This is a Special Standard of Responsibility document outlining solicitation submittal requirements for offerors on a federal contract opportunity, likely involving Virginia (VAAR reference).

Offerors must submit three key compliance documents prior to solicitation closing. First, offerors must provide a Summary of Work-Related Injuries and Illnesses affirming no more than three serious violations, one repeat violation, or one willful OSHA or EPA violation within the past three years. Second, offerors must provide documentation demonstrating an Experience Modification Rate (EMR) of 1.0 or less. Third, offerors must complete and submit the certificate included in VAAR clause 852.219-75 regarding limitations on subcontracting. For partnerships or joint ventures, these submittal requirements apply to each contractor within the partnership or joint venture and to the entity itself, though EMR documentation is not required for subcontractors. Failure to submit the completed VAAR 852.219-75 certificate will result in automatic removal of the proposal from consideration for award.

View the file

Other files

File Type Posted
36C25726B0006 0006.pdf PDF
Lead Based Paint Inspection Report Building 2 Final.pdf PDF
PCRA_Replace_Boilers.pdf PDF
ICRA_Replace_Boilers.pdf PDF
Asbestos Survey Report September 2016 Building 2.pdf PDF
Asbestos and LBP Photolog Building 2 Final.pdf PDF
36C25726B0006 0005.pdf PDF
36C25726B0006 Site Visit Sign In Sheet.pdf PDF
36C25726B0006 0004.pdf PDF
36C25726B0006 1 Conformed Through Amendment 0004 Current as of 2026.06.12.pdf PDF
36C25726B0006 0001.pdf PDF
36C25726B0006 Boiler Plant Site Visit 2.pdf PDF
36C25726B0006 0003.pdf PDF
36C25726B0006 0002.pdf PDF
36C25726B0006 Solicitation Posting SAM.gov.pdf PDF
Site Visit Instructions Big Spring TX.pdf PDF
Attachment 7 Instructions for Calculation of Self-Performed Work.pdf PDF
Attachment 6 PCRA Replace Boilers.pdf PDF
Attachment 1 519-20-200 VABS AE Replace Boiler 100_Percent_Design Analysis.pdf PDF
Attachment 3 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages62_124.pdf PDF
Attachment 4 519-20-200 VABS AE Replace Boiler 100_Percent_Specifications.pdf PDF
Attachment 5 ICRA Replace Boilers.pdf PDF
36C25726B0006 Solicitation.pdf PDF
Attachment 2 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages1_62.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Standard of Responsibility

Solicitation Submittal Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)

1. OSHA or EPA Violation(s):

Offerors shall provide Summary of Work-Related Injuries and Illnesses, affirming that the

Offeror has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.

2. Experience Modification Rate (EMR):

Offerors shall provide documentation to show that the offeror has an Experience

Modification Rate (EMR) of equal to or less than 1.0.

3. Limitation on Subcontracting:

IAW VAAR 852.219-75 each offeror will review the clause and complete the certificate included in the clause. This certificate will be complete prior to solicitation closing and submitted with the proposal documents. Failure to comply with this requirement will result in removal of proposal for consideration for award.