This is Amendment 0006 to Solicitation 36C25726B0006 issued by the Department of Veterans Affairs, VA-VHA-RPOW-2026-0001, for work at Central Texas Veterans Health Care System in Temple, Texas. The amendment is effective July 30, 2026, with requisition/purchase request number 519-20-200.

The amendment makes three substantive changes to the solicitation: it inserts two FAR clauses (52.225-11 and 52.225-12 regarding Buy American requirements for construction materials under trade agreements, dated November 2025 and May 2014 respectively); removes FAR clause 52.249-10 and clarifies that terminations for default are governed under FAR clause 52.212-4 for commercial items; and establishes invoicing requirements whereby the awarded contractor must submit a Schedule of Values (SOV) with each invoice and may invoice only for SOV line items that have been fully completed during the billing period. The amendment also provides a vendor question and government response regarding electrical work. The vendor inquired about temporary feed points and drawings for maintaining power to MCC-B during MCC-A replacement. The government response specifies that MCC-B shall be temporarily fed from a new 400A Temporary Panel "T" per Drawing ET601, and that the government is determining which existing MCC-A loads must remain energized, with the contractor to confirm accommodation using available capacity on Temporary Panel "T" (approximately 200A spare capacity, with MCC-B drawing approximately 140A and leaving an estimated 60A available for additional requirements).

View the file

Other files

File Type Posted
Asbestos Survey Report September 2016 Building 2.pdf PDF
Asbestos and LBP Photolog Building 2 Final.pdf PDF
Lead Based Paint Inspection Report Building 2 Final.pdf PDF
PCRA_Replace_Boilers.pdf PDF
36C25726B0006 0005.pdf PDF
ICRA_Replace_Boilers.pdf PDF
36C25726B0006 Site Visit Sign In Sheet.pdf PDF
36C25726B0006 1 Conformed Through Amendment 0004 Current as of 2026.06.12.pdf PDF
36C25726B0006 0004.pdf PDF
36C25726B0006 0001.pdf PDF
36C25726B0006 Boiler Plant Site Visit 2.pdf PDF
36C25726B0006 0003.pdf PDF
36C25726B0006 0002.pdf PDF
Site Visit Instructions Big Spring TX.pdf PDF
36C25726B0006 Solicitation Posting SAM.gov.pdf PDF
Attachment 3 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages62_124.pdf PDF
Attachment 7 Instructions for Calculation of Self-Performed Work.pdf PDF
Attachment 8 Special Standard of Responsibility.pdf PDF
Attachment 5 ICRA Replace Boilers.pdf PDF
36C25726B0006 Solicitation.pdf PDF
Attachment 6 PCRA Replace Boilers.pdf PDF
Attachment 2 519-20-200 VABS AE Replace Boiler 100_Percent_Drawings_Pages1_62.pdf PDF
Attachment 1 519-20-200 VABS AE Replace Boiler 100_Percent_Design Analysis.pdf PDF
Attachment 4 519-20-200 VABS AE Replace Boiler 100_Percent_Specifications.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0006 07-30-2026 519-20-200

Department of Veterans Affairs

OALC NCO 17

Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

Department of Veterans Affairs

OALC NCO 17

Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504

To all Offerors/Bidders

36C25726B0006

X

X X

The purpose of this amendment is to insert two clause, remove a clause, address Schedule of Values (SOV) for invoicing, and provide a question and response.

The awarded contractor shall submit a Schedule of Values (SOV) with each invoice. The contractor may invoice only for SOV line items that have been fully completed during the billing period.

FAR clause 52.249-10 is removed from the solicitation. Terminations for default are governed under FAR clause 52.212-4, which fully addresses termination for cause for commercial items.

Horacio Fernandez Contracting Officer

VA-VHA-RPOW-2026-0001

FAR

Number

Title Date

52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (DEVIATION) ALTERNATE I (NOV

2025)

NOV 2025

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS ALTERNATE I (MAY 2014) AND

ALTERNATE II (NOV 2023)

MAY 2014

Vendor Question:

Drawing EP601 indicates that MCC-B is fed from MCC-A. MCC-A is being replaced under the solicitation. Per a previous RFI response, MCC-B is required to remain energized.

1. Please provide the temporary feed point, drawing details, and scope of work necessary to maintain power to MCC-B during the replacement of MCC-A.

2. Please confirm whether any existing loads currently fed from MCC-A are required to remain energized during MCC-A replacement. If temporary feeding of any loads is required, please provide the temporary power source, associated drawings, and scope of work.

Government Response:

1. MCC-B shall be temporarily fed from the new 400A Temporary Panel “T” as shown on

Drawing ET601.

2. The Government is determining whether any existing loads served by MCC-A must remain energized during replacement. Should temporary power be required for any MCC-A loads, the contractor will be notified, and the Government will identify which loads require temporary power. The contractor shall then confirm whether those loads can be accommodated using the available capacity on Temporary Panel “T,” which currently has approximately 200A spare capacity. MCC-B is expected to draw approximately 140A, leaving an estimated 60A available for any additional temporary load requirements.

36C25726B006 0006 End of Amendment