About this file
Attachment 7 is a Federal Acquisition Regulation (FAR) document detailing restrictions on subcontracting for a disaster or emergency area contract. The document outlines specific requirements for contractors performing work in set-aside areas, mandating that:
For services, at least 50% of contract performance costs for personnel must be expended on employees of the contractor or businesses residing or primarily doing business in the designated area. For supplies, the contractor or local businesses must perform at least 50% of manufacturing costs (excluding material costs). For general construction, the contractor must perform at least 15% of contract costs with local employees, and for special trade construction, at least 25% of contract costs must be performed by local employees or businesses. The document is part of FEMA Invitation for Bid #70FBR425B00000009 and provides a template for contractors to acknowledge these subcontracting restrictions, with space for company name, UEI number, and signature.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.fema.gov
Attachment 7
Invitation for Bid (IFB) #: 70FBR425B00000009
FAR 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area
Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)
(a) Definitions. The definitions of the following terms used in this clause are found in the Small Business Administration regulations at 13 CFR 125.6(e): cost of the contract, cost of contract performance incurred for personnel, cost of manufacturing, cost of materials, personnel, and subcontracting.
(b) The Contractor agrees that in performance of the contract in the case of a contract for-
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The Contractor or employees of other businesses residing or primarily doing business in the set-aside area shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials;
(3) General construction. The Contractor will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees or employees of other businesses residing or primarily doing business in the set-aside area; or
(4) Construction by special trade Contractors. The Contractor will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees or employees of other businesses residing or primarily doing business in the set-aside area.
Company Name and Local Address:
UEI:
Signature
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the Contractor or employees of other businesses residing or primarily doing business in the area designated in the clause at FAR 52.226-4, Notice of Disaster or Emergency Area Set-Aside;
http://www.fema.gov/
FAR 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area