This document is a Questions and Answers attachment for a parking lot resurfacing project at Blue Ridge Community College (BRCC) by the Federal Emergency Management Agency (FEMA). The Q&A addresses seven key inquiries, including details about 402 tent spikes driven into the parking lot during its use as a responder camp, confirmation of a comprehensive 2-inch milling of the entire parking lot, and clarification on subcontracting limitations and on-site supervision requirements. The related federal contract opportunity is a $250,000-$500,000 construction solicitation (70FBR425B00000009) set aside for Service-Disabled Veteran-Owned Small Businesses, with a 45-day performance period from 08/18/2025 to 10/01/2025. The project involves resurfacing and striping the BRCC parking lot after damage from Hurricane Helene, including milling existing asphalt, repaving, painting new lines, and installing new signage to restore the parking area's functionality and safety.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment VII (Questions & Answers)

Below are the specific questions for your review and response:

Question 1:

How many tent spikes were driven into the parking lot?

Government Answer: Approximately 402 tent spikes driven into the parking lot during its use as a responder camp have been identified and marked with orange spray paint. These areas must be evaluated and repaired as part of the scope of work.

Question 2:

Is there an accurate map that shows the full area of work, including the ingress and egress points of the parking lot?

Government Answer: Areal map (Attachments I thru 5) and statement of work (SOW).

Question 3:

Will stormwater plans be included in the scope of work?

Government Answer: No improvements to the stormwater system are required. The existing stormwater system will be maintained as is.

Question 4:

Are there any additional curbing repairs planned?

Government Answer: Per the Scope of Work, curbing repairs will be addressed as specified. See attached photos for reference (Attachment VI).

Question 5:

Is there any restriction on subcontracting, and does the contractor need to be present on-site at all times?

Government Answer: Subcontracting is subject to the limitations outlined in the solicitation and FAR Clause 52.219-14, which requires the prime contractor to perform at least 50% of the cost of contract performance incurred for personnel (excluding materials and supplies). The contractor must provide competent supervision on-site at all times during contract performance, as required by FAR Clause 52.236-6.

Question 6:

Who is the point of contact for coordinating traffic changes and scheduling the usage/training of the lot?

Government Answer: The Contracting Officer Representative (COR) for this project is Carleton Slaughter and Victor Hinojosa Contracting Officer (CO).

Question 7:

Can you confirm whether the entire parking lot is being milled down 2 inches, or if only the damaged areas will be addressed?

Government Answer:

Per the Scope of Work, the entire parking lot will be milled down 2 inches.