This document is an instruction template for calculating self-performed work requirements under the Veterans Affairs Acquisition Regulation (VAAR 852.219-73) "Limitations on Subcontracting" clause.

The template requires offerors to complete four calculations at proposal submission: (a) total proposed price, (b) amount projected to be paid to non-VetCert listed Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), (c) the percentage of non-VetCert work relative to total price, and (d) the percentage of self-performed work. The subcontracting limitations vary by contract type: A/E-Services contracts cannot pay more than 50% of government-paid amounts to non-SBA Certified VOSBs; general construction contracts cannot exceed 85% to non-certified SDVOSBs; and special trade contractor contracts cannot exceed 75% to non-certified SDVOSBs. Offerors must verify SDVOSB certification status through the SBA Veterans Small Business Certification Program (VetCert) portal at https://veterans.certify.sba.gov/.

View the file

Other files

File Type Posted
36C25726B0006 0006.pdf PDF
PCRA_Replace_Boilers.pdf PDF
36C25726B0006 0005.pdf PDF
Asbestos Survey Report September 2016 Building 2.pdf PDF
Asbestos and LBP Photolog Building 2 Final.pdf PDF
Lead Based Paint Inspection Report Building 2 Final.pdf PDF
ICRA_Replace_Boilers.pdf PDF
36C25726B0006 Site Visit Sign In Sheet.pdf PDF
36C25726B0006 1 Conformed Through Amendment 0004 Current as of 2026.06.12.pdf PDF
36C25726B0006 0004.pdf PDF
36C25726B0006 0001.pdf PDF
36C25726B0006 Boiler Plant Site Visit 2.pdf PDF
36C25726B0006 0003.pdf PDF
36C25726B0006 0002.pdf PDF
Site Visit Instructions Big Spring TX.pdf PDF
36C25726B0006 Solicitation Posting SAM.gov.pdf PDF
Attachment 2 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages1_62.pdf PDF
Attachment 3 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages62_124.pdf PDF
Attachment 8 Special Standard of Responsibility.pdf PDF
Attachment 5 ICRA Replace Boilers.pdf PDF
36C25726B0006 Solicitation.pdf PDF
Attachment 6 PCRA Replace Boilers.pdf PDF
Attachment 1 519-20-200 VABS AE Replace Boiler 100_Percent_Design Analysis.pdf PDF
Attachment 4 519-20-200 VABS AE Replace Boiler 100_Percent_Specifications.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK

IAW “Limitations on Subcontracting” (VAAR 852.219-73)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non *VetCert listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non *VetCert work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not SBA Certified VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not SBA Certified SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not SBA Certified SDVOSBs.

*SBA certification database on the SBA Veterans Small Business Certification Program (VetCert) portal at https://veterans.certify.sba.gov/]

File details come from the government source that posted it. Updated .