DISPOSED.
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, A\
P ro je ct
D es ig n
Fi le s\
-2
Pa ve m en t I
D
IQ
(S us ta in
B as e Pa ve m en ts
)\C
AD
\1 _8
_2
5\
_G en er al
Sh ee ts .d w g, /2
1/
:4 6:
P
M , A ut oC
AD
P
D F
(G en er al
D oc um en ta tio
n) .p c3
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
VERSION
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
C001
CI
VI
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
SECTION 1 - CRACK SEALANT IN PAVEMENT
QUALITY ASSURANCE
TEST THE CRACK SEALANT AND BACKUP MATERIALS FOR
CONFORMANCE WITH THE REFERENCED APPLICABLE MATERIAL
SPECIFICATION. PERFORM TESTING OF THE MATERIALS IN AN
APPROVED, INDEPENDENT LABORATORY; SUBMIT CERTIFIED
COPIES OF THE TEST REPORTS FOR APPROVAL 3 DAYS PRIOR
TO THE USE OF THE MATERIALS AT THE JOB SITE. SUBMIT
REPORTS OF ALL TESTS. SAMPLES WILL BE RETAINED BY THE
GOVERNMENT FOR POSSIBLE FUTURE TESTING, IF THE
MATERIALS APPEAR DEFECTIVE DURING OR AFTER
APPLICATION. FURNISH SAMPLES OF MATERIALS, IN
SUFFICIENT QUANTITY TO BE TESTED BY THE GOVERNMENT
UPON REQUEST. CONFORMANCE WITH THE TEST
REQUIREMENTS OF THE LABORATORY TESTS SPECIFIED WILL
NOT CONSTITUTE FINAL ACCEPTANCE OF THE MATERIALS.
FINAL ACCEPTANCE WILL BE BASED ON THE PERFORMANCE OF
MATERIALS THAT HAVE BEEN SATISFACTORILY INSTALLED.
ENVIRONMENTAL REQUIREMENTS
APPLY THE MATERIALS ONLY WHEN THE AMBIENT AIR
TEMPERATURE AND THE PAVEMENT TEMPERATURE WITHIN THE
JOINT WALL ARE AT LEAST 40 DEGREES F AND RISING. DO NOT
APPLY SEALANT IF MOISTURE IS OBSERVED IN THE CRACK.
ACCEPTANCE
CRACK SEALANT
INSPECT THE CRACK SEALANT FOR PROPER CURE AND RATE
OF SET, TACK FREE SURFACE, BONDING TO THE BITUMINOUS
PAVEMENT, COHESIVE SEPARATION WITHIN THE SEALANT,
REVERSION TO LIQUID, AND ENTRAPPED AIR AND VOIDS.
REMOVE SEALANTS EXHIBITING ANY OF THESE DEFICIENCIES,
AT ANY TIME PRIOR TO THE FINAL ACCEPTANCE OF THE
PROJECT, AND REPLACE AS SPECIFIED HEREIN.
TEST SECTION
PRIOR TO THE CLEANING AND SEALING OF THE CRACKS FOR
THE ENTIRE PROJECT, CONSTRUCT A TEST SECTION AT LEAST
200 FEET LONG USING THE SPECIFIED MATERIALS AND
APPROVED EQUIPMENT TO DEMONSTRATE THE PROPOSED
PREPARATION AND SEALING OF ALL CRACKS OF THE PROJECT.
FOLLOWING THE COMPLETION OF THE TEST SECTION AND
BEFORE ANY OTHER CRACK IS SEALED, INSPECT THE TEST
SECTION TO DETERMINE THAT THE MATERIALS AND
INSTALLATION MEET THE REQUIREMENTS SPECIFIED. IF
MATERIALS OR INSTALLATION DO NOT MEET REQUIREMENTS,
REMOVE THE MATERIALS AND RECLEAN AND RESEAL THE
CRACKS. WHEN THE TEST SECTION MEETS THE
REQUIREMENTS, IT CAN BE INCORPORATED INTO THE
PERMANENT WORK AND ACCEPTED FOR PAYMENT. SEAL ALL
OTHER CRACKS IN THE MANNER APPROVED AND
SUCCESSFULLY COMPLETED FOR SEALING THE TEST SECTION.
SEALANTS
PROVIDE CRACK SEALANT CONFORMING TO ASTM D6690, TYPE
AS SUITABLE OVER THE PERFORMANCE GRADE 64-22
TEMPERATURE RANGE FOR SEALING CRACKS. EMULSION
AE-90, AE-90'S, AE-150.
BACKER ROD MATERIALS
PROVIDE BACKER ROD MATERIAL THAT IS A COMPRESSIBLE,
NONSHRINKING, NONSTAINING, NONABSORPTIVE MATERIAL
AND NONREACTIVE WITH THE CRACK SEALANT. USE BACKER
ROD WITH A MELTING POINT TEMPERATURE OF AT LEAST 5
DEGREES F GREATER THAN THE MAXIMUM POURING
TEMPERATURE OF THE SEALANT BEING USED, WHEN TESTED IN
ACCORDANCE WITH ASTM D789. USE MATERIAL THAT HAS A
WATER ABSORPTION OF NOT MORE THAN 5 PERCENT BY
WEIGHT WHEN TESTED IN ACCORDANCE WITH ASTM C509. USE
BACKER ROD MATERIAL THAT IS 25 PERCENT (PLUS OR MINUS 5
PERCENT) LARGER IN DIAMETER THAN THE NOMINAL WIDTH OF
THE CRACK.
EQUIPMENT, TOOLS, AND MACHINES
EQUIPMENT, TOOLS, AND MACHINES USED IN PERFORMANCE
OF THE WORK ARE SUBJECT TO APPROVAL BY THE
GOVERNMENT. MAINTAIN IN A SATISFACTORY WORKING
CONDITION AT ALL TIMES.
ROUTING EQUIPMENT
PROVIDE ROUTING EQUIPMENT WHICH IS A SELF-POWERED
MACHINE OPERATING A POWER DRIVEN TOOL OR BIT
SPECIFICALLY DESIGNED FOR ROUTING BITUMINOUS
PAVEMENTS. USE A BIT ROTATING ABOUT A VERTICAL AXIS AT
SUFFICIENT SPEED TO CUT A SMOOTH VERTICAL-WALLED
RESERVOIR IN THE PAVEMENT SURFACE AND MAINTAIN
ACCURATE CUTTING WITHOUT DAMAGING THE SIDES OR TOP
EDGES OF THE RESERVOIR. PROVIDE A ROUTER CAPABLE OF
FOLLOWING THE TRACE OF THE CRACK WITHOUT DEVIATION.
THE USE OF ROTARY IMPACT ROUTING DEVICES CAN BE
PERMITTED IF VERTICAL-SIDED CARBIDE TIPPED BITS ARE
USED.
AIR COMPRESSOR
PROVIDE AIR COMPRESSOR CAPABLE OF FURNISHING NOT
LESS THAN 150 CUBIC FEET PER MINUTE AND MAINTAINING A
LINE PRESSURE OF NOT LESS THAN 90 PSI AT THE NOZZLE.
EQUIP THE COMPRESSOR WITH FILTERS THAT MAINTAIN THE
COMPRESSED AIR FREE OF OIL AND WATER.
HEAT LANCE
PROVIDE A HEAT LANCE OPERATING WITH PROPANE AND
COMPRESSED AIR IN COMBINATION TO PROVIDE FLAME-FREE
HIGH TEMPERATURE HOT AIR UP TO 3000 DEGREES F WITH EXIT
VELOCITIES OF 3000 FEET PER SECOND.
HAND TOOLS
HAND TOOLS CAN BE USED, WHEN APPROVED, FOR REMOVING
DEFECTIVE SEALANT FROM CRACKS AND REPAIRING OR
CLEANING THE CRACK FACES.
CRACK SEALING EQUIPMENT
PROVIDE UNIT APPLICATORS, USED FOR HEATING AND
INSTALLING THE HOT-POURED CRACK SEALANT MATERIALS,
THAT ARE MOBILE AND EQUIPPED WITH A DOUBLE-BOILER,
AGITATOR-TYPE KETTLE WITH AN OIL MEDIUM IN THE OUTER
SPACE FOR HEAT TRANSFER; A DIRECT-CONNECTED
PRESSURE-TYPE EXTRUDING DEVICE WITH A NOZZLE SHAPED
FOR INSERTING IN THE PREPARED CRACK TO BE FILLED;
POSITIVE TEMPERATURE DEVICES FOR CONTROLLING THE
TEMPERATURE OF THE TRANSFER OIL AND SEALANT; AND A
RECORDING TYPE THERMOMETER FOR INDICATING THE
TEMPERATURE OF THE SEALANT. ALLOW THE SEALANT TO
CIRCULATE THROUGH THE DELIVERY HOSE AND RETURN TO
THE INNER KETTLE WHEN NOT IN USE.
PREPARATION OF CRACKS
IMMEDIATELY BEFORE THE INSTALLATION OF THE CRACK
SEALANT, THOROUGHLY DRY AND CLEAN THE CRACKS TO
REMOVE OXIDIZED PAVEMENT, LOOSE AGGREGATE AND
FOREIGN DEBRIS. PREPARE CRACKS AS FOLLOWS:
CRACKS
HAIRLINE CRACKS
CRACKS THAT ARE LESS THAN 1/4 INCH WIDE DO NOT NEED TO
BE SEALED.
SMALL AND MEDIUM CRACKS
ROUT CRACKS THAT ARE 1/4 TO 1-1/2 INCHES WIDE TO A
NOMINAL WIDTH
1/8 INCH GREATER THAN THE EXISTING NOMINAL WIDTH AND TO
A DEPTH NOT GREATER THAN 3/4 INCH. CLEAN AND DRY USING
COMPRESSED AIR OR A HEAT LANCE.
LARGE CRACKS
REFER TO THE DRAWINGS FOR REPAIR METHODS FOR LARGE
CRACKS.
EXISTING SEALANT REMOVAL
CUT LOOSE THE IN-PLACE SEALANT FROM BOTH CRACK FACES
AND TO A DEPTH SHOWN ON THE DRAWINGS. REMOVE
SEALANT TO A DEPTH SUFFICIENT TO ACCOMMODATE ANY
BACKER ROD MATERIAL THAT IS REQUIRED TO MAINTAIN THE
DEPTH OF NEW SEALANT TO BE INSTALLED. PRIOR TO
FURTHER CLEANING OPERATIONS, REMOVE ALL OLD LOOSE
SEALANT REMAINING IN THE CRACK OPENING BY BLOWING
WITH COMPRESSED AIR.
ROUTING
PERFORM ROUTING OF THE CRACKS USING A ROTARY ROUTER
WITH A BIT THAT IS AT LEAST 1/8 INCH WIDER THAN THE
NOMINAL WIDTH OF THE CRACK TO REMOVE ALL RESIDUAL OLD
SEALANT (RESEALING), OXIDIZED PAVEMENT AND ANY LOOSE
AGGREGATE IN THE CRACK WALL.
CLEANING
USE COMPRESSED AIR OR A HEAT LANCE TO CLEAN THE
CRACK FACES AND THE PAVEMENT SURFACES EXTENDING A
MINIMUM OF 1/2 INCH FROM THE CRACK EDGES. USE A
MULTIPLE-PASS TECHNIQUE UNTIL THE SURFACES ARE FREE
OF DUST, DIRT, OLD SEALANT RESIDUE, MOISTURE, OR
FOREIGN DEBRIS THAT MIGHT PREVENT THE SEALANT
MATERIAL FROM BONDING TO THE ASPHALT PAVEMENT. USE A
HEAT LANCE WHEN PAVEMENT TEMPERATURE IS LESS THAN 40
DEGREES F. DO NOT BURN THE PAVEMENT, A SLIGHT
DARKENING IS ACCEPTABLE. IMMEDIATELY FOLLOW THE HEAT
LANCE WITH THE SEALING OPERATION.
BACKER ROD MATERIAL
WHEN REQUIRED, USE BACKER ROD MATERIAL IN ALL CRACKS
THAT OTHERWISE WOULD REQUIRE EXCESSIVE SEALANT OR
EXCEED THE SEALANT RESERVOIR DEPTH. INSERT THE
BACKER ROD MATERIAL INTO THE LOWER PORTION OF THE
CRACK AS SHOWN ON THE DRAWINGS. PLACE THE BACKER
ROD SO THAT THE TOP OF THE BACKER ROD IS A MAXIMUM OF
3/4 INCH AND A MINIMUM WIDTH TO DEPTH RATIO OF 1 BELOW
THE TOP OF THE PAVEMENT. ENSURE THAT THE BACKER ROD
MATERIAL IS PLACED EVENLY AT THE SPECIFIED DEPTH AND IS
NOT STRETCHED OR TWISTED DURING INSTALLATION.
RATE OF PROGRESS OF CRACK PREPARATION
LIMIT THE STAGES OF CRACK PREPARATION, WHICH INCLUDE
ROUTING, AIR PRESSURE OR HEAT LANCE CLEANING AND
PLACING OF THE BACKER ROD MATERIAL, TO ONLY THAT
LINEAR FOOTAGE THAT CAN BE SEALED DURING THE SAME
DAY.
PREPARATION OF SEALANT
DO NOT HEAT HOT-POURED SEALANTS IN EXCESS OF THE SAFE
HEATING TEMPERATURE RECOMMENDED BY THE
MANUFACTURER, AS SHOWN ON THE SEALANT CONTAINERS.
WITHDRAW AND WASTE SEALANT THAT HAS BEEN
OVERHEATED OR SUBJECTED TO APPLICATION TEMPERATURES
FOR OVER 4 HOURS OR THAT HAS REMAINED IN THE
APPLICATOR AT THE END OF THE DAY'S OPERATION.
INSTALLATION OF SEALANT
SUBMIT MANUFACTURER'S INSTRUCTIONS 3 DAYS PRIOR TO
THE USE OF THE MATERIAL ON THE PROJECT. INSTALLATION
OF THE MATERIAL WILL NOT BE ALLOWED UNTIL THE
INSTRUCTIONS ARE RECEIVED.
TIME OF APPLICATION
SEAL CRACKS IMMEDIATELY FOLLOWING FINAL CLEANING AND
DRYING OF THE CRACK WALLS AND FOLLOWING THE
PLACEMENT OF THE BACKER ROD MATERIAL (WHEN
REQUIRED). PLACE SEALANT ONLY WHEN CRACKS ARE DRY.
RECLEAN CRACKS THAT CANNOT BE SEALED UNDER THE
CONDITIONS SPECIFIED, OR WHEN RAIN INTERRUPTS SEALING
OPERATIONS, AND ALLOW TO DRY OR DRY BY MECHANICAL
MEANS PRIOR TO INSTALLING THE SEALANT.
SEALING THE CRACK
IMMEDIATELY PRECEDING, BUT NOT MORE THAN 50 FEET
AHEAD OF THE CRACK SEALING OPERATIONS, PERFORM A
FINAL CLEANING AND DRYING WITH COMPRESSED AIR OR HEAT
LANCE. THIS DISTANCE CAN BE INCREASED IF DEMONSTRATED
AND APPROVED DURING THE TEST SECTION. FILL THE CRACKS
FROM THE BOTTOM OF RESERVOIR FORMED BY THE ROUTING
OR THE TOP OF THE BACKER ROD UP TO 1/4 INCH BELOW THE
PAVEMENT SURFACE. REMOVE EXCESS OR SPILLED SEALANT
FROM THE PAVEMENT BY APPROVED METHODS AND DISCARD
IT. INSTALL THE SEALANT IN A MANNER WHICH PREVENTS THE
FORMATION OF VOIDS AND ENTRAPPED AIR. MAKE MULTIPLE
PASSES WITH THE APPLICATOR WAND AS NECESSARY TO
OBTAIN THE SPECIFIED SEALANT DEPTH FROM THE PAVEMENT
SURFACE. DO NOT USE GRAVITY METHODS OR POURING POTS
TO INSTALL THE SEALANT MATERIAL. DO NOT PERMIT TRAFFIC
OVER NEWLY SEALED PAVEMENT UNTIL AUTHORIZED. CHECK
SEALED CRACKS FREQUENTLY TO ENSURE THAT THE NEWLY
INSTALLED SEALANT IS CURED TO A TACK-FREE CONDITION
WITHIN 3 HOURS.
CLEANUP
UPON COMPLETION OF THE PROJECT, REMOVE UNUSED
MATERIALS FROM THE SITE AND LEAVE THE PAVEMENT IN A
CLEAN CONDITION.
SECTION 2 - PAVEMENT MARKINGS
SUBMITTALS
SEE TABLE.
WEATHER LIMITATIONS
APPLY PAINT TO CLEAN, DRY SURFACES, AND UNLESS
OTHERWISE APPROVED, ONLY WHEN THE AIR AND PAVEMENT
SURFACE TEMPERATURE IS AT LEAST 5 DEGREES ABOVE THE
DEW POINT AND THE AIR AND PAVEMENT TEMPERATURES ARE
ABOVE 40 DEGREES F AND LESS THAN 95 DEGREES F FOR
OIL-BASED MATERIALS; ABOVE 50 DEGREES F AND LESS THAN
110 DEGREES F FOR WATER-BASED MATERIALS. MAINTAIN
PAINT TEMPERATURE WITHIN THESE SAME LIMITS.
EQUIPMENT
MACHINES, TOOLS, AND EQUIPMENT USED IN THE
PERFORMANCE OF THE WORK SHALL BE APPROVED BY THE
CONTRACTING OFFICER AND MAINTAINED IN SATISFACTORY
OPERATING CONDITION. SUBMIT CONSTRUCTION EQUIPMENT
LIST FOR APPROVAL BY THE CONTRACTING OFFICER.
APPLICATION EQUIPMENT SHALL BE MOBILE AND
MANEUVERABLE TO THE EXTENT THAT STRAIGHT LINES CAN BE
FOLLOWED AND NORMAL CURVES CAN BE MADE IN A TRUE
ARC.
SELF-PROPELLED OR MOBILE-DRAWN PNEUMATIC SPRAYING
MACHINES
PROVIDE SELF-PROPELLED OR MOBILE-DRAWN PNEUMATIC
SPRAYING MACHINE WITH SUITABLE ARRANGEMENTS OF
ATOMIZING NOZZLES AND CONTROLS TO OBTAIN THE
SPECIFIED RESULTS. PROVIDE MACHINE HAVING A SPEED
DURING APPLICATION CAPABLE OF APPLYING THE STRIPE
WIDTHS INDICATED AT THE PAINT COVERAGE RATE SPECIFIED
HEREIN AND OF EVEN UNIFORM THICKNESS WITH CLEAR-CUT
EDGES. THE EQUIPMENT FOR APPLYING THE PAINT FOR
AIRFIELD PAVEMENTS SHALL BE A SELF-PROPELLED OR
MOBILE-DRAWN PNEUMATIC SPRAYING MACHINE WITH AN
ARRANGEMENT OF ATOMIZING NOZZLES CAPABLE OF
APPLYING A WIDTH OF LINE AT ANY ONE TIME IN MULTIPLES OF
6 INCHES, FROM 6 TO 36 INCHES. PROVIDE PAINT APPLICATOR
WITH PAINT RESERVOIRS OR TANKS OF SUFFICIENT CAPACITY
AND SUITABLE GAGES TO APPLY PAINT IN ACCORDANCE WITH
REQUIREMENTS SPECIFIED. EQUIP TANKS WITH SUITABLE
AIR-DRIVEN MECHANICAL AGITATORS. EQUIP SPRAY
MECHANISM WITH QUICK-ACTION VALVES CONVENIENTLY
LOCATED, AND INCLUDE NECESSARY PRESSURE REGULATORS
AND GAGES IN FULL VIEW AND REACH OF THE OPERATOR.
INSTALL PAINT STRAINERS IN PAINT SUPPLY LINES TO ENSURE
FREEDOM FROM RESIDUE AND FOREIGN MATTER THAT MAY
CAUSE MALFUNCTION OF THE SPRAY GUNS. THE PAINT
APPLICATOR SHALL BE READILY ADAPTABLE FOR ATTACHMENT
OF AN AIR-ACTUATED DISPENSER FOR THE REFLECTIVE MEDIA
APPROVED FOR USE. PROVIDE PNEUMATIC SPRAY GUNS FOR
HAND APPLICATION OF PAINT IN AREAS WHERE THE MOBILE
PAINT APPLICATOR CANNOT BE USED. APPLICATOR FOR
WATER-BASED MARKINGS SHALL BE EQUIPPED WITH
NON-STICK COATED HOSES; METAL PARTS IN CONTACT WITH
THE PAINT MATERIAL SHALL BE CONSTRUCTED OF GRADE 302,
304, 316, OR EQUAL STAINLESS STEEL.
WATERBLAST EQUIPMENT
THE WATER PRESSURE SHALL BE SPECIFIED AT 2600 PSI AT 140
DEGREES F IN ORDER TO ADEQUATELY CLEAN THE SURFACES
TO BE MARKED. WATER WILL BE FURNISHED AT NO COST TO
THE CONTRACTOR FROM A FIRE HYDRANT DESIGNATED BY THE
CONTRACTING OFFICER OR AUTHORIZED REPRESENTATIVE
AND LOCATED WITHIN A REASONABLE PROXIMITY TO THE
WORK AREA. THE CONTRACTOR SHALL INSTALL A GATE VALVE
AND A BACK-FLOW PREVENTION DEVICE ON THE FIRE HYDRANT
TAP. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT,
MATERIAL, AND LABOR REQUIRED TO OBTAIN AND DELIVER
WATER FROM THE DESIGNATED FIRE HYDRANT TO THE WORK
AREA(S).
MARKING REMOVAL EQUIPMENT
EQUIPMENT SHALL BE MOUNTED ON RUBBER TIRES AND SHALL
BE CAPABLE OF REMOVING MARKINGS FROM THE PAVEMENT
WITHOUT DAMAGING THE PAVEMENT SURFACE OR JOINT
SEALANT. WATERBLASTING EQUIPMENT SHALL BE CAPABLE OF
PRODUCING AN ADJUSTABLE, PRESSURIZED STREAM OF
WATER. SANDBLASTING EQUIPMENT SHALL INCLUDE AN AIR
COMPRESSOR, HOSES, AND NOZZLES. THE COMPRESSOR
SHALL BE EQUIPPED WITH TRAPS TO MAINTAIN THE AIR FREE
OF OIL AND WATER.
MAINTENANCE OF TRAFFIC - AIRFIELD
THE PERFORMANCE OF WORK IN THE CONTROLLED ZONES OF
AIRFIELDS SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER AND WITH THE FLIGHT OPERATIONS OFFICER. VERBAL
COMMUNICATIONS SHALL BE MAINTAINED WITH THE CONTROL
TOWER BEFORE AND DURING WORK IN THE CONTROLLED
ZONES OF THE AIRFIELD. THE CONTROL TOWER SHALL BE
ADVISED WHEN THE WORK IS COMPLETED. A RADIO FOR THIS
PURPOSE WILL BE PROVIDED BY THE GOVERNMENT. THE
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE RADIO
AND SHALL REIMBURSE THE GOVERNMENT FOR REPAIR OR
REPLACEMENT OF THE RADIO IF IT IS LOST, DAMAGED, OR
DESTROYED.
REFLECTIVE MEDIA FOR AIRFIELD
FS TT-B-1325, TYPE I, GRADATION A.
PAINT SURFACE PREPARATION
ALLOW NEW PAVEMENT SURFACES TO CURE FOR A PERIOD OF
NOT LESS THAN 30 DAYS BEFORE APPLICATION OF MARKING
MATERIALS. THOROUGHLY CLEAN SURFACES TO BE MARKED
BEFORE APPLICATION OF THE PAINT. REMOVE DUST, DIRT, AND
OTHER GRANULAR SURFACE DEPOSITS BY SWEEPING,
BLOWING WITH COMPRESSED AIR, RINSING WITH WATER, OR A
COMBINATION OF THESE METHODS AS REQUIRED. REMOVE
RUBBER DEPOSITS, EXISTING PAINT MARKINGS, RESIDUAL
CURING COMPOUNDS, AND OTHER COATINGS ADHERING TO
THE PAVEMENT BY WATER BLASTING ACCORDING TO THE
REMOVAL REQUIREMENTS AND PROCEDURES OUTLINED IN
SECTION 2. FOR PORTLAND CEMENT CONCRETE PAVEMENT,
GRINDING, LIGHT SHOT BLASTING, AND LIGHT SCARIFICATION,
TO A RESULTING PROFILE EQUAL TO ICRI 03732 CSP 2, CSP 3,
AND CSP 4, RESPECTIVELY, CAN BE USED IN ADDITION TO
WATER BLASTING, TO EITHER REMOVE EXISTING COATINGS OR
FOR SURFACE PREPARATION ON MOST PAVEMENTS: SHOT
BLASTING SHALL NOT BE USED ON AIRFIELD PAVEMENTS DUE
TO THE POTENTIAL OF FOREIGN OBJECT DAMAGE (FOD)
TO AIRCRAFT. SCRUB AFFECTED AREAS, WHERE OIL OR
GREASE IS PRESENT ON OLD PAVEMENTS TO BE MARKED, WITH
SEVERAL APPLICATIONS OF TRISODIUM PHOSPHATE SOLUTION
OR OTHER APPROVED DETERGENT OR DEGREASER AND RINSE
THOROUGHLY AFTER EACH APPLICATION. AFTER CLEANING
OIL-SOAKED AREAS, SEAL WITH SHELLAC OR PRIMER
RECOMMENDED BY THE MANUFACTURER TO PREVENT
BLEEDING THROUGH THE NEW PAINT. DO NOT COMMENCE
PAINTING IN ANY AREA UNTIL PAVEMENT SURFACES ARE DRY
AND CLEAN.
APPLICATION
APPLY PAVEMENT MARKINGS TO DRY PAVEMENT ONLY. THE
CONTRACTOR SHALL TEST THE PAVEMENT SURFACE FOR
MOISTURE BEFORE BEGINNING WORK AFTER EACH PERIOD OF
RAINFALL, FOG, HIGH HUMIDITY, OR CLEANING, OR WHEN THE
AMBIENT TEMPERATURE HAS FALLEN BELOW THE DEW POINT.
DO NOT COMMENCE MARKING UNTIL THE PAVEMENT IS
SUFFICIENTLY DRY AND THE PAVEMENT CONDITION HAS BEEN
APPROVED BY THE CO OR AUTHORIZED REPRESENTATIVE.
EMPLOY THE "PLASTIC WRAP METHOD" TO TEST THE
PAVEMENT FOR MOISTURE AS FOLLOWS: COVER THE
PAVEMENT WITH A 300 MM BY 300 MM (12 INCH BY 12 INCH)
SECTION OF CLEAR PLASTIC WRAP AND SEAL THE EDGES WITH
TAPE. AFTER 15 MINUTES, EXAMINE THE PLASTIC WRAP FOR
ANY VISIBLE MOISTURE ACCUMULATION INSIDE THE PLASTIC.
DO NOT BEGIN MARKING OPERATIONS UNTIL THE TEST CAN BE
PERFORMED WITH NO VISIBLE MOISTURE ACCUMULATION
INSIDE THE PLASTIC WRAP.
PAINTING
APPLY PAINT PNEUMATICALLY WITH APPROVED EQUIPMENT AT
RATE OF COVERAGE SPECIFIED HEREIN. PROVIDE GUIDELINES
AND TEMPLATES AS NECESSARY TO CONTROL PAINT
APPLICATION. TAKE SPECIAL PRECAUTIONS IN MARKING
NUMBERS, LETTERS, AND SYMBOLS. MANUALLY PAINT
NUMBERS, LETTERS, AND SYMBOLS. SHARPLY OUTLINE ALL
EDGES OF MARKINGS. THE MAXIMUM DRYING TIME
REQUIREMENTS OF THE PAINT SPECIFICATIONS WILL BE
STRICTLY ENFORCED, TO PREVENT UNDUE SOFTENING OF
BITUMEN, AND PICKUP, DISPLACEMENT, OR DISCOLORATION BY
TIRES OF TRAFFIC. DISCONTINUE PAINTING OPERATIONS IF
THERE IS A DEFICIENCY IN DRYING OF THE MARKINGS UNTIL
CAUSE OF THE SLOW DRYING IS DETERMINED AND
CORRECTED.
REFLECTIVE MEDIA
APPLICATION OF REFLECTIVE MEDIA SHALL IMMEDIATELY
FOLLOW THE APPLICATION OF PAINT. ACCOMPLISH DROP-ON
APPLICATION OF THE GLASS SPHERES TO ENSURE EVEN
DISTRIBUTION AT THE SPECIFIED RATE OF COVERAGE. SHOULD
THERE BE MALFUNCTION OF EITHER PAINT APPLICATOR OR
REFLECTIVE MEDIA DISPENSER, DISCONTINUE OPERATIONS
UNTIL DEFICIENCY IS CORRECTED.
INSPECTION
EXAMINE MATERIAL AT THE JOB SITE TO DETERMINE THAT IT IS
THE MATERIAL REFERENCED IN THE REPORT OF TEST RESULTS
OR CERTIFICATE OF COMPLIANCE. A CERTIFICATE OF
COMPLIANCE SHALL BE ACCOMPANIED BY TEST RESULTS
SUBSTANTIATING CONFORMANCE TO THE SPECIFIED
REQUIREMENTS.
SU
BM
IT
TE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y:
RE
VI
EW
ED
B Y:
CH
IE
F, E
NG
IN
EE
RI
NG
F
LIG
HT
SI
ZE
CO
NT
RA
CT
N O:
OP
TI
ON
AL
F
IE
LD
1:
OP
TI
ON
AL
F
IE
LD
2:
4T
H
BA
SE
C
IV
IL
EN
GI
NE
ER
S
S
OU
TH
W
AR
TH
OG
D
RI
VE
GR
IS
SO
M
AR
B, IN
DI
AN
A, SHEET OF
SHEET NUMBER
PROJECT NO.
ISSUE DATE: VER.
PR
OJ
EC
T
TI
TL
E:
SH
EE
T
NA
ME
AN
SI
D
FA
-X
-X X-
XX
XX
FA
CI
LIT
Y
XX
X
JA
W
OR
SK
I
JA
W
OR
SK
I
AN
D
SI
DE
W
AL
KS
PA
RK
IN
G
LO
TS
MA
IN
TA
IN
R
OA
DS
1FEB 2025
CTGB25-2003
R:
\4
A
RW
\E
RM
\M
SG
\C
ES
\C
E\
CE
C\
AC
TI
VE
F
IL
ES
1, 7, 0, A\
P ro je ct
D es ig n
Fi le s\
-2
Pa ve m en t I
D
IQ
(S us ta in
B as e Pa ve m en ts
)\C
AD
\1 _8
_2
5\
C
1-
Ju st S ec tio n N um be rs .d w g, /2
1/
:4 6:
P
M , A ut oC
AD
P
D F
(G en er al
D oc um en ta tio
n) .p c3
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
VERSION
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
C002
CI
VI
L
GR
EE
N
PE
RR
Y
SP
EC
IF
IC
AT
IO
NS
SECTION 3 - SEALING JOINTS IN PAVEMENT
TEST REQUIREMENTS
TEST THE SEALANT AND BACKUP OR SEPARATING MATERIAL FOR
CONFORMANCE WITH THE REFERENCED MATERIAL SPECIFICATION.
PERFORM TESTING OF THE MATERIALS IN AN APPROVED
INDEPENDENT LABORATORY AND SUBMIT CERTIFIED COPIES OF
THE TEST REPORTS FOR APPROVAL 3 DAYS PRIOR TO THE USE OF
THE MATERIALS AT THE JOB SITE. SUBMIT SAMPLES TO BE
RETAINED BY THE GOVERNMENT FOR POSSIBLE FUTURE TESTING IF
THE MATERIALS APPEAR DEFECTIVE DURING OR AFTER
APPLICATION. CONFORMANCE WITH THE REQUIREMENTS OF THE
LABORATORY TESTS SPECIFIED DOES NOT CONSTITUTE FINAL
ACCEPTANCE OF THE MATERIALS. BASE FINAL ACCEPTANCE ON
THE PERFORMANCE OF THE IN-PLACE MATERIALS. SUBMIT
SAMPLES OF THE MATERIALS (SEALANT, PRIMER IF REQUIRED, AND
BACKUP MATERIAL), IN SUFFICIENT QUANTITY FOR TESTING AND
APPROVAL 3 DAYS PRIOR TO THE BEGINNING OF WORK. DO NOT
USE MATERIAL UNTIL IT HAS BEEN APPROVED.
TRIAL JOINT SEALANT INSTALLATION
PRIOR TO CLEANING AND SEALING THE JOINTS FOR THE ENTIRE
PROJECT, PREPARE A TEST SECTION AT LEAST 200 FT LONG USING
THE SPECIFIED MATERIALS AND APPROVED EQUIPMENT, SO AS TO
DEMONSTRATE THE PROPOSED JOINT PREPARATION AND SEALING
OF THE TYPES OF JOINTS IN THE PROJECT. FOLLOWING THE
COMPLETION OF THE TEST SECTION AND BEFORE ANY OTHER
JOINT IS SEALED, INSPECT THE TEST SECTION TO DETERMINE THAT
THE MATERIALS AND INSTALLATION MEET THE REQUIREMENTS
SPECIFIED. INSPECT JOINT SEAL TEST SECTION. CORRECT
DEFICIENCIES AND OBTAIN APPROVAL OF TEST SECTION PRIOR TO
INSTALLING JOINT SEALS. IF IT IS DETERMINED THAT THE
MATERIALS OR INSTALLATION DO NOT MEET THE REQUIREMENTS,
REMOVE THE MATERIALS, AND RECLEAN AND RESEAL THE JOINTS
AT NO COST TO THE GOVERNMENT. PREPARE AND SEAL OTHER
JOINTS IN THE MANNER APPROVED FOR SEALING THE TEST
SECTION. NOTIFY THE CONTRACTING OFFICER UPON COMPLETION
OF THE TEST SECTION.
JOINT SEALANTS
PROVIDE JOINT SEALANT CONFORMING TO ASTM D5893, AASHTO
M220, AND AASHTO M324 TYPE2 FOR SILICONE JOINT SEALANT,
PREFORMED JOINT MATERIAL, HOT POUR (ASPHALT) JOINT
SEALANT, RESPECTIVELY, BASED ON THE JOINT TYPE INDICATED IN
THE DRAWINGS.
PRIMERS
USE PRIMERS IN ACCORDANCE WITH THE RECOMMENDATION OF
THE MANUFACTURER.
BOND BREAKERS
BLOCKING MEDIA/BACKUP MATERIALS
PROVIDE BACKUP (JOINT FILLER) MATERIAL THAT IS A
COMPRESSIBLE, NONSHRINKING, NONSTAINING, NONABSORBING,
NONREACTIVE MATERIAL WITH THE SEALANT. USE BACKUP
MATERIAL COMPLIANT WITH ASTM D5249. USE MATERIAL WITH A
MELTING POINT AT LEAST 5 DEGREES F GREATER THAN THE
POURING TEMPERATURE OF THE SEALANT BEING USED WHEN
TESTED IN ACCORDANCE WITH ASTM D789. USE MATERIAL WITH A
WATER ABSORPTION OF NOT MORE THAN 5 PERCENT OF THE
SAMPLE WEIGHT WHEN TESTED IN ACCORDANCE WITH ASTM C1016.
USE BACKUP (JOINT FILLER) MATERIAL THAT IS 25 PLUS OR MINUS 5
PERCENT LARGER IN DIAMETER THAN THE NOMINAL WIDTH OF THE
CRACK. USE BLOCKING MEDIA CONSISTENT WITH THE SEALANT
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
BOND BREAKING TAPES
PROVIDE A BOND BREAKING TAPE OR SEPARATING MATERIAL THAT
IS A FLEXIBLE, NONSHRINKABLE, NONABSORBING, NONSTAINING,
AND NONREACTING ADHESIVE-BACKED TAPE. USE MATERIAL WITH
A MELTING POINT AT LEAST 5 DEGREES F GREATER THAN THE
POURING TEMPERATURE OF THE SEALANT BEING USED WHEN
TESTED IN ACCORDANCE WITH ASTM D789. USE BOND BREAKER
TAPE APPROXIMATELY 1/8 IN WIDER THAN THE NOMINAL WIDTH OF
THE JOINT AND THAT DOES NOT BOND TO THE SEALANT. USE BOND
BREAKING TAPE CONSISTENT WITH THE SEALANT
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
EXECUTING EQUIPMENT
SUBMIT EQUIPMENT LIST AND DESCRIPTION OF THE EQUIPMENT TO
BE USED AND A STATEMENT FROM THE SUPPLIER OF THE SEALANT
THAT THE PROPOSED EQUIPMENT IS ACCEPTABLE FOR INSTALLING
THE SPECIFIED SEALANT. USE EQUIPMENT FOR HEATING, MIXING,
AND INSTALLING SEALS IN ACCORDANCE WITH THE INSTRUCTIONS
PROVIDED BY THE SEALANT MANUFACTURER. PROVIDE
EQUIPMENT, TOOLS, AND ACCESSORIES NECESSARY TO CLEAN
EXISTING JOINTS AND INSTALL LIQUID JOINT SEALANTS. MAINTAIN
MACHINES, TOOLS, AND OTHER EQUIPMENT IN PROPER WORKING
CONDITION. SUBMIT A LIST OF PROPOSED EQUIPMENT TO BE USED
IN PERFORMANCE OF CONSTRUCTION WORK INCLUDING
DESCRIPTIVE DATA, 3 DAYS PRIOR TO USE ON THE PROJECT.
JOINT CLEANING EQUIPMENT
CONCRETE SAW
PROVIDE A SELF-PROPELLED POWER SAW, WITH WATER-COOLED
DIAMOND OR ABRASIVE SAW BLADES, FOR CUTTING JOINTS TO THE
DEPTHS AND WIDTHS SPECIFIED, FOR REFACING JOINTS, CLEANING
SAWED JOINTS WHERE SANDBLASTING DOES NOT PROVIDE A
CLEAN JOINT, WIDENING, OR DEEPENING EXISTING JOINTS AS
SPECIFIED WITHOUT DAMAGING THE SIDES, BOTTOM, OR TOP EDGE
OF JOINTS. PERMIT SINGLE OR GANG TYPE BLADES WITH ONE OR
MORE BLADES MOUNTED IN TANDEM FOR FAST CUTTING. SELECT
SAW ADEQUATELY POWERED AND SIZED TO CUT SPECIFIED
OPENING WITH NOT MORE THAN TWO PASSES OF THE SAW
THROUGH THE JOINT.
AIR COMPRESSOR
USE A PORTABLE AIR COMPRESSOR CAPABLE OF OPERATING THE
SANDBLASTING EQUIPMENT AND CAPABLE OF BLOWING OUT SAND,
WATER, DUST ADHERING TO SIDEWALLS OF CONCRETE, AND
OTHER OBJECTIONABLE MATERIALS FROM THE JOINTS. USE A
COMPRESSOR THAT PROVIDES AIR AT A PRESSURE NOT LESS THAN
90 PSI AND A MINIMUM RATE OF 150 CUBIC FT OF AIR PER MINUTE
AT THE NOZZLES AND FREE OF OIL.
VACUUM SWEEPER
USE A SELF-PROPELLED, VACUUM PICKUP SWEEPER CAPABLE OF
COMPLETELY REMOVING LOOSE SAND, WATER, JOINT MATERIAL,
AND DEBRIS FROM PAVEMENT SURFACE.
HAND TOOLS
PERMIT THE USE OF HAND TOOLS, SUCH AS BROOMS AND CHISELS,
WHEN APPROVED, FOR REMOVING DEFECTIVE SEALANT FROM A
CRACK AND REPAIRING OR CLEANING THE CRACK FACES.
SEALING EQUIPMENT
USE JOINT SEALING EQUIPMENT OF A TYPE REQUIRED BY THE
SEALANT MANUFACTURER'S INSTALLATION INSTRUCTIONS. USE
EQUIPMENT CAPABLE OF INSTALLING SEALANT TO THE DEPTHS,
WIDTHS AND TOLERANCES INDICATED. DO NOT PROCEED WITH
JOINT SEALING WHEN MALFUNCTIONS ARE NOTED UNTIL THE
MALFUNCTIONS ARE CORRECTED.
COLD-APPLIED, SINGLE-COMPONENT SEALING EQUIPMENT
USE EQUIPMENT FOR INSTALLING ASTM D5893/D5893M SINGLE
COMPONENT JOINT SEALANTS THAT CONSISTS OF AN EXTRUSION
PUMP, AIR COMPRESSOR, FOLLOWING PLATE, HOSES, AND NOZZLE
FOR TRANSFERRING THE SEALANT FROM THE STORAGE
CONTAINER INTO THE JOINT OPENING. USE A NOZZLE WITH
DIMENSIONS THAT ALLOWS THE TIP OF THE NOZZLE TO EXTEND
INTO THE JOINT TO ALLOW SEALING FROM THE BOTTOM OF THE
JOINT TO THE TOP. MAINTAIN THE INITIALLY APPROVED EQUIPMENT
IN GOOD WORKING CONDITION, SERVICED IN ACCORDANCE WITH
THE SUPPLIER'S INSTRUCTIONS, AND UNALTERED IN ANY WAY
WITHOUT OBTAINING PRIOR APPROVAL. USE LINED HOSES AND
SEALS TO PREVENT MOISTURE PENETRATION AND WITHSTAND
PUMPING PRESSURES. USE EQUIPMENT FREE OF CONTAMINATION
FROM PREVIOUSLY USED OR OTHER TYPE SEALANT. PERMIT USE
OF SMALL HAND-HELD AIR-POWERED EQUIPMENT (I.E., CAULKING
GUNS) FOR SMALL APPLICATIONS.
PREPARATION OF JOINTS
UNLESS OTHERWISE INDICATED, REMOVE EXISTING MATERIAL,
SAW, CLEAN AND RESEAL JOINTS. DO NOT PROCEED WITH FINAL
CLEANING OPERATIONS BY MORE THAN ONE WORKING DAY IN
ADVANCE OF SEALANT. CLEAN JOINTS BY REMOVING EXISTING
JOINT SEALING COMPOUND, BOND-BREAKERS, DIRT, LAITANCE,
CURING COMPOUND, FILLER, AND PROTRUSIONS OF HARDENED
CONCRETE FROM THE SIDES AND UPPER EDGES OF THE JOINT
SPACE TO BE SEALED AND OTHER FOREIGN MATERIAL WITH THE
EQUIPMENT. DO NOT PERMIT CLEANING PROCEDURES THAT
DAMAGE JOINTS OR PREVIOUSLY REPAIRED PATCHES BY CHIPPING
OR SPALLING. REMOVE EXISTING SEALANT TO THE REQUIRED
DEPTH. PRECISE SHAPE AND SIZE OF EXISTING JOINTS VARY, AND
CONDITIONS OF JOINT WALLS AND EDGES VARY AND INCLUDE BUT
ARE NOT LIMITED TO ROUNDING, SQUARE EDGES, SLOPING, CHIPS,
VOIDS, DEPRESSIONS, AND PROJECTIONS.
EXISTING SEALANT REMOVAL
CUT LOOSE THE IN-PLACE SEALANT FROM BOTH JOINT FACES AND
TO THE REQUIRED DEPTH, USING THE CONCRETE SAW AS
SPECIFIED IN SECTION 3 HEADER: “CONCRETE SAW”. PROVIDE A
DEPTH SUFFICIENT TO ACCOMMODATE BLOCKING MEDIA AND BOND
BREAKERS THAT ARE REQUIRED TO MAINTAIN THE DEPTH OF NEW
SEALANT TO BE INSTALLED. FOR EXPANSION JOINTS, REMOVE
EXISTING SEALANT TO A DEPTH OF NOT LESS THAN 1 IN. WHEN
EXISTING PREFORMED EXPANSION-JOINT MATERIAL IS MORE THAN 1
IN BELOW THE SURFACE OF THE PAVEMENT, REMOVE EXISTING
SEALANT TO THE TOP OF THE PREFORMED JOINT FILLER. PRIOR TO
FURTHER CLEANING OPERATIONS, REMOVE LOOSE OLD SEALANT
REMAINING IN THE JOINT OPENING BY BLOWING WITH COMPRESSED
AIR. PERMIT USE OF HAND TOOLS TO REMOVE SEALANT FROM
RANDOM CRACKS. DO NOT PERMIT CHIPPING, SPALLING, OR OTHER
DAMAGE TO THE CONCRETE. CLEAN PAVEMENT SURFRACE WITH
VACUUM SWEEP. PROTECT PREVIOUSLY CLEANED JOINTS FROM
BEING CONTAMINATED BY SUBSEQUENT CLEANING OPERATIONS.
SAWING
REFACING OF JOINTS
ACCOMPLISH REFACING OF JOINTS USING A CONCRETE SAW AS
SPECIFIED IN SECTION 3 HEADER: “CONCRETE SAW” TO REMOVE
RESIDUAL OLD SEALANT AND A MINIMUM OF CONCRETE FROM THE
JOINT FACE TO PROVIDE EXPOSURE OF NEWLY CLEANED
CONCRETE, AND, IF REQUIRED, TO ENLARGE THE JOINT OPENING
TO THE WIDTH AND DEPTH SHOWN ON THE DRAWINGS. PROVIDE
EXPOSURE OF NEWLY CLEAN CONCRETE THROUGH REMOVAL.
REMOVE BURRS AND IRREGULARITIES FROM SIDES OF JOINT
FACES. STIFFEN THE BLADE WITH A SUFFICIENT NUMBER OF
DUMMY (USED) BLADES OR WASHERS. CLEAN, IMMEDIATELY
FOLLOWING THE SAWING OPERATION, THE JOINT OPENING USING A
WATER JET TO REMOVE SAW CUTTINGS AND DEBRIS AND
ADJACENT CONCRETE SURFACE. PROTECT ADJACENT PREVIOUSLY
CLEANED JOINT SPACES FROM RECEIVING WATER AND DEBRIS
DURING THE CLEANING OPERATION.
a. JOINT WIDENING (EXCEPT EXPANSION JOINTS): SAW
JOINTS HAVING GROOVES LESS THAN 3/8 IN WIDE AND
LESS THAN 1 IN DEEP TO A MINIMUM WIDTH OF 3/8 IN
AND TO THE MINIMUM DEPTH, OF 1 IN.
REFACING OF RANDOM CRACKS
ACCOMPLISH SAWING OF THE CRACKS USING A POWER-DRIVEN
CONCRETE SAW AS SPECIFIED IN SECTION 3 HEADER: “REFACING
OF JOINTS”. USE A SAW BLADE 6 IN OR LESS IN DIAMETER TO
ENABLE THE SAW TO FOLLOW THE TRACE OF THE CRACK. STIFFEN
THE BLADE WITH DUMMY (OR USED) BLADES OR WASHERS.
IMMEDIATELY FOLLOWING THE SAWING OPERATION, CLEAN THE
CRACK OPENING USING A WATER JET TO REMOVE SAW CUTTINGS
AND DEBRIS.
FINAL CLEANING OF JOINTS
FOLLOWING REMOVAL OF EXISTING SEALANT, AND SAWING, AND
IMMEDIATELY BEFORE RESEALING, CLEAN NEWLY EXPOSED
CONCRETE JOINT FACES AND PAVEMENT SURFACE EXTENDING TO
A MINIMUM OF 1/2 IN UP TO 2 IN FROM EACH JOINT EDGE BY
SANDBLASTING UNTIL CONCRETE SURFACES IN THE JOINT SPACE
ARE FREE OF SEALANTS, DUST, DIRT, WATER AND OTHER FOREIGN
MATERIALS THAT PREVENT BONDING OF NEW SEALANTS TO THE
CONCRETE. USE SAND PARTICLES OF THE PROPER SIZE AND
QUALITY FOR THE WORK. PERFORM SANDBLASTING WITH
SPECIFIED NOZZLES, AIR COMPRESSOR, AND OTHER APPURTENANT
EQUIPMENT. POSITION NOZZLES TO CLEAN THE JOINT FACES.
MAKE AT LEAST TWO PASSES; ONE FOR EACH JOINT FACE. MAKE
AS MANY PASSES AS REQUIRED FOR PROPER CLEANING.
IMMEDIATELY PRIOR TO SEALING THE JOINT, BLOW OUT THE JOINT
SPACES WITH COMPRESSED AIR UNTIL COMPLETELY FREE OF
SAND, WATER, AND DUST. INSTALL JOINT SEALANTS TO DRY
JOINTS. REPLACE EXPANSION JOINT FILLER MATERIAL DAMAGED IN
PERFORMING THE WORK WITH NEW MATERIALS OF THE SAME TYPE
AND DIMENSIONS AS THE EXISTING MATERIAL, OR WITH
APPROPRIATE BLOCKING MEDIA.
BOND BREAKER
AT THE TIME THE JOINTS RECEIVE THE FINAL CLEANING AND ARE
DRY, INSTALL BOND BREAKER MATERIAL AS INDICATED WITH A
STEEL WHEEL OR OTHER APPROVED DEVICE.
BLOCKING MEDIA (BACKER ROD) (EXCEPT FOR EXPANSION JOINTS)
WHEN THE JOINT OPENING IS OF A GREATER DEPTH THAN
INDICATED FOR THE SEALANT DEPTH, PLUG OR SEAL OFF THE
LOWER PORTION OF THE JOINT OPENING USING A BLOCKING
MEDIA/BACK-UP MATERIAL TO PREVENT THE ENTRANCE OF THE
SEALANT BELOW THE SPECIFIED DEPTH. TAKE CARE TO ENSURE
THAT THE BLOCKING MEDIA/BACKUP MATERIAL IS PLACED AT THE
SPECIFIED DEPTH AND IS NOT STRETCHED OR TWISTED DURING
INSTALLATION.
BOND BREAKING TAPE
WHERE INSERTS OR FILLER MATERIALS CONTAIN BITUMEN, OR THE
DEPTH OF THE JOINT OPENING DOES NOT ALLOW FOR THE USE OF
A BACKUP MATERIAL, INSERT A BOND BREAKER SEPARATING TAPE
TO PREVENT INCOMPATIBILITY WITH THE FILLER MATERIALS AND
THREE-SIDED ADHESION OF THE SEALANT. BOND THE TAPE TO THE
BOTTOM OF THE JOINT OPENING TO PREVENT IT FROM FLOATING
UP INTO THE NEW SEALANT.
RATE OF PROGRESS OF JOINT PREPARATION
LIMIT THE STAGES OF JOINT PREPARATION, INCLUDING
SANDBLASTING, AIR PRESSURE CLEANING AND PLACING OF THE
BACK-UP MATERIAL TO ONLY THAT LINEAL FOOTAGE THAT CAN BE
SEALED DURING THE SAME DAY.
DISPOSAL OF DEBRIS
SWEEP PAVEMENT SURFACE TO REMOVE EXCESS JOINT MATERIAL,
DIRT, WATER, SAND, AND OTHER DEBRIS BY VACUUM SWEEPERS
OR HAND BROOMS.
PREPARATION OF SEALANT
SINGLE-COMPONENT, COLD-APPLIED SEALANTS
INSPECT THE ASTM D5893/D5893M SEALANT AND CONTAINERS
PRIOR TO USE. REJECT MATERIALS THAT CONTAIN WATER, HARD
CAKING OF ANY SEPARATED CONSTITUENTS, NONREVERSIBLE JELL,
OR MATERIALS THAT ARE OTHERWISE UNSATISFACTORY. DO NOT
REJECT SEALANTS THAT EXHIBIT SETTLEMENT OF CONSTITUENTS
IN A SOFT MASS THAT CAN BE READILY AND UNIFORMLY REMIXED IN
THE FIELD WITH SIMPLE TOOLS.
INSTALLATION OF SEALANT
TIME OF APPLICATION
AFTER APPROVAL OF THE TEST SECTION, SEAL JOINTS
IMMEDIATELY FOLLOWING FINAL CLEANING AND PLACING OF BOND
BREAKERS. COMMENCE SEALING JOINTS WHEN WALLS ARE DUST
FREE AND DRY, AND WHEN WEATHER CONDITIONS MEET SEALANT
MANUFACTURER'S
INSTRUCTIONS. IF THE ABOVE CONDITIONS CANNOT BE MET, OR
WHEN RAIN INTERRUPTS SEALING OPERATIONS, RECLEAN AND
PERMIT THE JOINTS TO DRY PRIOR TO INSTALLING THE SEALANT.
SEALING JOINTS
DO NOT INSTALL JOINT SEALANT UNTIL JOINTS TO BE SEALED HAVE
BEEN INSPECTED AND APPROVED. INSTALL BOND BREAKER JUST
PRIOR TO POURING SEALANT. FILL THE JOINTS WITH SEALANT
FROM BOTTOM UP UNTIL JOINTS ARE UNIFORMLY FILLED SOLID
FROM BOTTOM TO TOP USING THE SPECIFIED EQUIPMENT FOR THE
TYPE OF SEALANT REQUIRED. FILL JOINTS TO 1/4 IN PLUS OR MINUS
1/16 IN BELOW TOP OF PAVEMENT, AND WITHOUT FORMATION OF
VOIDS OR ENTRAPPED AIR. DO NOT PERMIT GRAVITY METHODS OR
POURING POTS TO BE USED TO INSTALL THE SEALANT MATERIAL.
EXCEPT AS OTHERWISE PERMITTED, TOOL THE SEALANT
IMMEDIATELY AFTER APPLICATION TO PROVIDE FIRM CONTACT
WITH THE JOINT WALLS AND TO FORM THE INDICATED SEALANT
PROFILE BELOW THE PAVEMENT SURFACE. REMOVE EXCESS
SEALANT THAT HAS BEEN INADVERTENTLY SPILLED ON THE
PAVEMENT SURFACE. DO NOT PERMIT TRAFFIC OVER NEWLY
SEALED PAVEMENT UNTIL AUTHORIZED. WHEN A PRIMER IS
RECOMMENDED BY THE MANUFACTURER, APPLY IT EVENLY TO THE
JOINT FACES IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. CHECK SEALED JOINTS FREQUENTLY TO
ENSURE THAT NEWLY INSTALLED SEALANT IS CURED TO A
TACK-FREE CONDITION WITHIN THE SPECIFIED TIME. PROTECT NEW
SEALANT FROM RAIN DURING CURING PERIOD.
INSPECTION/FIELD QUALITY CONTROL
JOINT CLEANING
INSPECT JOINTS DURING THE CLEANING PROCESS TO CORRECT
IMPROPER EQUIPMENT AND CLEANING TECHNIQUES THAT DAMAGE
THE CONCRETE PAVEMENT IN ANY MANNER. APPROVE CLEANED
JOINTS PRIOR TO INSTALLATION OF THE SEPARATING OR BACK-UP
MATERIAL AND JOINT SEALANT.
SEALANT APPLICATION EQUIPMENT
INSPECT THE APPLICATION EQUIPMENT TO ENSURE CONFORMANCE
TO TEMPERATURE REQUIREMENTS, PROPER PROPORTIONING AND
MIXING (IF TWO-COMPONENT SEALANT) AND PROPER
INSTALLATION. SUSPEND OPERATIONS IF THERE IS EVIDENCES OF
BUBBLING, IMPROPER INSTALLATION, OR FAILURE TO CURE OR SET
UNTIL CAUSES OF THE DEFICIENCIES ARE DETERMINED AND
CORRECTED.
JOINT SEALANT
INSPECT THE JOINT SEALANT FOR PROPER RATE OF CURE AND SET,
BONDING TO THE JOINT WALLS, COHESIVE SEPARATION WITHIN THE
SEALANT, REVERSION TO LIQUID, ENTRAPPED AIR AND VOIDS.
REMOVE SEALANTS EXHIBITING THESE DEFICIENCIES PRIOR TO THE
FINAL ACCEPTANCE OF THE PROJECT FROM THE JOINT, WASTED,
AND REPLACE AT NO ADDITIONAL COST TO THE GOVERNMENT.
OBTAIN APPROVAL FOR EACH JOINT SEAL INSTALLATION.
FINAL ACCEPTANCE
REJECT SEALER THAT FAILS TO CURE PROPERLY, OR FAILS TO
BOND TO JOINT WALLS, OR REVERTS TO THE UNCURED STATE, OR
FAILS IN COHESION, OR SHOWS EXCESSIVE AIR VOIDS, BLISTERS,
SURFACE DEFECTS, SWELLING, OR OTHER DEFICIENCIES, OR IS
NOT PROPERLY RECESSED WITHIN INDICATED TOLERANCES.
REMOVE REJECTED SEALER AND RECLEAN AND RESEAL…